HomeMy WebLinkAbout008 Storm Drain ReportStorm Drainage
Design Report
Track C Rail Extension
within
North Park Development
Bozeman, Montana
September 18, 2024
Prepared For:
Bozeman TRAX Partners, LLC
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 1
Table of Contents
1 Project Overview and Background ......................................................................................... 2
2 Hydrology ............................................................................................................................... 2
2.1 Pre-Development ............................................................................................................ 2
2.2 Post-Development ........................................................................................................... 3
3 Post-Development Hydraulics ................................................................................................ 3
3.1 Retention Ponds .............................................................................................................. 4
3.2 Culvert............................................................................................................................. 7
4 Maintenance Plan .................................................................................................................... 8
Table of Tables
Table 1 – Pre-Development Hydrology .......................................................................................... 3
Table 2 – Post-Development Drainage Basins ............................................................................... 3
Table 3 – Storage Volumes and Allowable Release Rate ............................................................... 4
Table 4 – Basin A: Northern Retention Pond ................................................................................. 5
Table 5 – Basin A: Southern Retention Pond ................................................................................. 5
Table 6 – Basin B.1 Retention Pond ............................................................................................... 5
Table 7 – Basin B.2 Tiered Retention Pond ................................................................................... 6
Table 8 – Basin C Retention Pond .................................................................................................. 6
Table 9 – Available Storage Volumes ............................................................................................ 6
Attachments:
Exhibit 1.1 – Vicinity Map
Exhibit 1.2 – USGS Quad Map
Exhibit 1.3 – Mandeville Creek Overview
Exhibit 2.1 – Pre-Development Drainage
Exhibit 2.2 – Post-Development Drainage
Appendix A – Supporting Calculations
Appendix B – Storm Drainage Plans
Appendix C – Groundwater Monitoring Data
References: (copies of each included with site plan submittal)
Flood Hazard Evaluation for Mandeville Creek (dated 12/9/2016)
Update to 2016 Flood hazard Evaluation for Mandeville Creek (dated 8/23/2024)
City of Bozeman Transfer Station Geotechnical Report (dated July of 2004)
Bozeman Solvent Site Water Main Extension Geotechnical Report (dated February of 2002)
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 2
1 Project Overview and Background
The Track C Rail Extension project is located on Tract 2-B of COS 2153A. This tract of land is
within the North Park Development, which is located near the north end of Bozeman, MT. The
overall development is bounded by the railroad to the north, Mandeville Lane to the south, North
7th Ave to the east, and Interstate 90 to the west. Most of the development area is state owned
land that will be developed as lease sites. A portion of land at the north end of the project are fee
simple. Tract 2-B is part of the fee simple land. The project is under jurisdiction of the City of
Bozeman (COB) and is being developed under the Master Site Plan process.
The terrain within and surrounding the project site is relatively flat and slopes gradually down to
the northwest towards Mandeville Creek. A flood hazard evaluation dated December 9, 2016
was completed for Mandeville Creek by Allied Engineering Services, Inc. (AESI). The 2016
flood hazard evaluation was updated to account for future road and rail crossings on Mandeville
Creek and future culvert replacements at the existing Railroad and Frontage Road crossings. The
updated Flood Hazard report is dated August 23, 2024. Both reports have been submitted as part
of the Master Site Plan for the overall development.
Current improvements considered with this report are specific to the extension of Track C from
the Burlington Northern Santa Fe (BNSF) right-of-way (ROW) to Tract 2-B. The extension will
require crossing Mandeville Creek. Drainage improvements will provide treatment for the rail
improvements until the rest of the site is developed. A future site plan for Tract 2-B will address
storm drainage for the entire site and may involve reconfiguring drainage improvements outlined
by this report. A temporary retention pond for the Wheat Drive Extension (a separate project) is
also proposed on Tract 2-B. AESI has been coordinating with the developer for Tract 2-B and
anticipate a future regional pond will be constructed to replace the temporary pond. The future
pond would then accommodate runoff from the Wheat Drive Extension, Track C Rail Extension,
and future site development for Tract 2-B.
2 Hydrology
The rational method was utilized to estimate peak runoff rates for conveyance sizing as outlined
by the City of Bozeman Design Standards and Specifications. A weighted runoff coefficient “C”
was determined based on a combination of open space (C=0.2) and pavement (C=0.98). The time
to concentration was estimated using the overland flow method from the City of Bozeman
Design Standards. A more detailed breakout of the data for the basin is provided in Appendix A.
2.1 Pre‐Development
An overview of the pre-development drainage is provided on Exhibit 2.1. Runoff from the site
generally flows north to near the railroad right-of-way. Runoff is then directed northwest along
the existing rail via natural topography and ditches associated with Red Wing Drive which has
been abandoned. The pre-development basin is assumed to match the area of disturbance for the
purpose of sizing treatment facilities. A small berm is proposed along the south edge of the rail
improvements which will maintain the current drainage patterns. A summary of the pre-
development basin characteristics is provided in Table 1.
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 3
Table 1 – Pre-Development Hydrology
Basin Total Area
(acres)
Impervious
(sf)
Open
Space (sf)
Weighted
C tc (min) 10-yr Peak
Runoff (cfs)
A 1.04 0 45,386 0.20 50 0.15
B.1 0.23 0 9,900 0.20 15 0.07
B.2 0.10 0 4,528 0.20 14 0.03
C 0.72 0 31,231 0.20 22 0.18
D 0.37 0 16,069 0.20 14 0.12
2.2 Post‐Development
The post-development drainage basins are summarized in Table 2. An overview of the post-
development drainage is provided on Exhibit 2.2. Drainage from off-site will be routed around
the proposed storm ponds with a small berm on the uphill sides. This will maintain the pre-
development drainage pattern with the same outfall point to the northwest at Mandeville Creek.
