Loading...
HomeMy WebLinkAboutST1 - Valley Glass Stormwater Design Report 723-00 Valley Glass and Windows - Stormwater Design Report Page 1 February 2025 TABLE OF CONTENTS Overview ......................................................................................................................................... 2 Existing Conditions ........................................................................................................................... 2 Stormwater Design Criteria ............................................................................................................. 3 Proposed Stormwater Improvements ............................................................................................. 3 APPENDIX Appendix A ...................................................................................................... Drainage Basin Maps Appendix B ............................................................................................. Drainage Basin Calculations Appendix C ................................................................................................ Groundwater Monitoring Appendix D .................................................... Stormwater Facilities Operation & Maintenance Plan 723-00 Valley Glass and Windows - Stormwater Design Report Page 2 February 2025 OVERVIEW The purpose of this report is to detail the stormwater management design for proposed site improvements for Valley Glass and Windows, located on Lot 3 of Tract 6 Plus Vacated Single Tree Court, Gardner Simmental Plaza Subdivision. The lot is located in Section 35, Township 01 South, Range 5 East, City of Bozeman, Gallatin County, Montana. The property is located on the southwest corner of Rawhide Ridge Road and Simmental Way. The property currently has an approximately 12,000 square foot warehouse and office building, along with an associated parking lot located to the north and south of the building. The proposed development on the property includes an 11,800 square foot warehouse building on the western side of the lot. The existing parking lot will also be expanded along the front of the proposed building, as well as east of the existing building. The street frontages along Simmental Way and Rawhide Ridge Road will be improved to City standards with pavement widening and curb and gutter. Stormwater runoff from the site and street improvements will be managed with on-site systems. EXISTING CONDITIONS Overall, the existing site grades from south to north at 1-1.5%. The existing parking lot on the north side of the existing building slopes at approximately 2% to existing stormwater ponds located north of the parking lot. The parking lot along the south side of the building grades to the southeast to an existing pond located in a landscaped are near the property line and to the west toward the undeveloped portion of the lot. The eastern portion of the property is currently a large landscaped area that generally grades to the north. The western portion of the lot is currently a gravel parking and materials lay-down area. A concrete truck ramp in the northwest corner of the existing building drains to an existing drywell in the ramp. The existing site improvements were permitted and approved through the City of Bozeman site plan process in the 1990’s. Appendix A includes a pre-development drainage basin map that details the existing drainage patterns on the property. The adjacent right-of-ways of Rawhide Ridge Road and Simmental Way are currently uncurbed and more closely resemble a county road section with roadside swales than a city street section. Runoff from the paved streets and much of the project site currently drains to these roadside swales for infiltration. The roadside swales along the property frontage ultimately flow west along the south side of Rawhide Ridge Road. The runoff generated by the existing site was estimated using the modified rational method outlined in the COB DSSP with the 10-year 2-hour design storm. The property and associated right-of-way were assigned runoff coefficients based on the cover type. The existing site was broken into 4 pre-development drainage basins based on current site conditions. Three of these drainage basins convey runoff to existing stormwater facilities on site while the rest of the site (Drainage Basin 1) drains to the previously discussed roadside swale on Rawhide Ridge Road. The pre-development off-site runoff flow rate in Drainage Basin 1 during the 25-yr design storm for conveyance facilities was estimated to be 1.79 cfs, while the runoff volume during the 10-yr, 2-hr design storm was estimated to be 3,616 cf. Groundwater monitoring of the existing site was performed during the spring of 2024 by IMEG Corp. Two perforated PVC pipes were installed as monitoring wells, one on the northwest side and one on the 723-00 Valley Glass and Windows - Stormwater Design Report Page 3 February 2025 northeast side of the property. The wells were monitored approximately during seasonal high groundwater (April – June). High groundwater was found at 3.55’ below ground surface (bgs) on the western well and at 6.00’ bgs on the eastern well. These peak groundwater elevations were used to create an estimated seasonal high groundwater surface across the site for use in designing the proposed stormwater systems. It was estimated that seasonal high groundwater generally follows the slope of the site from north to south at ~1.5%. STORMWATER DESIGN CRITERIA The