Loading...
HomeMy WebLinkAbout028 S0.0 Structural Cover PageN PROJECT NO: DATE: ENGINEER: REVISIONS DATENO.DESC. 325-05MASTER SITE PLANCOVER PAGEBOZEMAN, MONTANABRIDGER POINTMASTER SITE PLAN BRIDGER POINT GARDNER SIMMENTAL PLAZA S35, T01S, R05E, LOT 1A, ACRES 5.485 AMENDED PLAT J-5-F ADDRESS: 3204 N 19TH AVE E V A L L E Y C E N T E R R D VICINITY MAP, NOT TO SCALE 8/12/25 JLS A TRACT OF LAND DESCRIBED IN QUITCLAIM DEED RECORDED AS DOCUMENT #2821959 BEING; A PORTION OF LOTS 1, 2, & 3, OF TRACT 1 OF GARDNER SIMMENTAL PLAZA SUBDIVISION PLAT J-5, AND THOSE PORTIONS OF THE ABANDONED AND VACATED STREET RIGHT OF WAYS PER RESOLUTION 5564 RECORDED AS DOCUMENT #2819075 LOCATED IN THE NORTHEAST QUARTER OF SECTION 35, TOWNSHIP 1 SOUTH, RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA, MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT AN 2" ALPINE ALUMINUM CAP, FROM WHICH THE SOUTHWEST CORNER OF SAID LOT 3, TRACT 1, A 1" O.D. PIPE BEARS S 89°25'56" W A DISTANCE OF 24.02'; THENCE ALONG A NON-TANGENTIAL CURVE CONCAVE TO THE EAST 478.71', HAVING A RADIUS OF 3169.04', A CHORD BEARING OF N 11°06'29" E AND A CHORD LENGTH OF 478.25' TO AN ALPINE ALUMINUM CAP; THENCE ALONG A SPIRAL CHORD, N 15°53'35" E AND A DISTANCE OF 74.19' TO A ALPINE ALUMINUM CAP; THENCE N 78°30'11" E A DISTANCE OF 76.66' TO A ALPINE ALUMINUM CAP; THENCE S 52°43'01" E A DISTANCE OF 233.99' TO ALPINE ALUMINUM CAP; THENCE ALONG A NON-TANGENTIAL CURVE CONCAVE TO THE SOUTHWEST 511.35', HAVING A RADIUS OF 879.93', A CHORD BEARING OF S 36°04'09" E AND A CHORD LENGTH OF 504.18' TO AN ALPINE ALUMINUM CAP; THENCE S 89°25'56" W A DISTANCE OF 670.63' TO THE POINT OF BEGINNING, CONTAINING 5.485 ACRES MORE OR LESS. SHEET INDEX S0.0 - COVER PAGE S1.0 - EXISTING CONDITIONS S1.1 - MASTER SITE PLAN S1.2 - S1.4 - SITE GENERAL DETAILS U1.1 - GENERAL UTILITY PLAN U1.2 - UTILITY DETAILS L1 of 9 TO L9 of 9 - PH 2 HOTEL LANDSCAPE AND IRRIGATION PLAN L1 - L9 - PH 1 CFA LANDSCAPE AND IRRIGATION PLAN SW1.0 - STORMWATER OVERVIEW P0.0 - PHASING AND CONSTRUCTION PLAN D0.0 - DEMOLITION PLAN SHEET 1 OF 1 - AMENDED PLAT NO. J-5-F SHEET 1 OF 1 - CONDO EXHIBIT FOR REVIEW LEGEND SUBJECT PROPERTY BOUNDARY ADJACENT PROPERTY BOUNDARY SETBACK EASEMENT WATER MAIN W F WATER VALVE WATER CURB STOP WATER BLOW-OFF FIRE HYDRANT FIRE SERVICE LINE 8''W WATER SERVICE LINEW F 8''W 8''SS 4''SS SANITARY SEWER MAIN8''SS 4''SS ST SANITARY SEWER SERVICE SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT STORM SEWER MAIN STORM MANHOLE ST GAS UGE CURB INLET STORM CATCH BASIN GAS LINEGAS ELEC COMM UNDERGROUND ELECTRIC LINE COMM UNDERGROUND COMMUNICATIONS LINE ELECTRIC TRANSFORMER / JUNCTION CAN TELEPHONE BOX CATCH CURB AND GUTTER STORM POND / SWALE CONTOUR LINE SPOT ELEVATION EXISTING PROPOSED DESCRIPTION OSWOSW W VW V WBOWBO DYH HY DSSSS COCO ST TT [00.00](00.00) 44004400 FINISH FLOOR ELEVATION"FFE" TOP OF WALL"TOW" TOP BACK OF CURB"TBC" FLOW LINE"FL" EDGE OF ASPHALT"EA" SIDEWALK"SW" HIGH-POINT"HP" LOW POINT"LP" TRAFFIC DIRECTION ARROW (NOT A PAVEMENT MARKING) SNOW STORAGE AREA SPILL