HomeMy WebLinkAbout10-20-25 Public Comment - R. Pertzborn - UDC Requested Edits_ Transitions 10.20.25From:Rob Pertzborn
To:Bozeman Public Comment
Cc:Chris Saunders; Tom Rogers
Subject:[EXTERNAL][WARNING: ATTACHMENT UNSCANNED]UDC Requested Edits: Transitions 10.20.25
Date:Monday, October 20, 2025 11:07:22 AM
Attachments:UDC Requested Edits - Transitions 2025.10.20.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Greetings –
Please see the attached for review & consideration starting with the Community Development
Board.
Thank you,
RJP
Robert J. Pertzborn AIA Senior Principal | Architect
Intrinsik Architecture, Inc.
106 East Babcock Street Suite 1A Bozeman, Montana 59715
O. 406.582.8988 Direct: 406.426.9557 M. 406.580.0422
20 October 2025
Community Development Board
via Email: Csaunders@bozeman.net
RE: Unified Development Code 9/19 Draft
Subject: Request for Amendment: Transitions
Please accept this memo as a request to amend Section 38.260.070 Transitions.
Objectively, there are several challenges and situations where unintended consequences will
create inequity across property lines. Property evolution is inevitable, and it is fair to consider not
only what is there today but what might be added in the future.
Overall Notes:
- This section is overly complex making it difficult to understand at a high level, which can
lead to confusion and otherwise mask possible inequalities, especially with each speciflc
zoning designation.
- Commercial lots, especially in the core, must be able to evolve to for the health of
downtown.
- These standards appear to presume that “subject lots” will have large mass buildings on
wide frontages, which is not always the case.
o Narrower lots are especially unfairly restricted and could create odd development
patterns
- The subject lot should have the same minimum ability to develop what the abutting lot
zoning allows – before transition restrictions apply.
Transition Types (1A / 1B / 2A / 2B):
- Forcing extra setbacks and designating additional landscaping buffers exacerbates the
inequality factor. Buffers can happen on both sides of property line. 1b & 2b (extra
landscape setbacks on the subject lot) should be eliminated for fairness and clarity.
Diagram Notes:
- Dimension designations of A & B are confusing. Use X & Y.
- Trees should be shown larger (to scale for mature conditions).
- Verify scale of fioors and buildings in all existing diagrams
We would like to request that the attached edits to the transition section. Additionally, please see
the attached diagrams for more context and possible development scenarios.
Thank you for your careful review of the details and considerations,
Tyler Steinway AICP Robert J Pertzborn, AIA
Intrinsik Architecture Intrinsik Architecture
Attachments
- Transition Section with Suggested Edits
- Development Scenario Reference Diagrams
PUBLIC HEARING DRAFT | SEPTEMBER 19, 2025 2-95 UNIFIED DEVELOPMENT CODE | BOZEMAN, MONTANA
ARTICLE 2 - ZONING DISTRICTS
sec. 38.260.070. - Transitions.
A. Zone edges.
1. Purpose.
To help mitigate the impacts of taller buildings on lower intensity zoning districts.
2. Applicability.
Subject lots are required to provide the following transition type as shown in the table below.
Table 38.260.070-1.
REQUIRED DISTRICT TRANSITION
ABUTTING LOT
R-AR-BR-CR-DB-1B-2B-2MB-3B-3CREMUNEHMUB-PM-1M-2PLIRESMXRESMX SUBJECT LOTR-A ----------------------------------
R-B ----------------------------------
R-C ----------------------------------
R-D 1a 1a ------------------1a ----------
B-1 1a 1a 2b 2a ----------2a --2a ----------
B-2 1b 1b 2a 2a ----------2a --1a ----------
B-2M 1b 1b 1a 2a ----------2a --1a ----------
B-3 1b 1b 1a 2a ----------2a --1a ----------
B-3C ----------------------------------
REMU
RES 1a 1a ------------------1a ----------
MX 1a 1a 2a 2a --------------1a ----------
NEHMU
RES ----------------------------------
MX 1a 1a 2a 2a ----------2a --1a ----------
B-P 1b 1b 2a 2a ----------2a --1a ----------
M-1 1b 1b 2a 2a ----------2a --1a ----------
M-2 1b 1b 2b 2b 2b 2b 2b 2b --2b 2b 1b 2b 2b ------
PLI ----------------------------------
Key:1a = Transition Type 1a required 2a = Transition Type 2a required -- = No transition required for subject lot
1b = Transition Type 1b required 2b = Transition Type 1b required
PUBLIC HEARING DRAFT | SEPTEMBER 19, 20252-96 UNIFIED DEVELOPMENT CODE | BOZEMAN, MONTANA
ARTICLE 2 - ZONING DISTRICTS
3. Standards.
a. Type 1a. Height stepback.
Subject LotAbutting Lot
A
b
Table 38.260.070-2.
Type 1a Standards No Alley Alley
A Setback from lot line - up to 3rd story (min)10'5'
B Setback from lot line - above 3rd story (min)22'13'
b. Type 1b. Height stepback with landscaping.
Subject LotAbutting Lot
A
b
Table 38.260.070-3.
Type 1b Standards No Alley Alley
A Setback from lot line - up to 3rd story (min)14'9'
Landscaping in setback (min per 50')Required Not required
Trees 2 large or 3 small n/a
Shrubs 16 n/a
B Setback from lot line - above 3rd story (min)22'13'
PUBLIC HEARING DRAFT | SEPTEMBER 19, 2025 2-97 UNIFIED DEVELOPMENT CODE | BOZEMAN, MONTANA
ARTICLE 2 - ZONING DISTRICTS
c. Type 2a. Horizontal setback.
Subject LotAbutting Lot
A
Table 38.260.070-4.
Type 2a Standards No Alley Alley
A Setback from lot line (min)10'5'
d. Type 2b. Horizontal setback with landscaping.
Subject LotAbutting Lot
A
Table 38.260.070-5.
Type 2b Standards No Alley Alley
A Setback from lot line (min)14'9'
Landscaping in setback (min per 50')Required Not required
Trees 2 large or 3 small n/a
Shrubs 16 n/a
PUBLIC HEARING DRAFT | SEPTEMBER 19, 20252-98 UNIFIED DEVELOPMENT CODE | BOZEMAN, MONTANA
ARTICLE 2 - ZONING DISTRICTS
e. Rules for Type 1a and Type 1b:
(1) Where a lot is adjacent to an RA or RB district, all setback distances must be increased by
3 feet.
(2) For subject lots facing RA and RB districts, and fronting a right-of-way less than 60 feet
wide, the upper level(s) of a building must be stepped back from the front property lines
according to the height stepback standard.
f. Rules for all transition types.
(1) Required transition types must be located along side and rear lot lines extending inward
to the subject property, or front property lines where the street right-of-way width is less
than 60 feet. Transition types cannot extend into, or be located within, any portion of an
existing street right-of-way.
(2) No buildings or structures, except for walls or fences, are allowed in the transition
setback area.
(3) Except when abutting an alley, no parking area, driveway or fire lane is allowed in the
transition setback area.
(4) Required landscaping must meet 38.540.
4. Measurement.
a. All building setbacks are measured from the lot line - see 38.260.060.
b. When the entire building is set back from the lot line at least 22 feet, the building can go
straight up - no step back is required.
Figure 38.260.070-1. Horizontal transition measurement.
Subject LotAbutting Lot
22’
5. Relief
Relief of up to 10% of a dimensional standard may be granted due to irregular shaped lots,
topography, utility access, existing or required easements, or preexisting natural features.