proposed stormwater improvements for the Valley Glass and Windows Site Plan are designed to meet the City of Bozeman Design Standards and Specifications Policy (2004 – w/ addendums approved through 03/13/20). The design storm return interval for retention and detention facilities in the City of Bozeman is 10-years. The storm duration for these design events is 2-hours. Conveyance facilities are required to have sufficient capacity to convey a 25-year storm event. Time of Concentration for the design storms were calculated using the Manning Equation for channelized flow and the equation for sheet flow from Section II.E.6. of the COB DSSP. The Montana Post-Construction Storm Water BMP Design Guidance Manual recommends 3 feet of separation between seasonal high groundwater levels and stormwater retention/detention facilities. Given the high levels of groundwater on the property and the fact that much of this stormwater design includes retrofitting existing site improvements to meet current stormwater standards, following this recommendation is not feasible. However, the stormwater facilities have been designed to above the seasonal high groundwater table. Multiple drainage basins on site will sheet flow runoff to their respective drainage systems without entering conveyance facilities such as curbs, pipes, or chases. For these drainage basins with no conveyance facilities, no conveyance capacity calculations for the 25-year storm event have been provided. Instead, runoff volume calculations for the 10-year design storm have been calculated. It should also be noted that the City of Bozeman DSSP requires retention of runoff from the first 0.5” of rainfall from impervious areas. However, since all proposed storage systems on site are retention facilities, not detention, all runoff from the design storm event will be retained. Therefore, since the design storm requires retention of .82” of water, retention calculations for the first 0.5” of rainfall are not necessary. PROPOSED STORMWATER IMPROVEMENTS With the proposed site improvements, the city Engineering Department is requiring that the entire property be brought into compliance with city stormwater standards. Therefore, wherever possible, runoff generated by the existing and proposed improvements on the lot will be retained on-site using a combination of retention ponds and underground infiltration systems. Runoff will be conveyed to these systems via downspouts, curb and gutter, and curb chases. Since the proposed site improvements will result in limited landscaped area for surface storage, ADS Stormtech underground retention systems were chosen for the majority of the proposed systems for ease of construction and maintenance. The systems are detailed within the site plan set. Since the existing site improvements and stormwater facilities were permitted by the city with the original site design for the property, in an effort to minimize disturbance to the existing site, several existing storm facilities that are not being impacted by the proposed site improvements will remain in their existing location or condition. 723-00 Valley Glass and Windows - Stormwater Design Report Page 4 February 2025 One example of this is the existing dry well in the existing loading dock. We do not have record drawings or an accurate means of determining the capacity of the existing dry well. However, since the existing loading dock was permitted through the city and no improvements are proposed to the loading dock, the existing dry well will remain in use. This dry well only receives runoff from the limited area of the loading dock, and since it is below the surrounding parking lot grades and building finish floor elevations, even if it were to fail it would not present a flooding hazard to any surrounding facilities. Similarly, the existing retention pond (Pond C) on the south side of the existing building drains a portion of the existing parking lot and building roof and was permitted with the original site improvements. This portion of the existing parking lot is not proposed to be altered with the site improvements. Therefore, even though the existing pond is surrounded by existing underground utilities and does not meet current city utility setbacks, the pond is proposed to remain in use. The pond will be re-graded to meet city requirements for water storage depth and side slopes, but will largely remain in its current location. RIGHT-OF-WAY RUNOFF As mentioned previously, the city is requiring that the adjacent street frontages be improved with curb and gutter with the proposed site improvements. The city concept review comments require runoff from these adjacent improvements to be captured and treated on site. However, the property to the south of the project site recently improved their frontage of Simmental Way with curb and gutter as well, but did not provide any stormwater retention for their street frontage on their property. Since runoff from this southern property flows into the proposed Simmental gutter for this project, runoff from that property will now need to be captured on the project site. Therefore, city staff indicated that this project will only need to capture and treat runoff from a section of right of way that is similar to the length of the project frontage on Simmental and Rawhide Ridge, but not necessarily the actual property’s frontage right-of-way. In order to address this, the proposed stormwater improvements capture runoff from the Simmental