Runoff from the temporary stilling basin from Phase 2 of North Park will also be routed around
using the same berm and a shallow channel cut through slight adverse grade to convey overflow
towards Mandeville Creek.
Table 2 – Post-Development Drainage Basins
Basin Total Area
(acres)
Impervious
(sf)
Open
Space
(sf)
Weighted C tc
(min)
10-yr Peak
Runoff
(cfs)
A 1.04 17,354 28,032 0.50 6 1.48
B.1 0.23 3,920 5,980 0.51 9 0.45
B.2 0.10 1,773 2,755 0.51 8 0.13
C 0.72 19,247 11,984 0.68 6 1.40
D 0.37 8,076 7,993 0.59 6 0.62
3 Post‐Development Hydraulics
The drainage improvements will consist of long retention ponds following along each side of the
new rail line (north and south) and retention ponds in the vicinity the creek. The post-
development retention ponds consider the 10-year design event as outlined in the City of
Bozeman Design Standards and Specifications. During a larger event, such as a 100-year,
stormwater would overtop the retention ponds and flow along the rail spur line down to
Mandeville Creek, maintaining the pre-development drainage condition. A 144” equivalent
CMPA (171”x110”) culvert is proposed to be installed for the railroad spur line to cross
Mandeville Creek. This culvert has been designed to handle the 100-year estimated peak flow
rate of 517-cfs outlined in the 2016 Mandeville Creek Flood Hazard Evaluation for the North
Park Development. More information related to the proposed crossing and conveyance
infrastructure for Mandeville Creek is included with the 8/23/2024 Update to the Mandeville
Creek Flood Study.
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 4
3.1 Retention Ponds
Retention volumes required for the proposed storm ponds was estimated using the following
equations as outlined in the City of Bozeman Design Standards and Specifications.
Q ൌ CIA
V ൌ 7200Q
Where: C ൌ Weighted C Factor
I ൌ 0.41 in/hr
A ൌ Area
Q ൌ runoff
V ൌ volume
A weighted runoff coefficient “C” was determined based on a combination of open space
(C=0.2) and pavement (C=0.98). Although the proposed rail spur line and gravel access road will
likely have a lower runoff coefficient, a value of 0.98 was assigned to these areas to be
conservative.
Table 3 – Storage Volumes and Allowable Release Rate
Basin
Minimum Required
Retention Storage
Volume (cf)
Water
Quality
Volume
(cf)
Minimum
Required
Detention Storage
Volume (cf)
Allowable Release Rate
(Pre-Development Peak
Runoff)
(cfs)
A 1,524 723 676 0.15
B.1 340 163 101 0.07
B.2 154 73 45 0.03
C 1,433 802 561 0.18
D 637 333 200 0.12
Current improvements do not include detention ponds. The minimum required detention storage
volume and allowable release rate are provided for future sizing of a regional pond for the
overall site. The future drainage improvements for full development of Tract 2-B should consider
pre-and post-development drainage and facility sizing for the overall site. Values from the table
should be used for future estimating only.
Because the rail spur line is designed with a crowned subgrade and mostly symmetrical retention
storm ponds, it is assumed that stormwater runoff will be evenly distributed between each side of
the tangent section of track. Table 4 and Table 5 below show the stage-storage relationship for
the two retention ponds (northern and southern sides of the rail spur line). The storage for each
pond at a depth of 0.90 feet is greater than the minimum retention pond volume provided above.
When adding the storage from each pond together, these tables show the retention ponds provide
more than triple the minimum storage volume required for Basin A.
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 5
Table 4 – Basin A: Northern Retention Pond
Stage (ft) Elevation (ft) Storage Volume (cf)
0.00 4674.60 0
0.25 4674.85 193
0.50 4675.10 774
0.75 4675.35 1741
0.90 4675.50 2506
Table 5 – Basin A: Southern Retention Pond
Stage (ft) Elevation (ft) Storage Volume (cf)
0.00 4674.60 0
0.25 4674.85 193
0.50 4675.10 774
0.75 4675.35 1741
0.90 4675.50 2506
Basins B.1, B.2, and C represent areas located near the creek crossing where topography begins
to fall towards the creek. It will not be feasible to include the linear retention ponds in these areas
due to topography. Treatment for these drainage basins will therefore utilize small stormwater
retention ponds to provide control of sediment/water quality. The stormwater retention ponds
will encroach into the zone 2 watercourse setback but will not be extended into the zone 1
watercourse setback. Sheets C2.6, C2.7, and C2.8 provide plan and profile views showing the
proposed elevations and detailed grading. Estimated storage volumes for the stormwater ponds
are included in Table 6, Table 7, and Table 8. Basin B.2 will utilize a stormwater pond with three
tiered levels of storage. The tiered stormwater pond for Basin B.2 is necessary due to space
constraints.
Table 6 – Basin B.1 Retention Pond
Stage (ft) Elevation (ft) Storage Volume (cf)
0.00 4667.80 0
0.25 4668.05 110
0.50 4668.30 240
0.75 4668.55 393
1.00 4668.80 570
1.25 4669.05 771
1.50 4669.30 1,000
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 6
Table 7 – Basin B.2 Tiered Retention Pond
Stage (ft) Elevation (ft) Total Storage Volume (cf)
0.00 4670.55, 4671.93, 4673.07 0
0.25 4670.80, 4672.18, 4673.32 3
0.50 4671.05, 4672.43, 4673.57 23
0.75 4671.30, 4672.68, 4673.82 83
0.90, 1.0, 0.90 4671.45, 4672.83, 4673.97 165
Table 8 – Basin C Retention Pond
Stage (ft) Elevation (ft) Storage Volume (cf)
0.00 4669.25 0
0.25 4669.50 401
0.50 4669.75 842
0.75 4670.00 1,324
1.00 4670.25 1,847
1.25 4670.50 2,415
1.50 4670.75 3,025
A summary of required retention volumes and provided storage for each basin is outlined in
Table 9. Storage volumes for all ponds were calculated using Autodesk Civil 3D. All basins
except Basin D have adequate storage volumes. Due to its proximity to the creek, the runoff from
Basin D cannot be captured and conveyed to a treatment area. The runoff from Basin D is a
relatively small amount and the total available storage volume has been conservatively oversized
to account for this runoff that cannot be captured and treated.
