HomeMy WebLinkAbout015_L1.3_PLANTING_PLAN474447454746474
3
4744
4745
4746
4747
47484749SYNTHETIC TURF FIELD
PROJECT LIMITS
FUTURE DOG PARK
4GL
1NHL
1SAL
1NHE
1NHE
1NHE
1MLL
1MLL
1MLL
1MLL
1QUA 1QUA
1QUA
1SAL 1SAL
1SAL1SAL
3FG 8GL
9GF
4GL 3FG
2HM 2GL
7KF
2BU 2BU
4GL
6HM
2DR
1DY
2SS
2DY
3DR
OAK STREET
1NHL1NHL
1RDL
1RDL
1RDL
1RDL 1RDL
1SAL
1SAL
1SAL
1SAL
1MLL
1RDL
7GF
4BO
4BO
9HM
5SN
13GL
8GF
6BO
9BU
14HM
11KF 11FG
6KF
9GL
11BO
12GL
7SN
2HM
2GL
1SAL
17KF
MATCH LINEMATCH LINE1NHL
1NHL MATCH LINEMATCH LINEMATCH LINE
VIS
ION
TR
IANGLEVISION
T
RI
ANGL
E
1SAL
VISION TRIANGLE
ARCHITECT.
CONSENT OF THE LANDSCAPE
OR OWNER WITHOUT WRITTEN
OTHER PURPOSE, LOCATION,
IS NOT TO BE USED FOR ANY
SPECIFICALLY FOR THIS SITE AND
IT HAS BEEN PREPARED
OF THE LANDSCAPE ARCHITECT.
THIS DRAWING IS THE PROPERTY
STEINER THUESEN PLLC
2025
COPYRIGHT
SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE:
REV:
REV:
DATE:
CHECKED BY:
DATE:
DRAWN BY:GSG
6/27/25
NGS
6/27/25
-
-
P L L C
GOLF COURSE ARCHITECTURE
IRRIGATION DESIGN
LANDSCAPE ARCHITECTURE
1925 GRAND AVE. SUITE 105
P.O. BOX 22943
BILLINGS, MT 59104
406/252-5545 FAX 245-9855
THUESEN
STEINER
KEY MAP:
NATHAN
STEINER
143
G
CNLADS
APE ARCHITECTOMNTANA
R
EG
ISTERED
L1.3
L1.3 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH
KEY NOTES:
1 BIKE RACKS, SEE 2/L2.2.
4' H PLANTED SCREEN AT PARKING.2
1
22
2
RACKS AND SIDEWALK.
WEED BARRIER AND BARK MULCH IN PLACE OF FUTURE BIKE
CONCRETE WALKWAY & BIKE RACKS NIC - FUTURE PHASE. INSTALL
3
3