HomeMy WebLinkAbout030_I1.7_IRRIGATION_PLAN.pdfS
SHED
FUTURE STORAGE GROUNDWATER:4737.30POND BOTTOM:4740.30PONDSTORMWATER RETENTION MATCH LINE
MATCH LINE
PROJECT LIMITS FLANDERS MILL ROADMATCH LINEMATCH LINED2
18.0
D3
24.0
D5
72.0
D4
24.0
1-1/2"
1"
1-1/2"1-1/2"
1"
3"
1"
1"
2"
1-1/2"
1-1/2"
8"
4"
4"
D1
22.2
1"
1"
1"
1"
1-1/2"
GL
ARCHITECT.
CONSENT OF THE LANDSCAPE
OR OWNER WITHOUT WRITTEN
OTHER PURPOSE, LOCATION,
IS NOT TO BE USED FOR ANY
SPECIFICALLY FOR THIS SITE AND
IT HAS BEEN PREPARED
OF THE LANDSCAPE ARCHITECT.
THIS DRAWING IS THE PROPERTY
STEINER THUESEN PLLC
2025
COPYRIGHT
SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE:
REV:
REV:
DATE:
CHECKED BY:
DATE:
DRAWN BY:GSG
6/27/25
NGS
6/27/25
-
-
P L L C
GOLF COURSE ARCHITECTURE
IRRIGATION DESIGN
LANDSCAPE ARCHITECTURE
1925 GRAND AVE. SUITE 105
P.O. BOX 22943
BILLINGS, MT 59104
406/252-5545 FAX 245-9855
THUESEN
STEINER
KEY MAP:
NATHAN
STEINER
143
G
CNLADS
APE ARCHITECTOMNTANA
R
EG
ISTERED
I1.7
I1.7 IRRIGATION PLAN.DGNIRRIGATION PLAN0 10'20'40'NORTH
KEY NOTES:
1 INSTALL DI CAP AND T-BLOCK.
1
1
2
8" MAINLINE NIC - FUTURE PHASE.2