HomeMy WebLinkAbout014_L1.2_PLANTING_PLANS
D
D D 47434743474447444743
4744
4745
MATCH LINE
MATCH LINE
FUTURE SYNTHETIC TURF FIELD
OAK STREETCOTTONWOOD ROAD10GM
10OG
10GL
11NB
9GL
15NB
10CS
8GL
13NB
11GM
10OG
13GL
1NHL
1NHL
1NHL
1NHL
1CHB
1FRM
1FRM
1SAL
1SAL
1FRM
1FRM
1SAL
MATCH LINEMATCH LINEVISIO
N TRIA
NGLE
1SAL
ARCHITECT.
CONSENT OF THE LANDSCAPE
OR OWNER WITHOUT WRITTEN
OTHER PURPOSE, LOCATION,
IS NOT TO BE USED FOR ANY
SPECIFICALLY FOR THIS SITE AND
IT HAS BEEN PREPARED
OF THE LANDSCAPE ARCHITECT.
THIS DRAWING IS THE PROPERTY
STEINER THUESEN PLLC
2025
COPYRIGHT
SHEET CITY OF BOZEMANBOZEMAN SPORTS PARK PHASE 2FILE:
REV:
REV:
DATE:
CHECKED BY:
DATE:
DRAWN BY:GSG
6/27/25
NGS
6/27/25
-
-
P L L C
GOLF COURSE ARCHITECTURE
IRRIGATION DESIGN
LANDSCAPE ARCHITECTURE
1925 GRAND AVE. SUITE 105
P.O. BOX 22943
BILLINGS, MT 59104
406/252-5545 FAX 245-9855
THUESEN
STEINER
KEY MAP:
NATHAN
STEINER
143
G
CNLADS
APE ARCHITECTOMNTANA
R
EG
ISTERED
L1.2
L1.2 PLANTING PLAN.DGNPLANTING PLAN0 10'20'40'NORTH
KEY NOTES:
1 -
NIC - FUTURE PHASE