Loading...
HomeMy WebLinkAbout15 - CIVIL Bozeman Sports Park Phase 2 Bid PlansPLAN SHEET INDEXEXISTINGEXISTINGPROPOSEDPROPOSEDLEGENDABBREVIATIONSSITE STATISTICSPROJECT LOCATIONCONSTRUCTION DRAWINGSBOZEMAN SPORTS PARKPHASE 2BOZEMAN, MONTANASHERIDANDANIELSROOSEVELTVALLEYPHILLIPSBLAINEP E T R O L E U MFERGUS HILLLIBERTYTOOLEFLATHEADLINCOLNSANDERSLAKEMINERALMISSOULAPOWELLRAVALLIGRANITELEWISANDCLARKCASCADE JUDITHBASINDEERLODGESILVERBOWJEFFERS O N BROADWATER MEAGHERWHEATLANDGOLDEN VALLEY MUSSELSHELLBEAVERHEADMADISONGALLATINPARKTETONPONDERACHOUTEAUSWEETGRASSSTILLWATERYELLOWSTONECARBONBIG HORNGLACIERRICHLANDMcCONEDAWSONGARFIELDPRAIRIETREASUREROSEBUDCUSTERPOWDERRIVERCARTERFALLONWIBAUXHardinBroadusBillingsEkalakaBakerMiles CityForsythTerryWibauxGlendiveCircleJordanSidneyWinnettRoundupHyshamRed LodgeColumbusBig TimberLivingstonBozemanVirginia CityDillonTownsendBoulderButteAnacondaPhilipsburgHamilton MissoulaSuperiorThompsonFallsLibbyKalispellPolsonHelenaGreat FallsChoteauFort BentonLewistownStanfordHarlowtonRyegateDeer lodgeConradCut BankChesterHavreShelbyChinookMaltaGlasgowScobeyPlentywoodWolf pointWhite SulpherSpringsENGINEER OF RECORD:QUALITY CONTROL REVIEWER:,PEPROJECT VICINITYT1.0TITLE SHEET1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594,PE W OAK STREETCOTTONWOOD ROADFUTURE PHASE CPHASE 2PROPOSED PROJECT2025FUTURE PHASE BPHASE 1B-2FUTURE PROJECTPHASE 1BPLANNED PROJECT2025 BY OTHERSFUTURE PHASE AEXISTINGEXISTINGEXISTINGEXISTINGFUTURE PHASE DOSPOVERALL SITEPLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 PRODUCTPARTY RESPONSIBLE TEST FREQUENCYTEST REQUIREMENT & STANDARDON-SITE MATERIALS TESTINGPRODUCTPARTY RESPONSIBLE FOR SUBMITTALREQUIRED SUBMITTALS PRIOR TO MOBILIZATIONREQUIRED SUBMITTALS DURING CONSTRUCTIONMATERIALS SUBMITTALS REQUIREDGENERAL CIVIL NOTESSURVEY NOTESCONSTRUCTION STAKING NOTESC0.1CIVILSPECIFICATIONS1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREETCOTTONWOOD ROADC0.2EXISTINGCONDITIONS1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREETCOTTONWOOD ROADCONSTRUCTION SEQUENCING NOTES:1.INSTALL SWPPP BMP's2.TOPSOIL STRIPPING AND GRUBBING (ENTIRE PROJECT EXTENTS) BY OTHERS.3.MASS GRADING TO SUBGRADE (ENTIRE PROJECT EXTENTS) BY OTHERS.4.STORM RETENTION GRADING5.ARTIFICIAL FIELD TURF INSTALL BY OTHERS.6.PARKING LOT INSTALL (BASE, ASPHALT & CURB)7.SIDEWALKS8.FINISH GRADING AND LANDSCAPINGC0.3CONSTRUCTIONFACILITIES PLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREETCOTTONWOOD ROADC1.0SITE PLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREETCOTTONWOOD ROADC4.0OVERALLGRADING &DRAINAGE PLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREETCOTTONWOOD ROADC4.1ENLARGEDGRADING1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 GRADING NOTES:1.FINISHED GRADE CONTOUR