Loading...
HomeMy WebLinkAbout025_I1.2_IRRIGATION_PLANS D D D 4743474347444743 4744 4745 ARCHITECT. CONSENT OF THE LANDSCAPE OR OWNER WITHOUT WRITTEN OTHER PURPOSE, LOCATION, IS NOT TO BE USED FOR ANY SPECIFICALLY FOR THIS SITE AND IT HAS BEEN PREPARED OF THE LANDSCAPE ARCHITECT. THIS DRAWING IS THE PROPERTY STEINER THUESEN PLLC 2025 COPYRIGHT SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE: REV: REV: DATE: CHECKED BY: DATE: DRAWN BY:GSG 6/27/25 NGS 6/27/25 - - P L L C GOLF COURSE ARCHITECTURE IRRIGATION DESIGN LANDSCAPE ARCHITECTURE 1925 GRAND AVE. SUITE 105 P.O. BOX 22943 BILLINGS, MT 59104 406/252-5545 FAX 245-9855 THUESEN STEINER KEY MAP: NATHAN STEINER 143 G CNLADS APE ARCHITECTOMNTANA R EG ISTERED MATCH LINE MATCH LINE FUTURE SYNTHETIC TURF FIELD OAK STREETCOTTONWOOD ROADMATCH LINEMATCH LINED21 39.3 D19 8.0 D22 26.0 D20 12.0 D15 24.0 D14 98.1 D16 24.0 D17 3.8 D18 34.8 1" 1" 1-1/2" 1" 1" 1-1/2"1"1" 1"1-1/2" 2" 1" 1-1/2" 1" 1-1/2" 1" 1" 1" 1-1/2" 1-1/2" 3" 1-1/2" 1-1/2" 1" 1" 1" 2"1" 1-1/2" 1" 1" 4" GL 4" 3"3"3"4" 1"1" 1" 1" 1-1/2" GL I1.2 I1.2 IRRIGATION PLAN.DGNIRRIGATION PLAN0 10'20'40'NORTH KEY NOTES: 1 TO ACCOMMODATE FENCE. INSTALL LATERALS & SPRINKLERS 12" OFF OF EDGE OF PAVEMENT 1 INSTALL DI CAP & T-BLOCK.2 END 2-WIRE PATH AT VALVE. TERMINATE LATERAL TEE.3 4 NIC - FUTURE PHASE 3 4 3 3 3 3 2