EXISTING 36" RCP & CMP CULVERT 1. PHASE 1 MASS GRADING (EARTHWORK) TO STAY OUTSIDE THE
\ \ FOLLOWING AREAS: O
�\ � 10 �- \\ ". � ` \ \ �J \/ 1.1. WATER SEWER AND STORM EASEMENTS FOR CITY OF BOZEMAN
INFRASTRUCTURE
1.2. 100 YEAR FLOOD HAZARD INUNDATION EXTENTS FROM THE
vEXISTING 36' CAST IRON CULVERT AS BUILT CONDITION.
V 1.3. DELINEATED WETLAND AREAS.
1.4. ZONE 1 WATERCOURSE SETBACK.
EXISTING 42' OVERALL LENGTH CULVERT 1.5. ZONE 2 WATERCOURSE SETBACK.
EXTENSION WITH FISH RESTING STRUCTURE 2. PHASE 1 DOES NOT INCLUDE ANY CONSTRUCTION OF RAILROAD TRACK
OR CULVERT FOR STREAM CROSSING.
400' WIDE RAILROAD RIGHT-OF-WAY
\ RECENTLY COMPLETED RAILROAD
V A EMBANKMENT GRADING_= 1
100-YEAR EVENT INUNDATION EXTENTS LEGEND
INUNDATION EXTENTS FROM THE AS-BUILT CONDITION WITHIN
\ �S\ TRACT 1e11-D � � _ � \ � ----- � �\ \\\G'��0�\\ \ THE UPDATED FLOOD HAZARD EVALUATION (DATED 8/23/2024)
v o JL J[�L�'1.JL Jm INUNDATION EXTENTS FROM THE TRACK C CONDITION WITHIN
S S sir �\q \ �\ ■ THE UPDATED FLOOD HAZARD EVALUATION (DATED 8/23/2024)
\ f
APPROXIMATE MAIN RAIL INUNDATION EXTENTS FROM THE ORIGINAL FLOOD
'
LINE STATIONING (TYP.) HAZARD EVALUATION (DATED 12/9/2016)
INUNDATION EXTENTS FROM FINAL CONDITION WITHIN THE
UPDATED FLOOD HAZARD EVALUATION (DATED 8/23/2024)
\� MANDEVILLE CREEK NOT SURVEYED
\S\\\ IN DETAIL SOUTH OFTHIS POINTSIDING
\�\\ EXISTING MDEQ MONITOR WELL
EXISTING MAIN RAIL LINE \
%o (M-37) FOR.BOZEMAN SOLVENT
�S SITE.-NOT TO BE DISTURBED,,
o � iT, v
,� 100-YEAR EVENT INUNDATION
o EXTENTS FROM FINAL
\� CONDITION WITHIN UPDATED
\\ �� FLOOD HAZARD EVALUATION
(DATED 8/23/2024)
4880 �� 100-YEAR EVENT INUNDATION
,EXTENTS FROM TRACK C CONDITION
WITHIN UPDATED FLOOD HAZARD
EVALUATION (DATED 8/23/2024) ti } � �
i
All MASS GRADING PROPOSED WITHIN
TRACT 2-B AS PART OF PHASE 1 ,
NTT YEAR EVENT FLOOD INUNDATION \ '�
� v EXTENTS FROM ORIGINAL FLOOD HAZARD
\ \
\ EVALUATION (DATED 12/9/2016)
�� vv FUTURE WHEAT DRIVE
CROSSING AT MANDEVILLE \ 'll C �V;' �20' WIDE, 1' DEEP II `oxe 1' TALL BERM TO PREVENT TEMPORARY STILLING
\� \� CREEK. NOT THIS PROJECT o� ._ TEMPORARY CHANNEL FOR BASIN OVERFLOW FROM ENTERING RAILROAD ROW
STILLING BASIN OVERFLOW II'
\ WETLAND EXTENTS FROM \ \ \ II EXISTING STORM OUTFACE
v v 2023 WETLAND DELINEATION (TEMPORARY STILLING BASIN). 1`2
1
A, \\ BY WESTON SOLUTIONS 71P ;, 10 II
TRACT 2-B �� III��h NOT THIS PROJECT _
_ I I
MASS GRADING PROPOSED WITHIN o
TRACT 4-B, NOT THIS PROJECT. i
��v �� _ _ ��� AY p I II ♦•11 SEE SITE PLAN APPLICATIONx
N 24-161 -
WATERCOURSE ZONE 2 SETBACK
4685 �\ �� \ / / (FROM ORIGINAL MSP APPROVAL)
\ \\ I // WATERCOURSE ZONE 1 SETBACK \ II I I \TRACT 4-B
� ( PROPOSED GRADING EXTENTS FOR WHEAT
v DRIVE EXTENSION (SEPARATE PROJECT)
TRACT 3-B \
�
\ V A �� vvv.. I� \ 1 1
NO. REVISIONS DRAWN BY DATE 0 100 200 300 �0NTgNq PROJECT #: 14-167 SHEET
BOZEMAN TRAX - TRACK C RAIL EXTENSION 32 DISCOVERY DRIVE Civii En ineerin � DATE: 09/18/2024
]� ���
RORY SCOU BOZEMAN,MT 59718
SCALE (FEET) R—Y PHASING ]�][d�� e ]�][���]� ]� PHONE(406)582-0221 Geotechnical Engineering
¢I N..♦0776 RE FAX(406)582-5770 ALLIED
PROJECT ENGINEER: RSR DRAWN BY: EJF = w .alliedengineedng.00m Land Surveying ENGINEERINR
"1 "ERA`° BCZEMANI MONTANA u+� BOZEMAN TRAX
DESIGNED BY: RSR, EJF REVIEWED BY: RSR q'VA ' PHASING PLAN-PHASE 1
. r - NOTES:
�� 00 EXISTING 36" RCP & CMP CULVERT 1. PHASE 2 MASS GRADING (EARTHWORK) TO STAY OUTSIDE THE
'X _ FOLLOWING AREAS: O
\ \ 4610 �� A V �� 1.1. WATER, SEWER, AND STORM EASEMENTS FOR CITY OF
BOZEMAN INFRASTRUCTURE.
