HomeMy WebLinkAbout006.1 L5 Irrigation PlanN 19TH AVE
HOTEL(180 ROOMS)SS
SS
SS
GASGASUGEUGEUGECOMMCOMMCOMMGASEJBSSSSSSSSSSSSSSSSWWWWWWWWWWWWWW W
WWWWWWWWWWWWW WWWWFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FOFO
XXXXXXXXXXXXGGGGGGGGGGGGTTTT TTTT
TTTTTTTTTTTTTTΔ=6°11'37"R=3169.04L=342.56Δ=2°27'41"R=3169.04L=136.14
N89°25'56"E 2045.51'’® NOTE: P.O.C. INSTALLATIONIS PART OF PHASE 1 - SEESEPARATE SUBMITTALFor:Title:
22282
9019 LLC
1612 GOLD AVENUE
BOZEMAN, MT 59715
for
BRIDGER POINT
GARDNER SIMMENTAL LOT A, TRACT 1
BOZEMAN, MT9 Dial 811Call before you dig.Know what's below.Or 1-800-551-8344SIGNED 08/28/25SCALE: 1"=20'IRRIGATION PLAN - SOUTHL5
IRRIGATION PLAN - SOUTH
SEE PHASE 1 UNDER SEPARATE SUBMITTALSEE PHASE 1 UNDERSEPARATE SUBMITTALMATCHLINE - SEE SHEET L6PHASE 1CHICK-FIL-ANOT A PARTSEE SEPARATESUBMITTALPHASE 1ACCESS DRIVE & TRAILNOT A PARTSEE SEPARATE SUBMITTALN. 19TH AVE.PROPERTYLINE ANDRIGHT-OF-WAY LINEPHASELINESIDEWALK IS PART OF PHASE2. SEE PHASE 1 SUBMITTALFOR CURB AND GUTTER.PHASELINESEE SEPARATESUBMITTAL FORIRRIGATION WITHINSHARED AMENITY SPACE.COORDINATE SLEEVE INSTALLATIONWITH INSTALLATION OF BUILDING,PAVEMENTS, CURBS AND OTHERHARDSCAPE, TYP.AS PART OF PHASE 1 - IRRIGATIONMAINLINE IS TO BE INSTALLEDADJACENT TO PHASE 2 PROPERTYLINE (OR AS DIRECTED IN WRITINGBY OWNER AND APPROVED BY THECITY) AND CONNECTED TOEXISTING IRRIGATION WELLWATER SUPPLY. SEE SHEET L6FOR CONTINUATION.CONNECT TO STUBOUTPROVIDED IN PHASE 1 ANDCONTINUE MAINLINE ASSHOWNSEE SEPARATE PHASE 1SUBMITTAL FOR THESETWO GATE VALVES &MAINLINE TO PHASE 1.SEE SEPARATEPHASE 1 SUBMITTALFOR THIS PORTIONOF MAINLINEPROPERTYLINE ANDRIGHT-OF-WAY LINERIGHT OF WAY IRRIGATIONNORTH OF THE ENTRANCEDRIVE IS PART OF THE PHASE2 IRRIGATION SYSTEM. SEEPHASE 1 FOR LOCATION OFTHE ROW ZONE VALVES,CONTROLLER AND RAINSENSOR.10 FT. WIDE SHARED USE PATHACCESS DRIVE-SEE PHASE 1.SEE SEPARATE PHASE 1 SUBMITTALFOR THIS ZONE VALVE AND LATERALCONNECTING TO STREET TREE SOUTHOF ENTRANCE DRIVE.SEE SEPARATE PHASE 1 SUBMITTALFOR THIS SLEEVE AND MAINLINECONNECTING TO PHASE 1.THE PROPOSED SHARED USEPATH AND IRRIGATIONSOUTH OF THE ENTRANCEDRIVE WITHIN THE RIGHT-OF-WAY IS PART OF PHASE 1SEE SEPARATE SUBMITTAL FOR THESE TWO CONTROL VALVES FORTHE RIGHT OF WAY INSTALLED IN PHASE 1. CONNECT TO STUB OUTSPROVIDED IN PHASE 1. EXTEND ZONE 1RW TO THE STREET TREESNORTH OF THE ACCESS DRIVE, EXTEND ZONE 2RW TO COVER DRIPIRRIGATION IN THE RIGHT OF WAY NORTH OF THE ACCESS DRIVE.THIS LATERAL EXTENDSTO ONE STREET TREESOUTH OF THE ACCESSDRIVE INSTALLED INPHASE 1 -SEESEPARATE SUBMITTAL.PHASELINESIDEWALK AND CURB / GUTTERARE PART OF PHASE 2 THISSIDE OF PROJECT. SEE CIVILPLANS FOR PHASES 1 AND 2LANDSCAPE AND IRRIGATIONPLANS AND DETAILS FORPHASE 2 ARE CONCEPTUALAND SUBJECT TO CHANGEBASED ON THE FINAL SITEPLAN APPLICATION FOR PHASE2 AND CURRENT CITY CODESAT THAT TIME.