Loading...
HomeMy WebLinkAbout032 SW1.4 Stormwater Plan 4PROJECT NO:DATE:ENGINEER:REVISIONSDATENO.DESC.325-05CHICK-FIL-A SITE PLAN APPLICATION BOZEMAN, MONTANA STORMWATER DETAILSSW 1.44/23/2025JSSTORM DRAIN MANHOLE1SCALE: NTSSOURCE: CITY OF BOZEMAN STD DWG NO. 02720-3STORM DRAIN MANHOLE2SCALE: NTSSOURCE: CITY OF BOZEMAN STD DWG NO. 02720-1BSTORM DRAIN MANHOLE3SCALE: NTSSOURCE: CITY OF BOZEMAN STD DWG NO. 02720-1BOUTLET VELOCITY DISSIPATION4SCALE: NTSSOURCE: MDT BMP MANUAL - DECEMPBER 2016CONTECH HYDRODYNAMIC SEPERATOR5SCALE: NTSFOR REVIEWBRIDGER POINT