right-of-way for the frontage of the property to the south of the project site and the project site’s frontage as well as the eastern portion of the project’s Rawhide Ridge frontage. The western portion of the Rawhide Ridge frontage will flow west and discharge into the roadside ditch west of the project site. Pre-development runoff calculations have been provided in Appendix B and on the Drainage Basin Maps in Appendix A to show that the post-development discharge into the Rawhide Ridge roadside ditch is significantly lower than the pre-development discharge at this location. DRAINAGE BASIN SUMMARIES The site was broken in to 12 drainage basins with some sub basins for conveyance analysis. Calculations for the drainage basins and facilities are included in Appendix B. Drainage Basin #1 is located northwest of the existing building and northeast of the proposed building. This basin receives runoff from the parking lot between the two buildings and drains via a valley gutter to Stormtech System A, which is a SC160 LP model stormtech system. Drainage Basin #2 includes the western roof of the existing building and the southwestern portion of the parking lot. Runoff from this area is conveyed via sheet flow to a short valley gutter in the parking lot which drains into Stormtech System B. this system is a SC160 LP model stormtech system. 723-00 Valley Glass and Windows - Stormwater Design Report Page 5 February 2025 Drainage Basin #3 is an existing drainage basin that includes the central portion of the existing building’s roof as well as the south-central portion of the parking lot. This area drains to an existing retention pond on the south side of the parking lot (Pond C) that will be regraded to a 1’ water storage depth and 4:1 side slopes. Drainage Basin #4 includes the eastern portion of the existing buildings roof and the new eastern parking lot. This area will sheet flow to a valley gutter that drains to Stormtech System C, which is a SC310 model stormtech system. Drainage Basin #5 includes the northern portion of the existing parking lot. This area currently drains to two ponds in the landscaped area along Rawhide Ridge Road. However, these existing ponds are located in the area that will be dedicated at a 10’ public utility easement, so the ponds will need to be shifted south. In order to meet the design storage volume and fit the ponds within the remaining landscaped area outside the utility easement, dry wells with perforated pipe will be installed beneath the new pond to increase storage volume. Drainage Basin #6 includes the western portion of the Rawhide Ridge Road right-of-way that will discharge off site to the west. Runoff from this area will be conveyed to a new curb along the south side of the street section that will convey runoff to the roadside ditch to the west. Runoff generated by this Drainage Basin in the post-development condition will be 713 cf, which is 2,903 cf less than the 3,616 cf of runoff that is estimated to be discharged to this location in the current, pre-development site condition. Drainage Basin #7 includes the western half of the Simmental Way right-of-way from Boot Hill Court to the intersection of Rawhide Ridge Road. Runoff from this area will be conveyed via new curb and gutter to a storm chase just south of the intersection with Rawhide Ridge Road which discharges into a new retention pond (Pond A). Since this storm chase is on-grade instead of at a low point there is a chance that sedimentation or snow/ice may lead to runoff bypassing the chase. Therefore, a second chase is proposed downgradient of this chase on Rawhide Ridge Road to ensure that runoff does not bypass this system and flow off-site to Drainage Basin 6. Drainage Basin #8 includes the northern portion of the proposed building’s roof as well as the proposed loading dock and adjacent landscaped area. The roof (DB #8A) will drain via roof downspouts to an 8” storm line along the west side of the building and on to Stormtech System D (SC160 LP Model). The loading dock (DB #8B) will drain to a catch basin at the low end of the dock and on to this same stormtech system. The western manhole of the stormtech sytem will have a slotted grate to capture runoff from the landscaped area adjacent to the dock (DB #8C). Drainage Basin #9 includes the southern portion of the proposed building’s roof. Similar to DB #8A, roof runoff will drain via roof downspouts to an 8” storm line that conveys runoff to Stormtech System E (SC310 model) located on the south side of the existing building. This Stormtech system will only receive runoff from the roof in DB #9. Drainage Basin #10 includes a 20’ wide rock storage pad on the south side of the proposed building and an adjacent landscape strip along the property line. Since Stormtech System E is located under this rock pad, there is not room to install an additional drainage feature in this drainage basin. Runoff from this area will not be directed to Stormtech System E because sediment from the rock pad may inundate the stormtech system over time. Instead, the rock pad and adjacent landscaped area is graded to a low point 723-00 Valley Glass and Windows - Stormwater Design Report Page 6 February 2025 on the south side of the pad so any runoff in this drainage basin will pond here. The storage volume of the low point has been calculated to be 413 cf, which is 3x larger than the runoff volume of 123 cf that would be generated by the 10-yr design storm. Drainage Basin #11 includes the