1.2. NON-APPROVED DISTURBANCE AREAS FOR WETLAND AND
STREAM PERMITTING.
EXISTING 36" CAST IRON CULVERT PHASE 2 INVOLVES THE CONSTRUCTION OF THE CULVERT AT
\���� � � 2 MANDEVILLE CREEK AND THE RAILROAD TRACK (TRACK C).
EXISTING 42' OVERALL LENGTH CULVERT
EXTENSION WITH FISH RESTING STRUCTURE
400' WIDE RAILROAD RIGHT-OF-WAY _
\ \ i RECENTLY COMPLETED RAILROAD
\ EMBANKMENT GRADING
o 100-YEAR EVENT INUNDATION EXTENTS LEGEND
V —PROPOSED 13-FT WIDE
PRIVATE ACCESS ROAD INUNDATION EXTENTS FROM THE AS-BUILT CONDITION WITHIN
N\ ll LVERT AT TRACT n-B � 'POSED CU(PHASE 2) '� � �\ � THE UPDATED FLOOD HAZARD EVALUATION (DATED 8/23/2024)
0 - O f�(PRO 00 / � \\ �( \\\ f ■ INUNDATION EXTENTS FROM THE TRACK C CONDITION WITHIN
° MANDEVILLE CREEK r�i1 q �� THE UPDATED FLOOD HAZARD EVALUATION (DATED 8/23/2024)
(PHASE 2)- PROPOSED ®,
- 'TRACK C 'APPROXIMATE MAIN RAIL INUNDATION EXTENTS FROM THE ORIGINAL FLOOD
2 LINE STATIONING (TYP.) HAZARD EVALUATION (DATED 12/9/2016)
PHASE� g PROPOSED RAILROAD 00 T ( ) °o ��
EMBANKMENT GRADING_ �� \ �� INUNDATION EXTENTS FROM FINAL CONDITION WITHIN THE
(PHASE 2) V o`� �\ � � \\ � UPDATED FLOOD HAZARD EVALUATION (DATED 8/23/2024)
MANDEVILLE CREEK NOT SURVEYED_ RUNAROUND-TTRRAACCK\�I\}\('\
IN DETAIL SOUTH OF THIS POINT I / 00 D v \ \ SIDING10
\�\\ EXISTING MDEO MONITOR WELL J I 11 ti � � \ EXISTING MAIN RAIL LINE \
%o\� (M-37) FOR.BOZEMAN SOLVENT
SITE.-NOT TO BE DISTURBED
100-YEAR EVENT INUNDATION I
/o � EXTENTS FROM FINAL
\� CONDITION WITHIN UPDATED l
HAZARD EVALUATION \
(DATED 8/23/2024)
4680 100-YEAR EVENT INUNDATION O Z\ \
EXTENTS FROM TRACK C CONDITION
� WITHIN UPDATED FLOOD
EVALUATION (DATED 8/23/2024)
MASS GRADING PROPOSED WITHIN �
\ TRACT 2-B AS PART OF PHASE 1�,
100-YEAR EVENT FLOOD INUNDATION
EXTENTS FROM ORIGINAL FLOOD HAZARD
EVALUATION (DATED 12/9/2016) ��
FUTURE WHEAT DRIVE ++ Io re� s'
CROSSING AT MANDEVILLE 'll C �T�; -20' WIDE, 1' DEEP II `oxe o0 1' TALL BERM TO PREVENT TEMPORARY STILLING
CREEK. NOT THIS PROJECT o� ._ TEMPORARY CHANNEL FOR BASIN OVERFLOW FROM ENTERING RAILROAD ROW
STILLING BASIN OVERFLOW 4'
WETLAND EXTENTS FROM \\\\
2023 WETLAND DELINEATION EXISTING STORM OUTFACE
BY WESTON SOLUTIONS )f Y ,V0 'I (TEMPORARY STILLING BASIN). 1`2
TRACT 2eB 00 II'0i�0 NOT THIS PROJECT _
MASS GRADING PROPOSED WITHIN a
TRACT 4-B, NOT THIS PROJECT. i
PLAN APPLICATION 24-161 -
WATEF ONE 2 SETBACK
4685 �\ �� \ / ORIGINAL MS P APPROVAL)
WATERCOURSE ZONE 1 SETBACK �RACT -B
� I PROPOSED GRADING EXTENTS FOR WHEAT
DRIVE EXTENSION (SEPARATE PROJECT) \ O
TRACT
3 7-y' R
NO. REVISIONS DRAWN BY DATE 0 100 200 300 �CNTgNq j��P PROJECT #: 14-167 SHEET
BOZEMAN MAN T RAX - TRACK C RAIL EXTENSION 32 DISCOVERY DRIVE Civii En ineerin � DATE: 09/18/2024 ���
RORY SCOU BOZEMAN,MT 59718
SCALE (FEET) R—Y PHASING ]�][e�� e PHASE PHONE(406)582-0221 Geotechnical Engineering
¢I N..♦0776 RE FAX(406)582-5770 ALLIED
PROJECT ENGINEER: RSR DRAWN BY: EJF = w .alliedengineedng.00m Land Surveying EWINEMiNG
FSS r ER Eon BOZ EMIANI MIONTANA yo BOZEMAN TRAX
DESIGNED BY: RSR, EJF REVIEWED BY: RSR q'VA ' PHASING PLAN-PRASE 2