HomeMy WebLinkAbout006.1 L6 Irrigation PlanN 19TH AVE
SS
SS
SS
cccIRIRIRBOLSSSSSSSSSSSSSSSSSSSSSSWWWSSSSSSSSSSSSSSGGGGGG PPPPPPPPPPPPPPPPPPS78°30'11"W 2045.51
'N52°43'01"W 2045.51'S15°53'35"W 2045.51'Δ=6°11'37"R=3169.04L=342.56
N52°43'01"W 2045.51'WFor:Title:
22282
9019 LLC
1612 GOLD AVENUE
BOZEMAN, MT 59715
for
BRIDGER POINT
GARDNER SIMMENTAL LOT A, TRACT 1
BOZEMAN, MT9 Dial 811Call before you dig.Know what's below.Or 1-800-551-8344SIGNED 08/28/25SCALE: 1"=20'IRRIGATION PLAN - NORTHL6
IRRIGATION PLAN - NORTH
SEE PHASE 1 UNDER SEPARATE SUBMITTALMATCHLINE - SEE SHEET L5PHASE 1CHICK-FIL-ANOT A PARTSEE SEPARATESUBMITTALN. 19TH AVE.PROPERTYLINE ANDRIGHT-OF-WAY LINEPHASELINECOORDINATE SLEEVEINSTALLATION WITHINSTALLATION OFPAVEMENTS, CURBS ANDOTHER HARDSCAPE, TYP.POINT OF CONNECTION: DOUBLECHECK ASSEMBLY, MASTER VALVE,FLOW SENSOR QUICK COUPLER ANDMAINLINE TO PHASE 1 IRRIGATIONARE TO BE INSTALLED AS PART OFPHASE 1. CONTRACTORS FORPHASES 1 AND 2 SHALL COORDINATEWITH EACH OTHER AND OWNERS.AS PART OF PHASE 1 -IRRIGATION MAINLINE ISTO BE INSTALLEDADJACENT TO PHASE 2PROPERTY LINE ANDCONNECTED TO EXISTINGWELL WATER SUPPLY. SEESHEET L5 FORCONTINUATION.CONNECT TO STUBOUTPROVIDED IN PHASE 1AND CONTINUEMAINLINE AS SHOWNTHE PHASE 2 RIGHT-OF-WAYIRRIGATION IS PART OF THEPHASE 1 IRRIGATION SYSTEMFOR THE COMMON OPENSPACE. SEE PHASE 1 FORLOCATION OF THECONTROLLER AND RAINSENSOR.EXISTING IRRIGATIONWELL TO BE THESOURCE OF WATERFOR THE IRRIGATIONSYSTEM FOR PHASES1 AND 2.LANDSCAPE AND IRRIGATIONPLANS AND DETAILS FORPHASE 2 ARE CONCEPTUALAND SUBJECT TO CHANGEBASED ON THE FINAL SITEPLAN APPLICATION FOR PHASE2 AND CURRENT CITY CODESAT THAT TIME.EXISTINGMONITORINGWELL - NOT FORIRRIGATION