existing loading dock. As discussed previously, this loading dock drains to an existing dry well that has an unknown storage volume. However, this loading dock and dry well were permitted through the City of Bozeman site plan process with the original site improvements, so the dry well is proposed to remain in its current condition. This loading dock does not receive runoff from any other portions of the site, so although the storage capacity of the dry well is unknown, it is not expected to receive enough runoff to cause flooding or safety issues. Drainage Basin #12 includes the 5’ wide landscaped area along the western property line that will sheet flow off-site to the west. This area is estimated to generate a negligible 12 cf of runoff during the 10-year storm event. When combined with the 713 cf of runoff from DB#6, the total off-site runoff from the project site will be 725 cf to the west, which is 2,891 cf less than the pre-development runoff volume of 3,616 that is currently estimated to discharge to this area. Pre-Development Runoff Summary (10-yr 2-hr storm) Drainage Basin Area (Ac.) Composite C- Value Q (10-yr) Facility 1 2.23 0.55 1.46 Off Site 2 0.33 0.79 0.11 Existing Ponds 3 0.20 0.76 0.06 Existing Pond 4 0.04 0.95 0.02 Existing Dry Well Post-Development Runoff Summary (10-yr 2-hr storm) Drainage Basin Area (Ac.) Composite C- Value Q (10-yr) Vreq (ft3)Vpro (ft3) Facility 1 0.20 0.90 0.07 526 605 Stormtech System A 2 0.42 0.90 0.16 1,123 1,180 Stormtech System B 3 0.18 0.81 0.06 421 432 Pond C 4 0.49 0.73 0.15 1,066 1,200 Stormtech System C 5 0.34 0.79 0.11 795 804 Pond B & Dry Wells 6 0.30 0.82 0.10 713 N/A Off Site 7 0.73 0.59 0.17 1260 1404 Pond A 8 0.22 0.77 0.07 502 514 Stormtech System D 9 0.18 0.95 0.07 515 540 Stormtech System E 10 0.06 0.66 0.02 123 415 Swale A 11 0.04 0.95 0.02 110 Unknown Existing Dry Well 12 0.02 0.20 0.00 12 N/A Off Site Pre vs Post Development Runoff Condition Runoff Volume (10-yr) (ft3) Runoff Flow Rate (25-yr) (cfs) Pre-Development 3,616 1.79 Post-Development 725 0.88 777 440 110 Runoff Volume (V) (ft3) 3,616 Appendix A Drainage Basin Maps CO EXISTINGDB #4SIMMENTAL WAYRAWHIDE RIDGE ROAD EXISTING DB #2 EXISTING DB #1 EXISTING DB #1 EXISTING DB #3 EXISTING BUILDING RETENTION SWALE #5 REQ. VOL.:132 CF PRO. VOL.:390 CF EXISTING RETENTION POND ESTIMATED VOL.:714 CF EXISTING RETENTION PONDS ESTIMATED VOL.:489 CF EXISTING LOADING DOCK DRY WELL VOLUME UNKNOWN DISCHARGE PONT FOR PRE-DEVELOPMENT OFF-SITE RUNOFF FACILITY: RAWHIDE RIDGE ROADSIDE DITCH ESTIMATED RUNOFF VOLUME: 3,107 CF EXISTING DB #1 TIME OF CONCENTRATION PATH EXISTING PARKING LOT EXISTING PARKING LOT EXISTING LAWN EXISTING GRAVEL STORAGE AREA PROJECT NO: DATE: ENGINEER: REVISIONS DATENO.DESC. 723-01 February 13, 2025 AK DB 1 20'0 40' SCALE 1" = 20' N LEGEND DRAINAGE BASIN BOUNDARY DRAINAGE BASIN COVER TYPE - ROOF STORM CATCH BASIN STORM POND / SWALE SYMBOL DESCRIPTION DRAINAGE BASIN COVER TYPE - IMPERVIOUS SHEET OF 21VALLEY GLASS AND WINDOWDRAINAGE BASIN MAP - PRE-DEVELOPMENTBOZEMAN, MONTANATIME OF CONCENTRATION PATH DRAINAGE DIRECTION DRAINAGE BASIN COVER TYPE - PERVIOUS DRAINAGE BASIN COVER TYPE - GRAVEL CO NO PARKINGNO PARKINGCO NO PARKINGNO PARKINGSTSTSTST STSTSTSTGASST15''ST 15''STSTST ST ST ST ST ST CO SEE INSET ABOVE FOR DRAINAGEBASIN #7 OVER VIEWSIMMENTAL WAYRAWHIDE RIDGE ROAD W W DB #12 DRAIN BASIN E ST MANHOLE E INLINE DRAIN E INLINE DRAIN D ST MANHOLE C ST MANHOLE B DRAIN BASIN D-1 DRAIN BASIN D-4 ST INLET A ST MANHOLE 1-2 ST MANHOLE 1-3ST MANHOLE 1-1DRAIN BASIN D-2 DRAIN BASIN D-3 ST MANHOLE D DB #1 DB #3 DB #4 DB #2 DB #9 DB #10 DB #11 DB #5 DB #8 DB #8B DB #8C DB #8A GROUNDWATER MONITORING WELL #2 GROUNDWATER MONITORING WELL #1 RETENTION SWALE REQ. VOL.:123 CF PRO. VOL.:415 CF CURB CHASE #2 POND B & DRY WELLS REQ. VOLUME: 795 CF PRO. VOLUME: 804 CF BOTTOM OF SYSTEM STONE ELEV: 4704.67 EST. SHGW ELEV: 4704.60 STORMTECH - SYSTEM A SC160 LP CHAMBERS REQ. VOLUME: 526 CF PRO. VOLUME: 605 CF BOTTOM OF SYSTEM STONE ELEV: 4705.00 EST. SHGW ELEV: 4704.90 STORMTECH - SYSTEM D SC160 LP CHAMBERS REQ. VOLUME: 502 CF PRO. VOLUME: 514 CF BOTTOM OF SYSTEM STONE ELEV: 4704.50 EST. SHGW ELEV: 4704.50 STORMTECH - SYSTEM E SC310 CHAMBERS REQ. VOLUME: 515 CF PRO. VOLUME: 540 CF BOTTOM OF SYSTEM STONE ELEV: 4706.50 EST. SHGW ELEV: 4706.50 STORMTECH - SYSTEM B SC160 LP CHAMBERS REQ. VOLUME: 1123 CF PRO. VOLUME: 1180 CF BOTTOM OF SYSTEM STONE ELEV: 4706.30 EST. SHGW ELEV: 4706.15 STORMTECH - SYSTEM C SC310 CHAMBERS REQ. VOLUME: 1066 CF PRO. VOLUME: 1200 CF BOTTOM OF SYSTEM STONE ELEV: 4706.25 EST. SHGW ELEV: 4706.15 POND A 1.5' WATER STORAGE DEPTH 4:1 SIDE SLOPES REQ. VOLUME: 1260 CF PRO. VOLUME: 1404 CF BOTTOM OF POND ELEV: 4708.30 EST. SHGW ELEV: 4704.80 POND C 1' WATER STORAGE DEPTH 4:1 SIDE SLOPES REQ. VOLUME: 421 CF PRO. VOLUME: 432 CF BOTTOM OF POND ELEV: 4710.00 EST. SHGW ELEV: 4706.60 OFFSITE DISCHARGE (DB #6 & DB #12) PRE-DEV RUNOFF VOL (10-YR STORM): 3,107 CF POST-DEV RUNOFF VOL (10-YR STORM): 725 CF PRE-DEV RUNOFF RATE (25-YR STORM): 1.79 CFS POST-DEV RUNOFF RATE (25-YR STORM): 0.88 CFS -1.2%DB #7A DB #7B DB #7C CURB CHASE #1 DB #7 -0.8% PIPE D-1 PIPE D PIPE D-3 DB #6 4712 4711 471247114711471147114711 4710 4709 4712 4709 4710 4711 4711 4712 47 1 3 4714 47144713471 2 47114710 4711 47124710 4710 471147104709 471047104710470947084708 4708 4709 4710 47114711 4710471147114710 PIPE E WSIMMENTAL WAYBOOT HILL COURTST MANHOLE C DB #4 DB #7A DB #7B DB #7C DB #7 CURB CHASE #1 SIMMENTAL WAY ℄ PROJECT NO: DATE: ENGINEER: