Loading...
HomeMy WebLinkAboutAddendum 1_9-11-25• • Engineers and Land Surveyors ADD NO. 1 2 9-11-25 851 Bridger Drive, Suite 1, Bozeman, MT 59715 | phone: 406-522-8594 www.seaeng.com c. Item 302: Changed from “8” Landscaping Irrigation Sleeves” to “Landscaping Irrigation Sleeve. Units and Quantities have been updated to reflect this change. d. Item 303: Removed. e. Item 316: to be changed from “Thermoplastic Pavement Marking” to “Water- based Pavement Marking.” f. Item 401.2: Landscaping Irrigation Sleeves added. Plans 1. OSP Overall Site Plan issued with original bid documents is to be removed and replaced with new OSP Overall Site plan dated 9/10/2025. a. Fence gate locations provided. b. Hardscape to fence gate provided. 2. 4.3 Site Details issued with original bid documents to be removed and replaced with new 4.3 Site Details dated 9/10/2025. a. Gravel Path Section detail has been revised. Informational 1. Contact Information for the solar irrigation controller found on the Landscape Plans, Sheet I2.3, Detail 6, is listed below: Michael Smith Control Tech USA, Inc. 303-814-0307 Sales@controltechusa.com 2. The Double Vault Concrete Toilet from Missoula Concrete shall have a ‘barnwood siding’ finish with a ‘light brown’ stain and no privacy screen. 3. The cement-stabilization of the subgrade shown in the Artificial Turf Field Section detail on C4.3will be done by others Request For Clarification 1. Bid form ITEM 401 – Topsoil Stripping (15” Depth) is to involve the stripping under all hardscape and soccer fields. Respread quantities are less than the amount of topsoil to be stripped. The excess topsoil can be used in non-structural areas as a fill material (areas not under the hardscape or the fields). No additional Topsoil work is required in the Boulevards along Oak Street. 2. Bid Form ITEM 105 – Site Grading (cut/fill to subgrade) involves cutting to subgrade and using the cut material to fill to finish grade. Bid Form ITEM 106 Haul and Grade to Subgrade is for Hauling from an existing stockpile on site (approximately 300 ft away) • • Engineers and Land Surveyors ADD NO. 1 3 9-11-25 851 Bridger Drive, Suite 1, Bozeman, MT 59715 | phone: 406-522-8594 www.seaeng.com and placing to finish grade. The existing stockpile and cut quantities are adequate to grade to subgrade, no import material is required. 3. Bid Form ITEM 505,506, and 507 represent the section under the asphalt apron surrounding field 13. END OF ADDENDUM NO. 1