Loading...
HomeMy WebLinkAbout011.4 - C2.8 - Storm Pond Plan and Profile 100-YEAR EVENT INUNDATION EXTENTS � N � � r v I i 46j6 SPILLWAYS WITH RIPRAP (Dsn = 6") 1-FT SOUTH BOUNDARY RSA PROPOSED TIERED RETENTION THICK, 4-FT WIDE, LINED WITH NON EN OF RAILROAD PONDS TO SERVE TRACK C RAIL *B EROSION CONTROL FABRIC (TYP.) - -- RIGHT-OF-WAY - —EXTENSION (TYP.) 4:1 MAX SLOPES -s \ 4671.0 _ -- 0 4672.0. _ - � 0 4672.5 - 46�g 5 `>\ o 0 �p s 4675.0 0 0 4677.5 PROPOSED TRACK C RAIL ALIGNMENT - _ o \ o \ o O PROPOSED 13' WIDE / Xo Q GRAVEL ACCESS VUB � � /1 a0 ROAD PER 2/C5.1 EXISTING MDEQ MONITOR WELL (M-37) a0�� FOR BOZEMAN SOLVENT SITE. NOT TO BE DISTURBED. ------------- -—— —— —— 0-- \ ------ ---------- ------46j 2. 4668.0 R` PLAN VIEW- STORM POND NOTE: FINISHED GRADE CONTOURS SHOWN AT 0.5-FT INCREMENTS. 468 680 ESTIMATED WATER SURFACE ELEVATION WITHIN TIERED STORM POND FROM 10-YEAR EVENT (TYP.) SPILLWAY _ _ — — — — — — — 467 STA = 1+50.03 _ — — 675 SPILLWAY ELEV = 4673.97 _ _ _ — — 1% STA = 1+05.20 �— ELEV = 4672.83 _ _ — — tiy�� S� p 9.9` 3% e SPILLWAY ti�� 2ss 41� 40% 0O STA - 0+65.95 ELEV = 4671.46 6 Q PROPOSED EXISTING GROUND 0.9 37 FINISHED GRADE _ 467 670 APPROX 4' DIA. HOLE WITH = EXCAVATE TO NATIVE GRAVELS COBBLE BACKFILL (TYP.) IN CENTER OD POND AND _ BACKFILL WITH COBBLES TO PROMOTE INFILTRATION (TYP.) NATIVE GRAVELS (TYP.) i 466 665 W oO N r N of � r nr rr r r a a as �a a a 0 0 0 0 0 0 ]PROFILE VIEW— STORM]POND NO. REVISIONS DRAWN BY DATE HORIZONTAL SCALEFEET 0 VERTICAL SCALEFEET 5 �0 N TgNq PROJECT #: 14-167 SHEET 0 B®/LdElLV1LAN T R1- X - TRACK C RAIL EXTENSION 32 DISCOVERY DRIVE � DATE: 07/07/2025 ��o� Eaic�nraes �v BOZEMAN,MT 59718 Civil Engineering Toss STORM POND - PLAN & PROFILE PHONE(406)582-0221 Geotechnical Engineering a s as PEFAX(406)582-5770 ALL PROJECT ENGINEER: RSR DRAWN BY: EJF = w .alliedengineedngmc Land Surveying ENGINEERINR �Ss`'`E BOZ EMIANI MIONTANA 5 BOZEMAN TRAX DESIGNED BY: RSR, EJF REVIEWED BY: RSR qVA ' STORM POND-PLAN&PROF.