Table 9 – Available Storage Volumes
Basin Minimum Required Retention
Storage Volume (cf)
Available Storage
Volume (cf)
Excess Storage
Volume (cf)
A 1,524 5,012 3,487
B.1 340 1,000 660
B.2 154 165 11
C 1,433 3,025 1,592
D 637 0 0
Total 4,061 9,202 5,141
As shown in Table 9, the total capacity of the proposed retention ponds provide storage beyond
the minimum volume needed for the entire area of improvements. The relatively small area near
the creek not being captured (Basin D) is not anticipated to have a significant impact on peak
runoff rates. The area not captured is relatively small compared to the overall improvement area
and the current retention ponds and future regional detention pond will be able to over-account
and maintain overall peak runoff rates. For water quality considerations, we anticipate that the
area will be well vegetated within the watercourse setback area and will provide treatment for the
relatively small runoff volume. As mentioned earlier, conservative runoff coefficients were used
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 7
for the post-development runoff calculations. Actual peak runoff rates for the 10-year event are
anticipated to be less than what is shown in this report.
The average depth of cut for the bottom of the retention storm ponds between station 11+50 and
17+00 is anticipated to be 2.5 feet below existing ground. Although the excavation for the rail
spur line is proposed to enter a region of significant “cut” during the last 80 feet (station 18+00
to 18+80) groundwater is not anticipated to be an issue. The maximum depth of cut for the storm
ponds during the last 80 feet is anticipated to be 6.5 feet below existing ground. If groundwater is
encountered, the overall length of the rail spur line might need to be reduced, or another solution
may need to be found.
Groundwater monitoring data was collected on site by Sanderson Stewart during the spring of
2023. Groundwater was measured at a depth of 7.56-ft below ground at the monitor well (#4)
nearest to the end of the rail spur line. The 2023 groundwater monitoring data is included in
appendix C of this report.
A geotechnical test pit near the end of the proposed rail spur line was dug on January 23, 2004.
This was test pit #1 for the potential City of Bozeman Transfer Station project. The test pit was
dug to a depth of 8 feet and orange discoloration that may indicate high seasonal ground water
was found at a depth of 7 feet. Groundwater monitoring from mid-May to early July in 2004
showed this monitor well did not encounter any groundwater. Native gravels were found at a
depth of approximately 3 feet. See the referenced COB Transfer Station Geotechnical Report
from July of 2004.
A second geotechnical test pit in the same area was dug on June 24, 1988. This was test pit #103
(from HKM) included with the geotechnical report from February 2001 for the city of Bozeman
Water Main Extension associated with the Bozeman Solvent Site. This test pit encountered
gravels at a depth of 4.5 feet and groundwater at 11 feet. Test pit #104 from this report showed
well-graded gravels at 3 feet and no groundwater present. Please see the attached geotechnical
report for the Bozeman Solvent Site Water Main Extension.
Both referenced geotechnical reports support the conclusion that groundwater is not anticipated
to be an issue for the storm ponds and adequately permeable soils will likely be encountered.
This is also consistent with the subsurface conditions that were encountered during the summer
of 2022 while extending the existing water main and sewer main casings within the railroad
ROW.
3.2 Culvert
Mandeville Creek flows into the North Park development via two existing CMP culverts that
cross Interstate 90. One culvert is a 48-inch equivalent, and the other is a 60-inch equivalent (see
Exhibit 1.3). Existing 36-inch culverts convey flow off the development site under the main rail
line and Frontage Road before Mandeville Creek outfalls to the East Gallatin River. Flood
hazard evaluations have been completed for Mandeville Creek dated 12/9/2016 and an updated
flood hazard evaluation dated 8/23/2024.
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 8
A culvert is necessary for the Track C rail spur line to cross Mandeville Creek. This proposed
culvert has been designed to handle the estimated peak flow rate of 517-cfs from the 100-year
event outlined in the 2016 Mandeville Creek Flood Hazard Evaluation for the North Park
Development. A 144” equivalent CMPA (171”x110”) and embedment depth of approximately 1-
foot is proposed for the Track C rail spur line crossing. This proposed culvert was modeled as
part of the Updated Flood Hazard Evaluation (dated 8/23/2024) along with other proposed
crossings (Wheat Drive and Cultivar Street) and existing culverts to be replaced in the future
(main rail line and Frontage Road). While flowing at the design rate of 517-cfs, the headwater
depth will be maintained below the crown of the culvert.
The two existing culverts just downstream of this proposed box culvert are very undersized as
noted by the flood hazard reports. The existing culvert at the main rail line is 36-inch diameter
consisting of cast iron and heavy wall steel. The existing culvert at Frontage Road is a 36-inch
diameter consisting of RCP and CMP. We have coordinated with BNSF about the existing
undersized railroad culvert and they have told us we can proceed with designing a replacement
culvert capable of passing the estimated peak flow from the 100-year event. We have notified
MDT that BNSF is willing to allow their culvert to be upsized just upstream of Frontage Road.
MDT has outlined the process for us to design a replacement culvert at the Frontage Road
crossing.
4 Maintenance Plan
All proposed storm ponds will be privately owned and maintained. Storm infrastructure
generally consists of retention storm ponds to capture sediment. The retention ponds may collect
debris and should be inspected in the spring and fall and cleaned if debris is present.
