Loading...
HomeMy WebLinkAbout023 WC Setback Planting FiguresFIGURE: 1DRAWN BY: JWJDATE: 6/14/2017PROJECT: 14-167³0 150 300 450Feet NORTH PARK DEVELOPMENT - PHASE 1WETLANDS AND WATERCOURSE SETBACKBOZEMAN, MT \\aesi-mt\projects\2014\14-167 North Park\08 ArcGIS\North Park Wetland with Field Points.mxd1 inch = 300 feet WETLANDS MANDEVILLE CREEK TRIBUTARY OF MANDEVILLECREEK WATERCOURSE SETBACK (50-FT) (ZONE 2 BOUNDARY) ZONE 1 BOUNDARY 100-YEAR FLOOD INUNDATIONEXTENTS PROPERTY BOUNDARY MANDEVILLE CREEK 1. WATERCOURSE SETBACKS DETERMINED IN ACCORDANCE TO SEC. 38.23.100 OF THE BOZEMAN MUNICIPAL CODE 2. THE INUNDATION EXTENTS FOR THE 100-YEAR EVENT SHOWN HERE WERE DETERMINED BY DETAILED METHODS SATISFYING THE CITY OF BOZEMAN'S FLOOD HAZARD EVALUATION STANDARDS. 3. WETLAND DELINEATION COMPLETED IN OCTOBER 2016 BY ALLIED ENGINEERNG AND UPDATED IN MAY 2017. ZONE 2 ZONE1 Civil EngineeringGeotechnical EngineeringLand Surveying32 DISCOVERY DRIVEBOZEMAN, MT 59718PHONE (406) 582-0221FAX (406) 582-5770www.alliedengineering.comSHEETNORTH PARK DEVELOPMENT - PHASE 1 DESIGNWATERCOURSE SETBACK PLANTING PLANBOZEMAN, MONTANAFIG. 4NORTH PARK - PH 1WATERCOURSE PLAN