Loading...
HomeMy WebLinkAbout018_L1.6_PLANTING_PLANS D D 4739 4740 4741 4742474347394740474047414741474247424739 4 7 4 2 4743 MATCH LINE MATCH LINE MATCH LINE RETENTION POND SYNTHETIC TURF FIELD 1RDM 1QUA 1QUA 1QUA 1WRB 1QUA 1QUA 1SAL 1SAL 1FRM 3RRM 3RRM 1WRB 2DR 1DY 2SS 2DY 3DR 6DR 2DY 2SS 1SS 3DR 2DY IHL MATCH LINEMATCH LINEIHL IHL 1NHL MATCH LINEMATCH LINEMATCH LINE 6GF6GF 7KF TOILET VAULT ARCHITECT. CONSENT OF THE LANDSCAPE OR OWNER WITHOUT WRITTEN OTHER PURPOSE, LOCATION, IS NOT TO BE USED FOR ANY SPECIFICALLY FOR THIS SITE AND IT HAS BEEN PREPARED OF THE LANDSCAPE ARCHITECT. THIS DRAWING IS THE PROPERTY STEINER THUESEN PLLC 2025 COPYRIGHT SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE: REV: REV: DATE: CHECKED BY: DATE: DRAWN BY:GSG 6/27/25 NGS 6/27/25 - - P L L C GOLF COURSE ARCHITECTURE IRRIGATION DESIGN LANDSCAPE ARCHITECTURE 1925 GRAND AVE. SUITE 105 P.O. BOX 22943 BILLINGS, MT 59104 406/252-5545 FAX 245-9855 THUESEN STEINER KEY MAP: NATHAN STEINER 143 G CNLADS APE ARCHITECTOMNTANA R EG ISTERED L1.6 L1.6 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH KEY NOTES: 1 - 1 L2.2