The proposed retention ponds should be mowed, and any grass clippings or other organic matter
collected and removed from the pond bottom. The overflow paths designed for each pond should
be kept clear of debris to allow for proper conveyance. A more detailed maintenance plan is
outlined below.
The proposed retention ponds are relatively small and collect limited drainage areas; however, it
will still be critical to monitor and maintain the ponds. The following recommendations are from
the Montana Post-Construction Storm Water BMP Design Guidance Manual. Refer to the
manual for additional information and detail.
As needed Maintenance
o Remove litter/debris from all components of the infiltration basin.
o Repair structural components including inlets, diversion structures, and outlet
structure (if applicable).
o Inspect the basin for signs of erosion and repair eroded areas accordingly.
Perform spot-reseeding if necessary.
o Observe drain time following rainfall events to determine if the facility is
clogged. If the observed drain time is longer than the local jurisdiction’s
North Park Development – Track C Rail Extension
September 18, 2024
Project: 14‐167
Bozeman Office . 32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Fax: (406) 582-5770 Page 9
allowable maximum drain time, corrective action must be taken to return the
infiltration basin to the design drain time.
o Regularly manage all vegetation associated with the infiltration basin and remove
all clippings.
Semiannual Maintenance
o Trim vegetation for aesthetics and to prevent the establishment of woody
vegetation that may drop leaf litter, fruits, and other vegetative material that may
clog the facility.
o Remove all green waste and dispose of properly to prevent clogging.
Annual Maintenance
o Inspect all components of the infiltration basin in accordance with an approved
inspection form. Refer to the Post-Construction BMP Design Manual for
additional information and example forms.
o Remove sediment from inlets, in-flow paths, and overflow paths.
P:\2014\14‐167 North Park\05 Design\H & H\Railroad Mandeville Crossing\Storm Drainage Design Report\1 Storm Drainage
Report\Storm Drainage Report ‐ 2024_09_18.docx
EX-Civil Engineering
Geotechnical Engineering
Land Surveying
32 DISCOVERY DRIVE . BOZEMAN, MT 59718
PHONE (406) 582-0221 . FAX (406) 582-5770
www.alliedengineering.com
NORTH PARK DEVELOPMENT
VICINITY MAP
BOZEMAN, MT
N
N
1.1
EX-Civil Engineering
Geotechnical Engineering
Land Surveying
32 DISCOVERY DRIVE . BOZEMAN, MT 59718
PHONE (406) 582-0221 . FAX (406) 582-5770
www.alliedengineering.com
NORTH PARK DEVELOPMENT
USGS QUAD MAP
BOZEMAN, MT
N
1.2
EXHIBIT 1.3
MANDEVILLE CREEK OVERVIEW
ƉƉĞŶĚŝdž
^ƵƉƉŽƌƚŝŶŐĂůĐƵůĂƚŝŽŶƐ
Job #: 14-167
Engineer: Eric Foss
Date: 09/16/2024
Calculation of Required Volume for Storm Detention Pond
Pond ID Track C Rail Extension
Accepts flow from basins Basin A
(Reference: Bozeman Stormwater Master Plan - 1982)
Design Rainfall Freq. 10 year (see page III - 5 of master plan)
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Pre-development Calculations Post-development Calculations
CC
Areas (ft2):open space 45,386 0.20 Areas (ft2):open space 28,032 0.20
med. res. 0.35 med. res. 0.35
dense res. 0.50 dense res. 0.50
comm. neigh. 0.60 comm. neigh. 0.60
comm. down. 0.80 comm. down. 0.80
Pavement 0.98 Pavement 17,354 0.98
Total: 45,386 Total: 45,386
total area: 1.04 acres total area: 1.04 acres
composite C: 0.20 composite C: 0.50
Overland tc Overland tcaverage slope: 0.9 percent average slope: 22.5 percent
travel distance: 815 feet travel distance: 13.5 feet
tc:50 minutes tc:1 minutes (calculated)
tc:6 minutes (minimum)
Channel tc Channel tc
channel tc:minutes channel tc:minutes
Total tc:50 minutes Total tc:6 minutes
intensity at tc (fig 23):0.72 in/hr intensity at tc (fig 23):2.86 in/hr
pre-devel peak runoff: 0.15 cfs post-devel peak runoff: 1.48 cfs
Storm Duration Intensity Future Runoff Runoff Release Required
(minutes) (in/hr) Rate (cfs) Volume (cf) Volume (cf) Storage (cf)
6 2.86 1.48 534 54 480
8 2.37 1.23 591 72 519
10 2.05 1.06 639 90 548
12 1.82 0.95 681 108 573
14 1.65 0.86 719 127 592
16 1.51 0.78 753 145 609
18 1.40 0.73 785 163 622
20 1.31 0.68 814 181 634
