Loading...
HomeMy WebLinkAbout014_L1.2_PLANTING_PLANS D D D 47434743474447444743 4744 4745 MATCH LINE MATCH LINE FUTURE SYNTHETIC TURF FIELD OAK STREETCOTTONWOOD ROAD10GM 10OG 10GL 11NB 9GL 15NB 10CS 8GL 13NB 11GM 10OG 13GL 1NHL 1NHL 1NHL 1NHL 1CHB 1FRM 1FRM 1SAL 1SAL 1FRM 1FRM 1SAL MATCH LINEMATCH LINEVISIO N TRIA NGLE 1SAL ARCHITECT. CONSENT OF THE LANDSCAPE OR OWNER WITHOUT WRITTEN OTHER PURPOSE, LOCATION, IS NOT TO BE USED FOR ANY SPECIFICALLY FOR THIS SITE AND IT HAS BEEN PREPARED OF THE LANDSCAPE ARCHITECT. THIS DRAWING IS THE PROPERTY STEINER THUESEN PLLC 2025 COPYRIGHT SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE: REV: REV: DATE: CHECKED BY: DATE: DRAWN BY:GSG 6/27/25 NGS 6/27/25 - - P L L C GOLF COURSE ARCHITECTURE IRRIGATION DESIGN LANDSCAPE ARCHITECTURE 1925 GRAND AVE. SUITE 105 P.O. BOX 22943 BILLINGS, MT 59104 406/252-5545 FAX 245-9855 THUESEN STEINER KEY MAP: NATHAN STEINER 143 G CNLADS APE ARCHITECTOMNTANA R EG ISTERED L1.2 L1.2 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH KEY NOTES: 1 - NIC - FUTURE PHASE