Loading...
HomeMy WebLinkAbout021 - L2.1 - Landscape DetailsSITE PLAN REVIEWFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONIN SECTION 36, TOWNSHIP 01S, RANGE 05E, P.M.M.LANDSCAPE DETAILSBOZEMAN TRAX - TRACK C RAIL EXTENSIONA PORTION OF THE MONTANA RAIL LINK R.O.WBOZEMAN, MONTANAL2.1 KP21349_10_LS_DETAILS.DWGAM07/11/25SITE PLAN REVIEW--------------21349.1032" LENGTH NON-ABRASIVE RUBBER TIES (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES 3-4" DEPTH WOOD MULCH RING APPROX 3-4' IN DIAMETER FINISH GRADE BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXISTING SOIL TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. 3 X DIA ROOT BALL MINNOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL. 4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 5.BACKFILL WITH AMENDED SOIL. 6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. RIPARIAN TREE POCKET PLANTING N.T.S.1 NOTES: 1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE REJECTED. CONTAINER REMOVAL WILL NOT BE AN EXCUSE FOR DAMAGED ROOT BALLS. 2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING, OR OTHER SURFACE. 3.PRUNE OUT ALL DAMAGED OR DEAD WOOD. 4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY. REJECTED MATERIALS TO BE IMMEDIATELY RETURNED TO SOURCE. 6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. TOP OF ROOT BALL SHALL BE 1-2" ABOVE SURROUNDING GRADE 3" DEPTH MULCH, KEEP MULCH AWAY FROM TRUNK REMOVE CONTAINER, LIGHTLY SCARIFY ROOTS BACKFILL WITH 75% NATIVE SOIL, 25% COMPOST RIPARIAN SHRUB POCKET PLANTING N.T.S.2 N.T.S. 4" NATIVE TOPSOIL PREP REMOVE ALL LARGE DEBRIS AND ROCKS EXISTING VEGETATION NOTE: 1.SCARIFY SUBGRADE 4", RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 2.TOP SOIL SHALL BE 4". 3.LANDSCAPE CONTRACTOR SHALL AMEND SOIL WITH 1" DEPTH OF ORGANIC COMPOST AND TILL INTO EXISTING TOPSOIL AND PREPARE FOR SEEDING SEEDED AREA SEEDING3 P:\21349_10_North_Park_Track_C_LA\CADD_C3D\PRODUCTION_DWG\21349_10_LS_DETAILS.dwg, LANDSCAPE DETAILS, 7/7/2025 2:54:54 PM, amartoncik, 1:1