REVISIONS DATENO.DESC. 723-01 February 13, 2025 AK DB 2 20'0 40' SCALE 1" = 20' N LEGEND DRAINAGE BASIN BOUNDARY DRAINAGE BASIN COVER TYPE - PERVIOUS STORM MANHOLE STORM INLET STORM CATCH BASIN STORM POND / SWALE SYMBOL DESCRIPTION ST DRAINAGE BASIN COVER TYPE - IMPERVIOUS DRAINAGE BASIN COVER TYPE - ROOF SHEET OF 22VALLEY GLASS AND WINDOWDRAINAGE BASIN MAP - POST DEVELOPMENTBOZEMAN, MONTANATIME OF CONCENTRATION PATH DRAINAGE DIRECTION 0 40'80' SCALE 1" = 40'NEXISTING LOADING DOCK DRYWELL VOLUME UNKNOWN SUB DRAINAGE BASIN BOUNDARY DRAINAGE BASIN COVER TYPE - GRAVEL Appendix B Drainage Basin Calculations Existing Drainage Basin 1 Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 1 26,773 0.61 0.95 0.5839 DB - Pervious 1 50,460 1.16 0.20 0.2317 DB - Gravel 1 11,557 0.27 0.85 0.2255 DB - Roof 1 8,427 0.19 0.95 0.1838 Total 97,217 2.23 1.2249 Weighted C:0.55 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.59 C * Cf 0.59 0.65 0.74 D - Length of Basin (ft) 35 Sb - Slope of Basin (%)2.0000 To - Time of Conc. - Overland (min.)4.48 3.96 3.18 L - Length of Channel (ft) 655 n - Manning's Coefficient 0.15 R - Hydraulic Radius(ft) 0.50 Sc - Slope of Channel (ft/ft)0.009 V - Velocity (ft/sec) 0.59 0.59 0.59 Tc - Time of Conc. - Channel (min.)18.5 18.5 18.5 Time of Concentration (Ttotal)22.98 22.46 21.68 X - Storm Duration (hr) 0.38 0.37 0.36 I - Intensity (in/hr)1.19 1.46 2.00 Q - Peak Runoff (cfs) 1.46 1.79 2.45 Total Area (Acres) = 2.23 Weighted C = 0.55 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.50 Pre-Development Runoff Volume (ft3)=3,616 Rainfall Frequency (yr) Generated Runoff Volume - 10 year, 2 hour Storm Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A Q = Peak Runoff Rate (cfs)Facility Type: Ponds C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 2 10,653 0.24 0.95 0.232 DB - Roof 2 764 0.02 0.95 0.017 DB - Pervious 2 3,064 0.07 0.20 0.014 Totals 14,481 0.33 0.2631 Weighted C:0.79 Total Area (Acres) = 0.33 Weighted C = 0.79 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.11 Runoff Volume (ft3)=777 Generated Runoff Volume - 10 year, 2 hour Storm Storage Facility Calculations Existing DB # 2 Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A Q = Peak Runoff Rate (cfs)Facility Type: Pond C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 3 3,208 0.07 0.95 0.070 DB - Roof 3 3,183 0.07 0.95 0.069 DB - Pervious 3 2,126 0.05 0.20 0.010 Totals 8,518 0.20 0.1491 Weighted C:0.76 Total Area (Acres) = 0.20 Weighted C = 0.76 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.06 Runoff Volume (ft3)=440 Generated Runoff Volume - 10 year, 2 hour Storm Storage Facility Calculations Existing DB # 3 Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Dry Well C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 4 1,713 0.04 0.95 0.037 DB - Roof 4 0 0.00 0.95 0.000 DB - Pervious 4 0 0.00 0.20 0.000 Totals 1,713 0.04 0.0374 Weighted C:0.95 Total Area (Acres) = 0.04 Weighted C = 0.95 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.02 Runoff Volume (ft3)=110 Generated Runoff Volume - 10 year, 2 hour Storm Storage Facility Calculations Existing DB # 4 Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Basis for Calculations Time of Concentration (Ttotal) (minutes) Rainfall Intensity (I) (in/hr) Ttotal = To + Tc Rainfall Frequency Equation To = Time of Concentration for Overland Flow 10 year I = 0.64(X-.65) Tc = Time of Concentration for Channel Flow 25 year I = 0.78(X-.64) Whereas:100 year I = 1.01(X-.67) To = 1.87 (1.1-CCf)D1/2 Tc = L/V/60 Whereas: (Sb)1/3 X = Storm Duration (hr) C = Runoff Coefficient L = Length of Channel (ft) = Ttotal / 60 Cf = Frequency Adjustment Factor V = Mean Velocity (ft/sec) D = Length of Basin (ft)V = 1.486 Gutter Capacity Sb = Slope of Basin (%) n Q = (1.486/n)AR2/3 S1/2 n = Manning's Coefficient R = Hydraulic Radius (ft) Hydraulic Radius = Area (ft2) / Wetted Perimeter (ft)Integral Curb & Gutter 0.136 Sc = Slope of Channel (ft/ft) Rational Method Peak Runoff (Q) Q = CIA Pre-Development Runoff Summary (10-yr 2-hr storm) Drainage Basin Area (Ac.) Composite C- Value Q (10-yr) Facility 1 2.23 0.55 1.46 Off Site 2 0.33 0.79 0.11 Existing Ponds 3 0.20 0.76 0.06 Existing Pond 4 0.04 0.95 0.02 Existing Dry Well Post-Development Runoff Summary (10-yr 2-hr storm) Drainage Basin Area (Ac.) Composite C- Value Q (10-yr)Vreq (ft3)Vpro (ft3)Facility 1 0.20 0.90 0.07 526 605 Stormtech System A 2 0.42 0.90 0.16 1,123 1,180 Stormtech System B 3 0.18 0.81 0.06 421 432 Pond C 4 0.49 0.73 0.15 1,066 1,200 Stormtech System C 5 0.34 0.79 0.11 795 804 Pond B & Dry Wells 6 0.30 0.82 0.10 713 N/A Off Site 7 0.73 0.59 0.17 1260 1404 Pond A 8 0.22 0.77 0.07 502 514 Stormtech System D 9 0.18 0.95 0.07 515 540 Stormtech System E 10 0.06 0.66 0.02 123 415 Swale A 11 0.04 0.95 0.02 110 Unknown Existing Dry Well 12 0.02 0.20 0.00 12 N/A Off Site Pre vs Post Development Runoff Condition Runoff Volume (10-yr) (ft3) Runoff Flow Rate (25-yr) (cfs) Pre-Development 3,616 1.79 Post-Development 725 0.88 777 440 110 R2/3(Sc)1/2 Drainage Basin Time of Concentration and Peak Runoff Calculations Runoff Volume (V) (ft3) 3,616 Drainage Basin 1 Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 1 8061 0.19 0.95 0.1758 DB - Pervious 1 528 0.01 0.20 0.0024 DB - Roof 1 0 0.00 0.95 0.0000 Total 8589 0.20 0.1782 Weighted C:0.90 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.95 C * Cf 0.95 1.05 1.19 D - Length of Basin (ft) 67 Sb - Slope of Basin (%)1.0000 To - Time of Conc. - Overland (min.)2.3 0.84 -1.34 L - Length of Channel (ft) 47 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft)0.02 V - Velocity (ft/sec) 4.28 4.28 4.28 Tc - Time of Conc. - Channel (min.)0.18 0.18 0.18 Time of Concentration (Ttotal)555 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr) 3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.57 0.68 0.95 Gutter Capacity (0.15' Freeboard) n - Manning's Coefficient 0.013 A - Area (ft2)1.25 R - Hydraulic Radius(ft)0.136 Sc - Slope of Channel (ft/ft)0.02 Gutter Capacity (cfs) 5.34 Rainfall Frequency (yr) Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Stormtech C = Runoff Coefficient Facility Make/Model: SC-160LP I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 1 8,061 0.19 0.95 0.176 DB - Roof 1 0 0.00 0.95 0.000 DB - Pervious 1 528 0.01 0.20 0.002 Totals 8,589 0.20 0.1782 Weighted C:0.90 Total Area (Acres) = 0.20 Weighted C = 0.90 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.07 Req. Runoff Volume (ft3)=526 Total Ret Volume (ft3)605 Provided Retention (STORMTECH) Storage Facility Calculations STORMTECH SYSTEM A Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Stormtech C = Runoff Coefficient Facility Make/Model: SC-160LP I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 2 10,581 0.24 0.95 0.231 DB - Roof 2 6,606 0.15 0.95 0.144 DB - Pervious 2 1,235 0.03 0.20 0.006 Totals 18,422 0.42 0.3805 Weighted C:0.90 Total Area (Acres) = 0.42 Weighted C = 0.90 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.16 Req. Runoff Volume (ft3)=1,123 Total Ret Volume (ft3)1180 Provided Retention (STORMTECH) Storage Facility Calculations STORMTECH SYSTEM B Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Pond C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 3 3,041 0.07 0.95 0.066 DB - Roof 3 3,187 0.07 0.95 0.070 DB - Pervious 3 1,457 0.03 0.20 0.007 Totals 7,685 0.18 0.1425 Weighted C:0.81 Total Area (Acres) = 0.18 Weighted C = 0.81 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.06 Req. Runoff Volume (ft3)=421 Total Ret Volume (ft3)432 Provided Retention (Pond) Storage Facility Calculations POND C Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Stormtech C = Runoff Coefficient Facility Make/Model: SC-310 I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 4 13,447 0.31 0.95 0.293 DB - Roof 4 1,818 0.04 0.95 0.040 DB - Pervious 4 6,162 0.14 0.20 0.028 Totals 21,427 0.49 0.3612 Weighted C:0.73 Total Area (Acres) = 0.49 Weighted C = 0.73 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.15 Req. Runoff Volume (ft3)=1,066 Total Ret Volume (ft3)1200 Provided Retention (STORMTECH) Storage Facility Calculations STORMTECH SYSTEM C Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Design Rainfall Frequency (year):10 Storage Method: Retention Rational Method Peak Runoff Equation:Q = CIA Discharge Method: N/A Q = Peak Runoff Rate (cfs)Facility Type: Pond & Dry Wells C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr):0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 5 10,919 0.25 0.95 0.238 DB - Roof 5 765 0.02 0.95 0.017 DB - Pervious 5 3,189 0.07 0.20 0.015 Totals 14,873 0.34 0.2695 Weighted C:0.79 Total Area (Acres) = 0.34 Weighted C = 0.79 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.11 Req. Runoff Volume (ft3)=795 Drywell 1 - Inner Diameter (ft) 3 Depth (ft) 3 Volume of Drywel 1 (ft3)21.2 Drywell 2 - Inner Diameter (ft) 3 Depth (ft) 3 Volume of Drywell 2 (ft3)21.2 Drywell 3 - Inner Diameter (ft) 3 Depth (ft) 3 Volume of Drywell 3 (ft3)21.2 Lateral Pipe Diameter (inches) 15 Lateral Length (ft) 85 Volume of Lateral (ft3)104.3 Washed Rock Porosity 40% Lateral Washed Rock Width (inches) 72 Lateral Washed Rock Height (inches) 24 Volume of Washed Rock Around Lateral (ft3)366.3 Volume Pond (ft3)270.0 Total System Ret Volume (ft3)804.2 Provided Retention (Pond & Drywells w/ Perf Pipe) Storage Facility Calculations POND B & DRY WELLS Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Drainage Basin 6 Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 6 10602 0.24 0.95 0.2312 DB - Pervious 6 2271 0.05 0.20 0.0104 DB - Roof 6 0 0.00 0.95 0.0000 Total 12873 0.30 0.2416 Weighted C:0.82 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.5 C * Cf 0.5 0.55 0.63 D - Length of Basin (ft) 16 Sb - Slope of Basin (%)2.00 To - Time of Conc. - Overland (min.)3.56 3.27 2.82 L - Length of Channel (ft) 376 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft)0.008 V - Velocity (ft/sec) 2.7 2.7 2.7 Tc - Time of Conc. - Channel (min.) 2.32 2.32 2.32 Time of Concentration (Ttotal)5.88 5.59 5.14 X - Storm Duration (hr) 0.10 0.09 0.09 I - Intensity (in/hr) 2.90 3.56 5.24 Q - Peak Runoff (cfs) 0.7 0.86 1.27 Gutter Capacity (0.15' Freeboard) n - Manning's Coefficient 0.013 A - Area (ft2)1.25 R - Hydraulic Radius(ft)0.136 Sc - Slope of Channel (ft/ft)0.008 Gutter Capacity (cfs) 3.38 Rainfall Frequency (yr) Design Rainfall Frequency (year): 10 Storage Method: N/A Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A Q = Peak Runoff Rate (cfs)Facility Type: N/A C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 6 10,602 0.24 0.95 0.231 DB - Roof 6 0 0.00 0.95 0.000 DB - Pervious 6 2,271 0.05 0.20 0.010 Totals 12,873 0.30 0.2416 Weighted C:0.82 Total Area (Acres) = 0.30 Weighted C = 0.82 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.10 Req. Runoff Volume (ft3)=713 Total Ret Volume (ft3)N/A Provided Retention Storage Facility Calculations Off Site Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Drainage Basin 