Loading...
HomeMy WebLinkAbout029_I1.6_IRRIGATION_PLAN.pdfS D D 4739 4740 4741 4742474347394740474047414741474247424739 47 4 2 4743 MATCH LINE MATCH LINE MATCH LINE RETENTION POND SYNTHETIC TURF FIELD MATCH LINEMATCH LINEMATCH LINEMATCH LINEMATCH LINE D30 70.5 D29 70.5 D26 18.0 D28 37.7 D6 3.0 D27 2.7 6" 6" 6" 1" 2" 3" 2" 1" 1-1/2" 1-1/2" 3" 1"1" 1" 1" 1" 1" 4" GL 4" 4" 4"8" 4" GL 4" 4" 8" 4" 1" 1" 1-1/2" 1" 1" D 1" TOILET VAULT 1-1/2" 2" ARCHITECT. CONSENT OF THE LANDSCAPE OR OWNER WITHOUT WRITTEN OTHER PURPOSE, LOCATION, IS NOT TO BE USED FOR ANY SPECIFICALLY FOR THIS SITE AND IT HAS BEEN PREPARED OF THE LANDSCAPE ARCHITECT. THIS DRAWING IS THE PROPERTY STEINER THUESEN PLLC 2025 COPYRIGHT SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE: REV: REV: DATE: CHECKED BY: DATE: DRAWN BY:GSG 6/27/25 NGS 6/27/25 - - P L L C GOLF COURSE ARCHITECTURE IRRIGATION DESIGN LANDSCAPE ARCHITECTURE 1925 GRAND AVE. SUITE 105 P.O. BOX 22943 BILLINGS, MT 59104 406/252-5545 FAX 245-9855 THUESEN STEINER KEY MAP: NATHAN STEINER 143 G CNLADS APE ARCHITECTOMNTANA R EG ISTERED I1.6 I1.6 IRRIGATION PLAN.DGNIRRIGATION PLAN0 10'20'40'NORTH KEY NOTES: 1 TO ACCOMMODATE FENCE. INSTALL LATERALS & SPRINKLERS 12" OFF OF EDGE OF PAVEMENT COIL 6' OF CONTROL WIRE IN VALVE BOX FOR FUTURE USE. INSTALL ELECTRIC CONTROL VALVE, DO NOT CONNECT TO WIRE.2 INSTALL DI CAP AND T-BLOCK.3 1 3 2 8" MAINLINE NIC - FUTURE PHASE.4 3 4 4 5 SEE 6/I2.3 FOR CONTROLLER SOLAR POWER REQUIREMENTS.5