Loading...
HomeMy WebLinkAbout029.1 Civil Detail C-50708-01-2025 WEST POND OUTLETSTRUCTURE1" = 1'1.5" Ø ORIFICE BEHINDTRASH RACKSUBMERGED INMICROPOOLEMERGENCYOVERFLOW GRATE3.50'8" PVC TO OUTLET1.00'POND BASE ELEVATIONNOTES:1.ORIFICE SIZE AND RELATIVE PLACEMENT MUST BEMAINTAINED.2.MODIFICATIONS TO OUTLET STRUCTURE AREPERMISSIBLEEAST POND OUTLETSTRUCTURE1" = 1'POND BASE ELEVATIONEMERGENCYOVERFLOW GRATE3" Ø OUTLET3.50'2.50'8" PVC TO OUTLET1.5" Ø ORIFICE BEHINDTRASH RACKSUBMERGED INMICROPOOL1.00'© 2025 SYNERGY ENGINEERING AND KONSULTING (SEAK). THISDRAWING AND ASSOCIATED ELECTRONIC FILES ARE THE WORKPRODUCT OF SEAK AND REUSE OF FILES IS BY LIMITEDPERMISSION FROM SEAK.SHEET Date: Drawn By: Checked By: Revisions: SUNDANCE SPRINGS SUBDIVISION PHASE 1B, COMM LOT 2 BOZEMAN, MT 59715 S25, T2S, R5E Filename:SUNDANCE REDESIGN 6.7 (MARLENE SADAJ'S CONFLICTED COPY 2025-08-01).DWG Sheet:029.1 CIVIL DETAIL C-507 Location:C:\USERS\MARLENE S\ANDERSON ENGINEERING DROPBOX\MARLENE SADAJ\SEAK PROJECTS\SUNDANCE SPRINGS - ROUND 2\CAD\ENGINEERING - CAD Plotted:8/1/2025 Plotted by:MARLENE S 8/01/2025 SV MS 6.7 3731 Equestrian Lane, Suite 102., Bozeman, MT 59718 Phone: (406) 624-6137 SYNERGY ENGINEERING AND KONSULTING C-507STORMWATER DETAILS