INTERVAL IS 0.25'.2.ACCESSIBLE ROUTES TO COMPLY WITH ADA REQUIREMENTS.3.LANDSCAPED AREAS TO HAVE A SLOPE NO GREATER THAN 4h:1v.4.ENSURE THE WALKS ALONG THE ACCESSIBLE ROUTE HAVE ARUNNING SLOPE OF 1:20 OR 5% MAXIMUM (EXCEPT AT THE CURBRAMPS, WHICH CAN BE UP TO 1:12 OR 8.33%) AND A CROSSSLOPE OF 1:48 OR 2% MAXIMUM. THIS INCLUDES AT THECROSSING OF DRIVE LANES.5.WHERE THE ACCESSIBLE ROUTES INTERSECT, A 48"X48" LEVEL"LANDING" THAT HAS A SLOPE OF 2% MAXIMUM IN ANYDIRECTION IS REQUIRED.6.MAINTAIN POSITIVE DRAINAGE TO CURB INLETS. SLOPE ASPHALTTO NEW CURB AT 1% MIN, 4% MAX.THIS SITE HAS BEEN DESIGNED IN COMPLIANCE WITHTHE STANDARDS OF THE AMERICANS WITHDISABILITIES ACT (ADA) AS CERTIFIED BY THEENGINEER OF RECORD, STAHLY ENGINEERING.ZACH LOWE, PECERTIFIED BY W OAK STREET C4.2PARKING LOTGRADING PLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 TYPICAL CONCRETE SIDEWALK SECTIONNOTESTYPICAL PAVEMENT SECTIONSNOTESUTILITY SLEEVE DETAILASPHALT APRON SECTIONNEW CHAIN LINK FENCENOTES:GRAVEL PATH SECTIONARTIFICIAL TURF FIEILD SECTION(BY OTHERS)TRAFFIC RATED CONCRETE SECTIONNOTESC4.3SITE DETAILS1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 RAMP CONSTRUCTION NOTESRAMP DETAIL FORSIDEWALK PERPENDICULAR TO CURBRAMP DETAIL FORSIDEWALK ADJACENT TO CURBTYPICAL CURB DETAILTYPICAL APPROACH DETAILNOTESNOTESRAMP DETAIL FORPLAZA SIDEWALKCURB / VALLEY GUTTER DETAILVALLEY GUTTER DETAILC4.3BSITE DETAILS1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 GENERAL STORMWATER SYSTEM NOTESNOTESSIDEWALK CHASE DETAILNOTESNOTESRETENTION BASIN DETAILNOTESC4.4STORM &DRAINAGEDETAILS1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 -0+250+001+002+00 3+00 4+00 5+00 6+00 7+00 8+00 C4.5STORM PLAN &PROFILE (NORTH)1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 7+008+009+00 10+00 11+00 12+00 13+00 14 + 0 0 14 + 3 4 C4.6STORM PLAN &PROFILE (SOUTH)1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREETCOTTONWOOD ROADPAVING LEGENDASPHALT(TRAFFIC RATED)CONCRETE SIDEWALK(NON-TRAFFIC RATED)CONCRETE(TRAFFIC RATED)ASPHALT SWALECURB(FULL HEIGHT, CATCH)CURB(LAYDOWN, CATCH)CURB(FULL HEIGHT, SPILL)CURB(LAYDOWN, SPILL)NOTES1.CONTRACTOR TO ENSURE DRAINAGEAT CURB TRANSITIONSGRAVEL SIDEWALK(NON-TRAFFIC RATED)ASPHALT(NON-TRAFFIC RATED)C5.0PAVING PLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594 W OAK STREET SIGNING NOTES:STRIPING/MARKING NOTES:C6.0SIGNAGE ANDSTRIPING PLAN1 4/22/2025 SITE PLAN SUBMITTAL ZWL JWF 2 6/13/2025 MASTER SITE PLAN RENEWAL ZWL JWF 3 7/8/2025 SITE PLAN RC1 ZWL JWF 4 8/4/2025 BID SET ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBOZEMAN SPORTS PARK PHASE 2 CITY OF BOZEMAN GREAT FALLS Phone:(406)604-4644BOZEMAN Phone:(406)522-9526CODY Phone:(307)509-5541BILLINGS Phone:(406)601-4055HELENA Phone:(406)442-8594