Loading...
HomeMy WebLinkAbout015_L1.3_PLANTING_PLAN474447454746474 3 4744 4745 4746 4747 47484749SYNTHETIC TURF FIELD PROJECT LIMITS FUTURE DOG PARK 4GL 1NHL 1SAL 1NHE 1NHE 1NHE 1MLL 1MLL 1MLL 1MLL 1QUA 1QUA 1QUA 1SAL 1SAL 1SAL1SAL 3FG 8GL 9GF 4GL 3FG 2HM 2GL 7KF 2BU 2BU 4GL 6HM 2DR 1DY 2SS 2DY 3DR OAK STREET 1NHL1NHL 1RDL 1RDL 1RDL 1RDL 1RDL 1SAL 1SAL 1SAL 1SAL 1MLL 1RDL 7GF 4BO 4BO 9HM 5SN 13GL 8GF 6BO 9BU 14HM 11KF 11FG 6KF 9GL 11BO 12GL 7SN 2HM 2GL 1SAL 17KF MATCH LINEMATCH LINE1NHL 1NHL MATCH LINEMATCH LINEMATCH LINE VIS ION TR IANGLEVISION T RI ANGL E 1SAL VISION TRIANGLE ARCHITECT. CONSENT OF THE LANDSCAPE OR OWNER WITHOUT WRITTEN OTHER PURPOSE, LOCATION, IS NOT TO BE USED FOR ANY SPECIFICALLY FOR THIS SITE AND IT HAS BEEN PREPARED OF THE LANDSCAPE ARCHITECT. THIS DRAWING IS THE PROPERTY STEINER THUESEN PLLC 2025 COPYRIGHT SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE: REV: REV: DATE: CHECKED BY: DATE: DRAWN BY:GSG 6/27/25 NGS 6/27/25 - - P L L C GOLF COURSE ARCHITECTURE IRRIGATION DESIGN LANDSCAPE ARCHITECTURE 1925 GRAND AVE. SUITE 105 P.O. BOX 22943 BILLINGS, MT 59104 406/252-5545 FAX 245-9855 THUESEN STEINER KEY MAP: NATHAN STEINER 143 G CNLADS APE ARCHITECTOMNTANA R EG ISTERED L1.3 L1.3 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH KEY NOTES: 1 BIKE RACKS, SEE 2/L2.2. 4' H PLANTED SCREEN AT PARKING.2 1 22 2 RACKS AND SIDEWALK. WEED BARRIER AND BARK MULCH IN PLACE OF FUTURE BIKE CONCRETE WALKWAY & BIKE RACKS NIC - FUTURE PHASE. INSTALL 3 3