22 1.23 0.64 842 199 643
24 1.16 0.60 868 217 651
26 1.10 0.57 893 235 658
28 1.05 0.55 916 253 663
30 1.00 0.52 938 271 667
32 0.96 0.50 960 289 671
34 0.93 0.48 980 307 673
36 0.89 0.46 1000 325 675
38 0.86 0.45 1019 343 676
40 0.83 0.43 1038 361 676
42 0.81 0.42 1056 380 676
44 0.78 0.41 1073 398 675
46 0.76 0.39 1090 416 674
48 0.74 0.38 1106 434 672
50 0.72 0.37 1122 452 670
52 0.70 0.36 1138 470 668
54 0.69 0.36 1153 488 665
56 0.67 0.35 1168 506 661
58 0.65 0.34 1182 524 658
required detention storage (ft3) =676
Detention Pond COB - Track C Rail Extension
Detention Pond Calculations: Retention Pond Calculations:
design depth of pond 1.50 feet Q = CIA
max side slope 4.00 horizontal to 1.00 vertical C = 0.50 (post-development)
length/width ratio 3.00 I = 0.41 in/hr (10-yr, 2-hr storm
min. particle removed 40 microns (1 micron = 1 x 10-6 meters)A = 1.04 acres
settling velocity of particle 0.0069 feet/second
Q = 0.21 cfs
min. pond to settle particle 22 square feet required retention storage (ft3) =1,524 ft3
pond dimentions assuming vertical side slopes (actual pond footprint will be larger) design depth 1.00 feet
width 12 length/width ratio 1.00
length 37
pond dimensions assuming vertical side slopes
Volume held between contours: (actual pond footprint will be larger)
Cumulative width 39
Contour Area (ft2) Delta V (ft
3)Volume (ft3)length 39
100.0
100.5 500 125 125
101.0 1,000 375 500
101.5 1,500 625 1,125
Design storage at 1.5' depth (ft3) =1,125
Detention Pond COB - Track C Rail Extension
Job #: 14-167
Engineer: Eric Foss
Date: 09/16/2024
Calculation of Required Volume for Storm Detention Pond
Pond ID Track C Rail Extension
Accepts flow from basins Basin B.1
(Reference: Bozeman Stormwater Master Plan - 1982)
Design Rainfall Freq. 10 year (see page III - 5 of master plan)
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Pre-development Calculations Post-development Calculations
CC
Areas (ft2):open space 9,900 0.20 Areas (ft2):open space 5,980 0.20
med. res. 0.35 med. res. 0.35
dense res. 0.50 dense res. 0.50
comm. neigh. 0.60 comm. neigh. 0.60
comm. down. 0.80 comm. down. 0.80
Pavement 0.98 Pavement 3,920 0.98
Total: 9,900 Total: 9,900
total area: 0.23 acres total area: 0.23 acres
composite C: 0.20 composite C: 0.51
Overland tc Overland tcaverage slope: 3.4 percent average slope: 5.5 percent
travel distance: 190 feet travel distance: 210 feet
tc:15 minutes tc:9 minutes (calculated)
Channel tc Channel tc
channel tc:minutes channel tc:minutes
Total tc:15 minutes Total tc:9 minutes
intensity at tc (fig 23):1.55 in/hr intensity at tc (fig 23):2.18 in/hr
pre-devel peak runoff: 0.07 cfs post-devel peak runoff: 0.25 cfs
Storm Duration Intensity Future Runoff Runoff Release Required
(minutes) (in/hr) Rate (cfs) Volume (cf) Volume (cf) Storage (cf)
9 2.18 0.25 138 38 99
11 1.92 0.22 148 47 101
13 1.72 0.20 156 55 101
15 1.57 0.18 164 64 101
17 1.45 0.17 172 72 100
19 1.35 0.16 178 80 98
21 1.26 0.15 185 89 96
23 1.19 0.14 191 97 93
25 1.13 0.13 196 106 91
27 1.07 0.12 202 114 87
29 1.02 0.12 207 123 84
31 0.98 0.11 212 131 81
33 0.94 0.11 216 140 77
35 0.91 0.10 221 148 73
37 0.88 0.10 225 156 69
39 0.85 0.10 229 165 64
41 0.82 0.09 233 173 60
43 0.79 0.09 237 182 55
45 0.77 0.09 241 190 51
47 0.75 0.09 245 199 46
49 0.73 0.08 248 207 41
51 0.71 0.08 252 216 36
53 0.69 0.08 255 224 31
55 0.68 0.08 259 232 26
57 0.66 0.08 262 241 21
59 0.65 0.07 265 249 16
61 0.63 0.07 268 258 10
required detention storage (ft3) =101
Detention Pond Calculations: Retention Pond Calculations:
Detention Pond COB - Track C Rail Extension
design depth of pond 1.50 feet Q = CIA
max side slope 4.00 horizontal to 1.00 vertical C = 0.51 (post-development)
length/width ratio 3.00 I = 0.41 in/hr (10-yr, 2-hr storm
min. particle removed 40 microns (1 micron = 1 x 10-6 meters)A = 0.23 acres
settling velocity of particle 0.0069 feet/second
Q = 0.05 cfs
min. pond to settle particle 10 square feet required retention storage (ft3) =340 ft3
pond dimentions assuming vertical side slopes (actual pond footprint will be larger) design depth 1.50 feet
width 5 length/width ratio 1.00
length 14
pond dimensions assuming vertical side slopes
Volume held between contours: (actual pond footprint will be larger)
