HomeMy WebLinkAbout20251021_Commission_College811College St: 8th to 11 th
Renovation
Work Session
1
Bozeman City Commission
October 21, 2025
College St: 8th to 11th
2
The intent of this work session is to gain
Commission approval on scope of improvements
prior to Final Design.
Proposed Scope of Final Design
•All-way stop control at S 8th intersection
•Addition of mid-block crossing between 9th and 10th
•Addition of shared used path along south curb
•Removal of parking lane along south
•Removal of limited driveway cuts along north curb
College St: 8th to 11th
3
Project Vision
•Create a more cohesive interface between
University and Neighborhood
Project Goals
•Improve pavement conditions
•Enhance pedestrian safety and access
•Create safe option for cyclists
•Improve efficiency without sacrificing safety
Project Background
•Recommended as projects MSN-19, SPOT-27,
and BL-9 in 2017 Transportation Master Plan
•Approved as project SIF157 in FY2026-2030
Capital Improvement Plan
•Funded in FY26 Operating Budget
College St: 8th to 11th
4
Project Timeline
•2024: early engagement with University leadership,
student-led walk audit, and businesses
•2025: Pre-design Phase
•Survey and Geotechnical Evaluation
•Traffic Report and Alternatives Analysis
•Public Engagement
•Open House (9/22)
•Transportation Advisory Board (9/24)
•City Commission (10/21)
•2025-2026: Final Design
•Summer 2026: Construction
Project Funding & Cost Estimate
•Budget: $2,465,800 (Arterial & Collector District)
•Current Cost Estimate: $1.3m - $2.9m
College St: 8th to 11th
5
Existing Conditions
•2-lane Minor Arterial
•70’ right-of-way
•5’-6’ sidewalks with minimal boulevard
•No bicycle facility
•13 driveways and 5 alley/street intersections
•Limited street parking on north (14 spaces) and
south (25 spaces) curbs
•2-hr and 2am-7am restrictions
•Pavement Condition Index between 59-73
Traffic Data
•8200 vehicles per day
•LOS C at all intersections (16-24 sec. delay)
•10 reported crashes between 2019-2023
•Weekday parking utilization up to 80% during
class, under 50% off-peak
College St: 8th to 11th
6
Existing Street Section
College St: 8th to 11th
7
Proposed Design – Typical Street Section
College St: 8th to 11th
8
Bicycle & Pedestrian Crossing Volumes
College St: 8th to 11th
9
Parking Utilization
College St: 8th to 11th
10
Design Alternatives – S. 8th Intersection
College St: 8th to 11th
11
S. 8th Intersection Operations
College St: 8th to 11th
12
S. 8th Intersection
Operations
College St: 8th to 11th
13
Design Alternatives – Driveway Access
Concept 1a – Consolidate Driveway Locations
Concept 1b – Maintain Existing Driveway Locations
College St: 8th to 11th
14
Open House Feedback
•Shared Use Path
•Strong general support for facility type
•Some business concern expressed over loss of parking
•Suggestion for MSU to provide land for angled parking
•Mid-block Crosswalk
•Strong support for design features (RRFB, raised x-walk)
•Some preference for marked x-walks at 9th and 10th
•Driveway Access
•Support for most businesses maintaining at least one
access to college
•“NO ROUND-A-BOUT NO WAY”
College St: 8th to 11th
15
Transportation Advisory Board Feedback
•Considerable amount of technical conversation
regarding roundabout and crosswalk design
•General support for proposed scope
•Strong technical support for roundabouts, but
willing to support community feedback
•Attention to parking needs for business(es) that
lack off-street
•Interest in improved landscaping/lighting
Q&A with Staff
&
Commission Direction
16
https://engage.bozeman.net/college
Proposed Scope of Final Design
•All-way stop control at S 8th intersection
•Addition of mid-block crossing between 9th and 10th
•Addition of shared used path along south curb
•Removal of parking lane along south
•Removal of limited driveway cuts along north curb