7A Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 7A 13422 0.31 0.95 0.2927 DB - Pervious 7A 10973 0.25 0.20 0.0504 DB - Roof 7A 0 0.00 0.95 0.0000 Total 24394 0.56 0.3431 Weighted C:0.61 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.37 C * Cf 0.37 0.41 0.46 D - Length of Basin (ft) 31 Sb - Slope of Basin (%)2.00 To - Time of Conc. - Overland (min.)6.03 5.73 5.27 L - Length of Channel (ft) 610 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.012 V - Velocity (ft/sec) 3.31 3.31 3.31 Tc - Time of Conc. - Channel (min.)3.07 3.07 3.07 Time of Concentration (Ttotal)9.1 8.8 8.34 X - Storm Duration (hr) 0.15 0.15 0.14 I - Intensity (in/hr) 2.18 2.66 3.79 Q - Peak Runoff (cfs) 0.75 0.91 1.3 Gutter Capacity (0.15' Freeboard) n - Manning's Coefficient 0.013 A - Area (ft2)1.25 R - Hydraulic Radius(ft)0.136 Sc - Slope of Channel (ft/ft)0.012 Gutter Capacity (cfs) 4.14 Channel Chase Width (in) Flow Depth - d (in)Slope (ft/ft) Manning's n Provided Capacity (cfs) Required Capacity (cfs) 12" Curb Cut 12 6 0.015 0.012 3.01 0.91 Rainfall Frequency (yr) Curb Chase Capacity Drainage Basin 7B Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 7B 2718 0.06 0.95 0.0593 DB - Pervious 7B 793 0.02 0.20 0.0036 DB - Roof 7B 0 0.00 0.95 0.0000 Total 3511 0.08 0.0629 Weighted C:0.78 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.95 C * Cf 0.95 1.05 1.19 D - Length of Basin (ft) 25 Sb - Slope of Basin (%)3.00 To - Time of Conc. - Overland (min.)0.97 0.36 -0.57 L - Length of Channel (ft) 94 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.015 V - Velocity (ft/sec) 3.7 3.7 3.7 Tc - Time of Conc. - Channel (min.)0.42 0.42 0.42 Time of Concentration (Ttotal)555 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr) 3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.2 0.24 0.34 Gutter Capacity (0.15' Freeboard) n - Manning's Coefficient 0.013 A - Area (ft2)1.25 R - Hydraulic Radius(ft)0.136 Sc - Slope of Channel (ft/ft)0.015 Gutter Capacity (cfs) 4.63 Channel Chase Width (in) Flow Depth - d (in)Slope (ft/ft) Manning's n Provided Capacity (cfs) Required Capacity (cfs) 12" Curb Cut 12 6 0.010 0.012 2.46 0.24 Rainfall Frequency (yr) Curb Chase Capacity Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Pond C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 7A 13,422 0.31 0.95 0.293 DB - Roof 7A 0 0.00 0.95 0.000 DB - Pervious 7A 10,973 0.25 0.20 0.050 DB - Impervious 7B 2,718 0.06 0.95 0.059 DB - Roof 7B 0 0.00 0.95 0.000 DB - Pervious 7B 793 0.02 0.20 0.004 DB - Impervious 7C 189 0.00 0.95 0.004 DB - Roof 7C 0 0.00 0.95 0.000 DB - Pervious 7C 3,629 0.08 0.20 0.017 Totals 31,723 0.73 0.4268 Weighted C:0.59 Total Area (Acres) = 0.73 Weighted C = 0.59 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.17 Req. Runoff Volume (ft3)=1,260 Total Runoff Volume (ft3)1404 Pre-Development Runoff Volume Storage Facility Calculations POND A Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Drainage Basin 8A Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 8A 0 0.00 0.95 0.0000 DB - Pervious 8A 0 0.00 0.20 0.0000 DB - Roof 8A 3800 0.09 0.95 0.0829 Total 3800 0.09 0.0829 Weighted C:0.95 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.95 C * Cf 0.95 1.05 1.19 D - Length of Basin (ft) 80 Sb - Slope of Basin (%)5.00 To - Time of Conc. - Overland (min.)1.47 0.54 -0.86 L - Length of Channel (ft) 0 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.01 V - Velocity (ft/sec) 3.02 3.02 3.02 Tc - Time of Conc. - Channel (min.)00 0 Time of Concentration (Ttotal)55 5 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr)3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.27 0.32 0.44 Pipe Pipe Size (in) Flow Depth - d (in)Slope (ft/ft) Manning's n Provided Capacity (cfs) Required Capacity (cfs) PIPE D-1 8 6.00 0.008 0.012 1.07 0.32 Rainfall Frequency (yr) Pipe Capacity Drainage Basin 8B Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 8B 3522 0.08 0.95 0.0768 DB - Pervious 8B 0 0.00 0.20 0.0000 DB - Roof 8B 0 0.00 0.95 0.0000 Total 3522 0.08 0.0768 Weighted C:0.95 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.95 C * Cf 0.95 1.05 1.19 D - Length of Basin (ft) 85 Sb - Slope of Basin (%)2.50 To - Time of Conc. - Overland (min.)1.91 0.7 -1.11 L - Length of Channel (ft) 0 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.01 V - Velocity (ft/sec) 3.02 3.02 3.02 Tc - Time of Conc. - Channel (min.)00 0 Time of Concentration (Ttotal)55 5 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr)3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.25 0.29 0.41 Pipe Pipe Size (in) Flow Depth - d (in)Slope (ft/ft) Manning's n Provided Capacity (cfs) Required Capacity (cfs) Pipe D 6 4.50 0.008 0.012 0.50 0.29 Pipe Pipe Size (in) Flow Depth - d (in)Slope (ft/ft) Manning's n Provided Capacity (cfs) Required Capacity (cfs) Pipe D-2 8 6.00 0.0058 0.012 0.91 0.61 Rainfall Frequency (yr) Pipe Capacity Pipe Capacity Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Stormtech C = Runoff Coefficient Facility Make/Model: SC-160LP I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 8A 0 0.00 0.95 0.000 DB - Roof 8A 3,800 0.09 0.95 0.083 DB - Pervious 8A 0 0.00 0.20 0.000 DB - Impervious 8B 3,522 0.08 0.95 0.077 DB - Roof 8B 0 0.00 0.95 0.000 DB - Pervious 8B 0 0.00 0.20 0.000 DB - Impervious 8C 0 0.00 0.95 0.000 DB - Roof 8C 0 0.00 0.95 0.000 DB - Pervious 8C 2,292 0.05 0.20 0.011 Totals 9,614 0.22 0.1702 Weighted C:0.77 Total Area (Acres) = 0.22 Weighted C = 0.77 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.07 