Cumulative width 15
Contour Area (ft2) Delta V (ft
3)Volume (ft3)length 15
100.0
100.5 500 125 125
101.0 1,000 375 500
101.5 1,500 625 1,125
Design storage at 1.5' depth (ft3) =1,125
Detention Pond COB - Track C Rail Extension
Job #: 14-167
Engineer: Eric Foss
Date: 09/16/2024
Calculation of Required Volume for Storm Detention Pond
Pond ID Track C Rail Extension
Accepts flow from basins Basin B.2
(Reference: Bozeman Stormwater Master Plan - 1982)
Design Rainfall Freq. 10 year (see page III - 5 of master plan)
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Pre-development Calculations Post-development Calculations
CC
Areas (ft2):open space 4,528 0.20 Areas (ft2):open space 2,755 0.20
med. res. 0.35 med. res. 0.35
dense res. 0.50 dense res. 0.50
comm. neigh. 0.60 comm. neigh. 0.60
comm. down. 0.80 comm. down. 0.80
Pavement 0.98 Pavement 1,773 0.98
Total: 4,528 Total: 4,528
total area: 0.10 acres total area: 0.10 acres
composite C: 0.20 composite C: 0.51
Overland tc Overland tcaverage slope: 3.2 percent average slope: 5.3 percent
travel distance: 160 feet travel distance: 140 feet
tc:14 minutes tc:8 minutes (calculated)
Channel tc Channel tc
channel tc:minutes channel tc:minutes
Total tc:14 minutes Total tc:8 minutes
intensity at tc (fig 23):1.61 in/hr intensity at tc (fig 23):2.46 in/hr
pre-devel peak runoff: 0.03 cfs post-devel peak runoff: 0.13 cfs
Storm Duration Intensity Future Runoff Runoff Release Required
(minutes) (in/hr) Rate (cfs) Volume (cf) Volume (cf) Storage (cf)
8 2.46 0.13 59 15 43
10 2.11 0.11 64 19 44
12 1.87 0.10 68 23 45
14 1.68 0.09 72 27 45
16 1.54 0.08 75 31 44
18 1.42 0.07 79 35 43
20 1.33 0.07 82 39 42
22 1.25 0.07 85 43 41
24 1.18 0.06 87 47 40
26 1.11 0.06 90 51 38
28 1.06 0.06 92 55 37
30 1.01 0.05 94 60 35
32 0.97 0.05 97 64 33
34 0.93 0.05 99 68 31
36 0.90 0.05 101 72 29
38 0.87 0.05 103 76 27
40 0.84 0.04 105 80 25
42 0.81 0.04 106 84 23
44 0.79 0.04 108 88 20
46 0.77 0.04 110 92 18
48 0.74 0.04 112 96 16
50 0.72 0.04 113 100 13
52 0.71 0.04 115 104 11
54 0.69 0.04 116 108 8
56 0.67 0.04 118 112 6
58 0.66 0.03 119 116 3
60 0.64 0.03 121 120 1
required detention storage (ft3) =45
Detention Pond Calculations: Retention Pond Calculations:
Detention Pond COB - Track C Rail Extension
design depth of pond 1.50 feet Q = CIA
max side slope 4.00 horizontal to 1.00 vertical C = 0.51 (post-development)
length/width ratio 3.00 I = 0.41 in/hr (10-yr, 2-hr storm
min. particle removed 40 microns (1 micron = 1 x 10-6 meters)A = 0.10 acres
settling velocity of particle 0.0069 feet/second
Q = 0.02 cfs
min. pond to settle particle 5 square feet required retention storage (ft3) =154 ft3
pond dimentions assuming vertical side slopes (actual pond footprint will be larger) design depth 1.00 feet
width 3 length/width ratio 1.00
length 9
pond dimensions assuming vertical side slopes
Volume held between contours: (actual pond footprint will be larger)
Cumulative width 12
Contour Area (ft2) Delta V (ft
3)Volume (ft3)length 12
100.0
100.5 500 125 125
101.0 1,000 375 500
101.5 1,500 625 1,125
Design storage at 1.5' depth (ft3) =1,125
Detention Pond COB - Track C Rail Extension
Job #: 14-167
Engineer: Eric Foss
Date: 09/16/2024
Calculation of Required Volume for Storm Detention Pond
Pond ID Track C Rail Extension
Accepts flow from basins Basin C
(Reference: Bozeman Stormwater Master Plan - 1982)
Design Rainfall Freq. 10 year (see page III - 5 of master plan)
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Pre-development Calculations Post-development Calculations
CC
Areas (ft2):open space 31,231 0.20 Areas (ft2):open space 11,984 0.20
med. res. 0.35 med. res. 0.35
dense res. 0.50 dense res. 0.50
comm. neigh. 0.60 comm. neigh. 0.60
comm. down. 0.80 comm. down. 0.80
Pavement 0.98 Pavement 19,247 0.98
Total: 31,231 Total: 31,231
total area: 0.72 acres total area: 0.72 acres
composite C: 0.20 composite C: 0.68
Overland tc Overland tcaverage slope: 2 percent average slope: 22.5 percent
travel distance: 260 feet travel distance: 13.5 feet
tc:22 minutes tc:1 minutes (calculated)
tc:6 minutes (minimum)
Channel tc Channel tc
channel tc:minutes channel tc:minutes
Total tc:22 minutes Total tc:6 minutes