CURB DROP CURB AND GUTTER ADA CERTIFICATION THE OWNERS OF THIS PROJECT ACKNOWLEDGE OF STATE AND LOCAL ACCESSIBILITY REQUIREMENTS. CLIENT 9019 LLC 1612 GOLD AVENUE BOZEMAN, MT 59715 TEL: (406) 624 3630 CONTACT: CRAIG RICKERT SEE PH 1 SITE PLAN APPLICATION COVER FOR PH 1/CFA OWNERSHIP GEOTECHNICAL TERRACON CONSULTANTS, INC 2110 OVERLAND AVENUE BILLINGS, MT 59102 406 656 3072, JAMES PIERCE, PE RAWHIDE ENGINEERING, INC 6871 KING AVENUE WEST SUITE G1K BILLINGS, MT 406 969 5305, JASON FRANK ARCHITECT PH 1: SEE PH 1 CFA SITE PLAN APPLICATION COVER LETTER PH 2: DRURY DEVELOPMENT, TBD ENGINEER/SURVEY ALPINE SURVEYING AND ENGINEERING, INC 714 STONERIDGE DR SUITE 3 BOZEMAN, MT 59718 406 586 5599, JULIENE SINCLAIR, PE OVERALL PROJECT SITE DATA - BRIDGER POINT LEGAL DESCRIPTION: GARDNER SIMMENTAL PLAZA S35, T01S, R05E, LOT 1A, ACRES 5.485 AMENDED PLAT J-5-F OVERALL LAND AREA: 5.485 ACRES/238,926 SF CONDOMINIUM AREAS UNIT 1 LAND AREA: 2.642 ACRES/115,085 SF UNIT 2 LAND AREA: 1.759 ACRES/76,622 SF COMMON LAND AREA: 1.084 ACRES/47,219 SF PHASE AREAS PHASE 1 LAND AREA: 2.84 ACRES/123,838 SF PHASE 2 LAND AREA: 2.64 ACRES/115,094 SF ZONING: B-2 - COMMUNITY BUSINESS USES:PHASE 1 - RESTAURANT W/DRIVE-THRU PHASE 2 - BUSINESS HOTEL BUILDING AREAS: RESTAURANT: BUILDING FOOTPRINT - 6,320 SF BUILDING HEIGHT - 25 FT FLOOR SERVICE AREA - 2,662 SF PATIO AREA - 1,500 SF BUSINESS HOTEL: BUILDING FOOTPRINT - 22,000 SF MAXIMUM BUILDING HEIGHT - 50 FT; MAXIMUM HEIGHT MAY BE INCREASED BY UP TO A MAXIMUM OF 50 PERCENT WHEN THE ZONING DISTRICT IS IMPLEMENTING A REGIONAL COMMERCIAL AND SERVICES GROWTH POLICY LAND USE DESIGNATION. PROPOSED BUILDING HEIGHT: 75 FT TO TOP OF FLAT ROOF; 83 FT TO TOP OF PARAPET ROOMS - 180 MAXIMUM EMPLOYEES PER SHIFT - 10 PUBLIC RESTAURANT, BAR, DINING AREA - 0 SF COMMERCIAL SALES AREA - 0 SF PUBLIC ASSEMBLY AREAS - 225 SEATS PARKING: PARKING REQUIRED: RESTAURANT SERVICE AREA: 1/50SF - 53 SPACES RESTAURANT PATIO AREA: 1/100 SF - 15 SPACES RESTAURANT TOTAL - 68 SPACES BUSINESS HOTEL: 1.1/GUEST ROOM - 198 SPACES BUSINESS HOTEL EMPLOYEES: 1/EMPLOYEE MAX SHIFT - 10 SPACES BUSINESS HOTEL PUBLIC RESTAURANT, BAR, DINING ARES: 1/60 SF - 0 SPACES BUSINESS HOTEL COMMERCIAL SALES AREA: 1/400 SF - 0 SPACES BUSINESS HOTEL PUBLIC ASSEMBLY AREA: 1 SPACE FOR EACH 5 SEATS BASED UPON DESIGN CAPACITY, EXCEPT THAT TOTAL OFF-STREET PARKING FOR PUBLIC ASSEMBLY MAY BE REDUCED BY 1 SPACE FOR EVERY 4 GUEST ROOMS - 225 SEATS - 0 SPACES HOTEL TOTAL - 208 PARKING REQUIRED: 276 SPACES (BEFORE REDUCTIONS) ALLOWABLE PARKING REDUCTIONS: TRANSIT AVAILABILITY: 10% REDUCTION - 28 SPACES TOTAL PARKING REQUIRED WITH REDUCTIONS: 248 SPACES PARKING PROVIDED: 264 SPACES STANDARD - 234 SPACES (INCLUDING 9 REQUIRED HC SPACES) COMPACT - 30 SPACES (11.45%) BICYCLE PARKING REQUIRED: (10% PARKING) - 28 SPACES BICYCLE PARKING PROVIDED: 28 SPACES 8 - OUTDOOR SPACES - RESTAURANT 20 - OUTDOOR SPACES - BUSINESS HOTEL PHASE 1 BLOCK FRONTAGE TYPE: MIXED - PARK TRAIL FRONTAGE PHASE 2 BLOCK FRONTAGE: GATEWAY - 19TH AVE FRONTAGE OTHER - EAST/WEST COMMON DRIVE