HomeMy WebLinkAbout025_I1.2_IRRIGATION_PLANS
D
D D 4743474347444743
4744
4745
ARCHITECT.
CONSENT OF THE LANDSCAPE
OR OWNER WITHOUT WRITTEN
OTHER PURPOSE, LOCATION,
IS NOT TO BE USED FOR ANY
SPECIFICALLY FOR THIS SITE AND
IT HAS BEEN PREPARED
OF THE LANDSCAPE ARCHITECT.
THIS DRAWING IS THE PROPERTY
STEINER THUESEN PLLC
2025
COPYRIGHT
SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE:
REV:
REV:
DATE:
CHECKED BY:
DATE:
DRAWN BY:GSG
6/27/25
NGS
6/27/25
-
-
P L L C
GOLF COURSE ARCHITECTURE
IRRIGATION DESIGN
LANDSCAPE ARCHITECTURE
1925 GRAND AVE. SUITE 105
P.O. BOX 22943
BILLINGS, MT 59104
406/252-5545 FAX 245-9855
THUESEN
STEINER
KEY MAP:
NATHAN
STEINER
143
G
CNLADS
APE ARCHITECTOMNTANA
R
EG
ISTERED
MATCH LINE
MATCH LINE
FUTURE SYNTHETIC TURF FIELD
OAK STREETCOTTONWOOD ROADMATCH LINEMATCH LINED21
39.3
D19
8.0
D22
26.0
D20
12.0
D15
24.0
D14
98.1
D16
24.0
D17
3.8
D18
34.8
1"
1"
1-1/2"
1"
1"
1-1/2"1"1"
1"1-1/2"
2"
1"
1-1/2"
1"
1-1/2"
1"
1"
1"
1-1/2"
1-1/2"
3"
1-1/2"
1-1/2"
1"
1"
1"
2"1"
1-1/2"
1"
1"
4"
GL
4"
3"3"3"4"
1"1"
1"
1"
1-1/2"
GL
I1.2
I1.2 IRRIGATION PLAN.DGNIRRIGATION PLAN0 10'20'40'NORTH
KEY NOTES:
1 TO ACCOMMODATE FENCE.
INSTALL LATERALS & SPRINKLERS 12" OFF OF EDGE OF PAVEMENT
1
INSTALL DI CAP & T-BLOCK.2
END 2-WIRE PATH AT VALVE.
TERMINATE LATERAL TEE.3
4
NIC - FUTURE PHASE
3
4
3
3
3
3
2