intensity at tc (fig 23):1.25 in/hr intensity at tc (fig 23):2.86 in/hr
pre-devel peak runoff: 0.18 cfs post-devel peak runoff: 1.40 cfs
Storm Duration Intensity Future Runoff Runoff Release Required
(minutes) (in/hr) Rate (cfs) Volume (cf) Volume (cf) Storage (cf)
6 2.86 1.40 502 64 438
8 2.37 1.16 555 86 470
10 2.05 1.00 601 107 493
12 1.82 0.89 640 129 512
14 1.65 0.80 676 150 526
16 1.51 0.74 708 171 537
18 1.40 0.68 738 193 545
20 1.31 0.64 765 214 551
22 1.23 0.60 791 236 556
24 1.16 0.57 816 257 559
26 1.10 0.54 839 279 560
28 1.05 0.51 861 300 561
30 1.00 0.49 882 321 561
32 0.96 0.47 902 343 559
34 0.93 0.45 922 364 557
36 0.89 0.44 940 386 555
38 0.86 0.42 958 407 551
40 0.83 0.41 976 429 547
42 0.81 0.39 992 450 542
44 0.78 0.38 1009 472 537
46 0.76 0.37 1025 493 532
48 0.74 0.36 1040 514 526
50 0.72 0.35 1055 536 519
52 0.70 0.34 1070 557 512
54 0.69 0.33 1084 579 505
56 0.67 0.33 1098 600 497
58 0.65 0.32 1111 622 490
required detention storage (ft3) =561
Detention Pond COB - Track C Rail Extension
Detention Pond Calculations: Retention Pond Calculations:
design depth of pond 1.50 feet Q = CIA
max side slope 4.00 horizontal to 1.00 vertical C = 0.68 (post-development)
length/width ratio 3.00 I = 0.41 in/hr (10-yr, 2-hr storm
min. particle removed 40 microns (1 micron = 1 x 10-6 meters)A = 0.72 acres
settling velocity of particle 0.0069 feet/second
Q = 0.20 cfs
min. pond to settle particle 26 square feet required retention storage (ft3) =1,433 ft3
pond dimentions assuming vertical side slopes (actual pond footprint will be larger) design depth 1.50 feet
width 11 length/width ratio 1.00
length 33
pond dimensions assuming vertical side slopes
Volume held between contours: (actual pond footprint will be larger)
Cumulative width 31
Contour Area (ft2) Delta V (ft
3)Volume (ft3)length 31
100.0
100.5 500 125 125
101.0 1,000 375 500
101.5 1,500 625 1,125
Design storage at 1.5' depth (ft3) =1,125
Detention Pond COB - Track C Rail Extension
Job #: 14-167
Engineer: Eric Foss
Date: 09/16/2024
Calculation of Required Volume for Storm Detention Pond
Pond ID Track C Rail Extension
Accepts flow from basins Basin D
(Reference: Bozeman Stormwater Master Plan - 1982)
Design Rainfall Freq. 10 year (see page III - 5 of master plan)
IDF coefficient a 0.64
IDF coefficient b
IDF coefficient n 0.65
Pre-development Calculations Post-development Calculations
CC
Areas (ft2):open space 16,069 0.20 Areas (ft2):open space 8,076 0.20
med. res. 0.35 med. res. 0.35
dense res. 0.50 dense res. 0.50
comm. neigh. 0.60 comm. neigh. 0.60
comm. down. 0.80 comm. down. 0.80
Pavement 0.98 Pavement 7,993 0.98
Total: 16,069 Total: 16,069
total area: 0.37 acres total area: 0.37 acres
composite C: 0.20 composite C: 0.59
Overland tc Overland tcaverage slope: 3 percent average slope: 25.2 percent
travel distance: 150 feet travel distance: 44 feet
tc:14 minutes tc:2 minutes (calculated)
tc:6 minutes (minimum)
Channel tc Channel tc
channel tc:minutes channel tc:minutes
Total tc:14 minutes Total tc:6 minutes
intensity at tc (fig 23):1.63 in/hr intensity at tc (fig 23):2.86 in/hr
pre-devel peak runoff: 0.12 cfs post-devel peak runoff: 0.62 cfs
Storm Duration Intensity Future Runoff Runoff Release Required
(minutes) (in/hr) Rate (cfs) Volume (cf) Volume (cf) Storage (cf)
6 2.86 0.62 223 43 180
8 2.37 0.51 247 58 189
10 2.05 0.44 267 72 195
12 1.82 0.40 285 86 198
14 1.65 0.36 300 101 200
16 1.51 0.33 315 115 199
18 1.40 0.30 328 130 198
20 1.31 0.28 340 144 196
22 1.23 0.27 352 158 193
24 1.16 0.25 363 173 190
26 1.10 0.24 373 187 186
28 1.05 0.23 383 202 181
30 1.00 0.22 392 216 176
32 0.96 0.21 401 230 171
34 0.93 0.20 410 245 165
36 0.89 0.19 418 259 159
38 0.86 0.19 426 274 152
40 0.83 0.18 434 288 146
42 0.81 0.18 441 302 139
44 0.78 0.17 448 317 132
46 0.76 0.16 455 331 124
48 0.74 0.16 462 346 117
50 0.72 0.16 469 360 109
52 0.70 0.15 475 374 101
54 0.69 0.15 482 389 93
56 0.67 0.15 488 403 85
58 0.65 0.14 494 418 76
required detention storage (ft3) =200
Detention Pond COB - Track C Rail Extension
Detention Pond Calculations: Retention Pond Calculations:
design depth of pond 1.50 feet Q = CIA
max side slope 4.00 horizontal to 1.00 vertical C = 0.59 (post-development)
length/width ratio 3.00 I = 0.41 in/hr (10-yr, 2-hr storm
