HomeMy WebLinkAbout019_L1.7_PLANTING_PLANS
MATCH LINE
MATCH LINE
PROJECT LIMITS FLANDERS MILL ROAD3BHS
3CBS
1QUA
1WRB
2DY
5SS
MATCH LINEMATCH LINEARCHITECT.
CONSENT OF THE LANDSCAPE
OR OWNER WITHOUT WRITTEN
OTHER PURPOSE, LOCATION,
IS NOT TO BE USED FOR ANY
SPECIFICALLY FOR THIS SITE AND
IT HAS BEEN PREPARED
OF THE LANDSCAPE ARCHITECT.
THIS DRAWING IS THE PROPERTY
STEINER THUESEN PLLC
2025
COPYRIGHT
SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE:
REV:
REV:
DATE:
CHECKED BY:
DATE:
DRAWN BY:GSG
6/27/25
NGS
6/27/25
-
-
P L L C
GOLF COURSE ARCHITECTURE
IRRIGATION DESIGN
LANDSCAPE ARCHITECTURE
1925 GRAND AVE. SUITE 105
P.O. BOX 22943
BILLINGS, MT 59104
406/252-5545 FAX 245-9855
THUESEN
STEINER
KEY MAP:
NATHAN
STEINER
143
G
CNLADS
APE ARCHITECTOMNTANA
R
EG
ISTERED
L1.7
L1.7 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH
KEY NOTES:
1 -