Req. Runoff Volume (ft3)=502 Total Ret Volume (ft3)514 Provided Retention (STORMTECH) Storage Facility Calculations STORMTECH SYSTEM D Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Drainage Basin 9 Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 9 0 0.00 0.95 0.0000 DB - Pervious 9 0 0.00 0.20 0.0000 DB - Roof 9 8000 0.18 0.95 0.1745 Total 8000 0.18 0.1745 Weighted C:0.95 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.95 C * Cf 0.95 1.05 1.19 D - Length of Basin (ft) 80 Sb - Slope of Basin (%)5.00 To - Time of Conc. - Overland (min.)1.47 0.54 -0.86 L - Length of Channel (ft) 0 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.01 V - Velocity (ft/sec) 3.02 3.02 3.02 Tc - Time of Conc. - Channel (min.)00 0 Time of Concentration (Ttotal)55 5 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr) 3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.56 0.67 0.93 Pipe Pipe Size (in) Flow Depth - d (in)Slope (ft/ft) Manning's n Provided Capacity (cfs) Required Capacity (cfs) PIPE E 8 6.00 0.005 0.012 0.84 0.67 Rainfall Frequency (yr) Pipe Capacity Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Stormtech C = Runoff Coefficient Facility Make/Model: SC 310 I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 9 0 0.00 0.95 0.000 DB - Roof 9 8,000 0.18 0.95 0.174 DB - Pervious 9 0 0.00 0.20 0.000 Totals 8,000 0.18 0.1745 Weighted C:0.95 Total Area (Acres) = 0.18 Weighted C = 0.95 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.07 Req. Runoff Volume (ft3)=515 Total Ret Volume (ft3)540 Provided Retention (Stormte) Storage Facility Calculations STORMTECH SYSTEM E Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Drainage Basin 10 Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 10 0 0.00 0.95 0.0000 DB - Pervious 10 802 0.02 0.20 0.0037 DB - Roof 10 0 0.00 0.95 0.0000 Total 802 0.02 0.0037 Weighted C:0.20 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.95 C * Cf 0.95 1.05 1.19 D - Length of Basin (ft) 81 Sb - Slope of Basin (%)1.0000 To - Time of Conc. - Overland (min.)2.52 0.93 -1.47 L - Length of Channel (ft) 0 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.0062 V - Velocity (ft/sec) 2.38 2.38 2.38 Tc - Time of Conc. - Channel (min.)000 Time of Concentration (Ttotal)555 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr) 3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.01 0.01 0.02 Rainfall Frequency (yr) Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A Q = Peak Runoff Rate (cfs)Facility Type: Swale C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 10 0 0.00 0.95 0.000 DB - Roof 10 0 0.00 0.95 0.000 DB - Pervious 10 802 0.02 0.20 0.004 DB - Gravel 10 1,947 0.04 0.85 0.038 Totals 2,749 0.06 0.0417 Weighted C:0.66 Total Area (Acres) = 0.06 Weighted C = 0.66 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.02 Req. Runoff Volume (ft3)=123 Total Ret Volume (ft3)415 Provided Retention (Swale) Storage Facility Calculations Swale A Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Design Rainfall Frequency (year): 10 Storage Method: Retention Rational Method Peak Runoff Equation: Q = CIA Discharge Method: Infiltration Q = Peak Runoff Rate (cfs)Facility Type: Dry Well C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 11 1,711 0.04 0.95 0.037 DB - Roof 11 0 0.00 0.95 0.000 DB - Pervious 11 0 0.00 0.20 0.000 Totals 1,711 0.04 0.0373 Weighted C:0.95 Total Area (Acres) = 0.04 Weighted C = 0.95 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.02 Req. Runoff Volume (ft3)=110 Total Ret Volume (ft3)Unknown Provided Retention (Existing Drywell) Storage Facility Calculations Existing Loading Dock Dry Well Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Drainage Basin 12 Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coefficient (C) A (Ac) x C DB - Impervious 12 0 0.00 0.95 0.0000 DB - Pervious 12 875 0.02 0.20 0.0040 DB - Roof 12 0 0.00 0.95 0.0000 Total 875 0.02 0.0040 Weighted C:0.20 10 25 100 Cf - Frequency Adjustment Factor 1 1.1 1.25 C - Runoff Coefficient (Overland Flow) 0.2 C * Cf 0.2 0.22 0.25 D - Length of Basin (ft) 5 Sb - Slope of Basin (%)25.0000 To - Time of Conc. - Overland (min.)1.29 1.26 1.22 L - Length of Channel (ft) 0 n - Manning's Coefficient 0.013 R - Hydraulic Radius(ft) 0.136 Sc - Slope of Channel (ft/ft) 0.0062 V - Velocity (ft/sec) 2.38 2.38 2.38 Tc - Time of Conc. - Channel (min.)000 Time of Concentration (Ttotal)555 X - Storm Duration (hr) 0.08 0.08 0.08 I - Intensity (in/hr) 3.22 3.83 5.34 Q - Peak Runoff (cfs) 0.01 0.02 0.02 Rainfall Frequency (yr) Design Rainfall Frequency (year): 10 Storage Method: N/A Rational Method Peak Runoff Equation: Q = CIA Discharge Method: N/A Q = Peak Runoff Rate (cfs)Facility Type: N/A C = Runoff Coefficient Facility Make/Model: N/A I = Rainfall Intensity (in/hr): 0.41 A = Drainage Basin (acres) Land Use Drainage Basin Number Contributing Area (sf) Contributing Area (Ac) Runoff Coe. (C)A (Ac) x C DB - Impervious 12 0 0.00 0.95 0.000 DB - Roof 12 0 0.00 0.95 0.000 DB - Pervious 12 875 0.02 0.20 0.004 DB - Gravel 12 0 0.00 0.85 0.000 Totals 875 0.02 0.0040 Weighted C:0.20 Total Area (Acres) = 0.02 Weighted C = 0.20 Duration (hrs) = 2.00 Intensity (in/hr) = 0.41 Q (cfs) = 0.00 Req. Runoff Volume (ft3)=12 Total Ret Volume (ft3)N/A Provided Retention Storage Facility Calculations Drainage Basin 12 - Off Site Basis For Calculations Storage Facility Information Contributing Area & Runoff Coefficient Tabulation Generated Runoff Volume - 10 year, 2 hour Storm Appendix C Groundwater Monitoring