HomeMy WebLinkAbout018_L1.6_PLANTING_PLANS
D
D
4739
4740
4741
4742474347394740474047414741474247424739
4
7
4
2
4743
MATCH LINE MATCH LINE
MATCH LINE
RETENTION POND
SYNTHETIC TURF FIELD
1RDM
1QUA 1QUA
1QUA
1WRB
1QUA
1QUA
1SAL 1SAL
1FRM
3RRM
3RRM
1WRB
2DR
1DY
2SS
2DY
3DR
6DR
2DY
2SS
1SS
3DR
2DY
IHL
MATCH LINEMATCH LINEIHL
IHL
1NHL MATCH LINEMATCH LINEMATCH LINE
6GF6GF
7KF
TOILET
VAULT
ARCHITECT.
CONSENT OF THE LANDSCAPE
OR OWNER WITHOUT WRITTEN
OTHER PURPOSE, LOCATION,
IS NOT TO BE USED FOR ANY
SPECIFICALLY FOR THIS SITE AND
IT HAS BEEN PREPARED
OF THE LANDSCAPE ARCHITECT.
THIS DRAWING IS THE PROPERTY
STEINER THUESEN PLLC
2025
COPYRIGHT
SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE:
REV:
REV:
DATE:
CHECKED BY:
DATE:
DRAWN BY:GSG
6/27/25
NGS
6/27/25
-
-
P L L C
GOLF COURSE ARCHITECTURE
IRRIGATION DESIGN
LANDSCAPE ARCHITECTURE
1925 GRAND AVE. SUITE 105
P.O. BOX 22943
BILLINGS, MT 59104
406/252-5545 FAX 245-9855
THUESEN
STEINER
KEY MAP:
NATHAN
STEINER
143
G
CNLADS
APE ARCHITECTOMNTANA
R
EG
ISTERED
L1.6
L1.6 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH
KEY NOTES:
1 -
1
L2.2