min. particle removed 40 microns (1 micron = 1 x 10-6 meters)A = 0.37 acres
settling velocity of particle 0.0069 feet/second
Q = 0.09 cfs
min. pond to settle particle 17 square feet required retention storage (ft3) =637 ft3
pond dimentions assuming vertical side slopes (actual pond footprint will be larger) design depth 1.50 feet
width 7 length/width ratio 1.00
length 20
pond dimensions assuming vertical side slopes
Volume held between contours: (actual pond footprint will be larger)
Cumulative width 21
Contour Area (ft2) Delta V (ft
3)Volume (ft3)length 21
100.0
100.5 500 125 125
101.0 1,000 375 500
101.5 1,500 625 1,125
Design storage at 1.5' depth (ft3) =1,125
Detention Pond COB - Track C Rail Extension
Pre-Development 𝒕𝒄 Calculation for Basin A:
𝑡 =1.87൫1.1 −𝐶𝐶൯𝐷ଵ
ଶ
𝑆
ଵ
ଷ
Where: 𝑡 = Time of concentration,𝑚𝑖𝑛𝑢𝑡𝑒𝑠
S = Slope of basin,% = 0.9%
C = Rational Method Runoff Coefϐicient = 0.20
D = Length of Basin,𝑓𝑒𝑒𝑡= 815 𝑓𝑡
𝐶 = Frequency Adjustment Factor = 1.00
𝑡 =1.87(1.1 − (0.20)(1.00))815𝑓𝑡
ଵ
ଶ
0.9%ଵ
ଷ
=𝟓𝟎 𝒎𝒊𝒏𝒖𝒕𝒆𝒔
Water Quality Volume Calculation for Basin A:
𝑉 =𝐴𝑃
Where: 𝑉 = Water Quality Volume to be Retained,𝑐𝑢𝑏𝑖𝑐 𝑓𝑒𝑒𝑡
𝐴 = Impervious Area,𝑠𝑞𝑢𝑎𝑟𝑒 𝑓𝑒𝑒𝑡= 17,354 𝑠𝑞 𝑓𝑡
𝑃= Precipitation from ϐirst half inch of rain,𝑖𝑛𝑐ℎ𝑒𝑠= 0.5 𝑖𝑛𝑐ℎ𝑒𝑠
𝑉 =(17,354 𝑠𝑞 𝑓𝑡)(0.5 𝑖𝑛𝑐ℎ𝑒𝑠)൬ 1 𝑓𝑡
12 𝑖𝑛𝑐ℎ𝑒𝑠൰ =𝟕𝟐𝟑 𝒄𝒖𝒃𝒊𝒄 𝒇𝒆𝒆𝒕
ƉƉĞŶĚŝdž
Storm Drainage Plan
PROJECT LOCATION
BOZEMAN TRAX - TRACK C RAIL EXTENSION BOZEMAN, MONTANABOZEMAN TRAX
TRACK C RAIL EXTENSION
PROJECT ENGINEER: RORY S. ROMEY, PE
DESIGN ENGINEERS: RORY S. ROMEY, PE
ERIC J. FOSS, PE
Civil Engineering
Geotechnical Engineering
Land Surveying
32 DISCOVERY DRIVE
BOZEMAN, MT 59718
PHONE (406) 582-0221
FAX (406) 582-5770
www.alliedengineering.com
LOCATION MAP
OWNER: BOZEMAN TRAX PARTNERS LLC
5148 US 89
LVINGSTON, MT 59047
DEVELOPER: BOZEMAN TRAX PARTNERS LLC
5148 US 89
LIVINGSTON, MT 59047
CIVIL ENGINEER:ALLIED ENGINEERING SERVICES, INC.
32 DISCOVERY DRIVE
BOZEMAN, MT 59718
N
VICINITY MAP
N
PARCEL & SITE COVERAGE INFORMATION:
SEPTEMBER 18, 2024
BOZEMAN
LEGAL DESCRIPTION:A PORTION OF THE MONTANA RAIL LINK RIGHT-OF-WAY IN SECTION 36, TOWNSHIP 01S, RANGE 05E, P.M.M.,
GALLATIN COUNTY, MT;
SECTION 36, TOWNSHIP 01S, RANGE 05E, C.O.S. 2153A PARCEL TRACT 2-B; P.M.M., GALLATIN COUNTY, MT.
PROJECT LOCATION: BOUNDED TO THE NORTH BY THE RAILROAD MAINLINE/FRONTAGE ROAD, TO THE
EAST BY TRACT 4-B OF COS 2153A, TO THE SOUTH BY TRACT 3-B OF COS 2153A, AND
TO THE WEST BY TRACT 1-B OF COS 2153A IN THE CITY OF BOZEMAN, MONTANA.
PROJECT SURVEYOR:GREG FINK, PLS
BRANDON SCHREINER, PLS
SHEET INDEX
PEDESTRIAN FACILITIES ARE NOT INCLUDED
WITH THE PROPOSED IMPROVEMENTS
ƉƉĞŶĚŝdžC
Groundwater Monitoring Data
January 2024 Project No. 21363.01 GROUNDWATER MONITORING MEMORANDUM FOR SIMKINS NORTH PARK BOZEMAN, MONTANA During the period of April 12, 2023, to August 16, 2023, Sanderson Stewart performed weekly manual groundwater measurements at Simkin’s proposed sites, Tracts 2-B, 3-B, and 4-B, within North Park. Ten wells were monitored to determine the peak groundwater depth at various locations, see Monitoring Well Layout Exhibit. The groundwater elevations were measured using a Dipper-T water level meter within ten semi-permeable PVC pipes inserted into the ground. Shown below is a table and graph of the manual measurements recorded relative to the ground surface during the study. GROUNDWATER DEPTH BELOW GROUND SURFACE DATE WELL #1 WELL #2 WELL #3 WELL #4 WELL #5 WELL #7 WELL #8 WELL #9 WELL #10 WELL #11 4/12/2023 #N/A 6.57 7.01 7.56 6.05 N/A N/A 9.62 8.77 5.68 4/21/2023 7.63 6.22 7.00 7.69 7.04 7.98 8.63 8.63 7.73 5.18 4/28/2023 7.63 6.89 7.64 7.60 7.63 6.84 8.75 8.42 7.77 5.16 5/5/2023 7.63 7.2 7.63 7.59 7.63 6.96 8.75 8.61 8.15 5.58 5/10/2023 7.63 7.46 7.63 7.59 7.63 7.07 8.75 8.78 8.42 5.83 5/17/2023 7.63 7.63 7.63 7.59 7.63 7.54 8.75 9.33 8.90 6.25 5/26/2023 7.63 7.63 7.63 7.59 7.63 7.62 8.75 9.33 8.86 6.23 6/1/2023 7.63 7.63 7.63 7.59 7.63 7.44 8.75 9.33 8.95 6.26 6/9/2023 7.63 7.63 7.63 7.59 7.63 7.25 8.75 9.25 8.59 5.89 6/16/2023 7.63 7.63 7.63 7.59 7.63 7.28 8.75 9.33 8.70 6.04 6/23/2023 7.63 7.63 7.63 7.59 7.63 7.12 8.75 9.15 8.47 5.83 6/30/2023 7.63 7.48 7.63 7.59 7.63 7.03 8.75 8.97 8.32 5.75 7/5/2023 7.63 7.63 7.63 7.59 7.63 7.23 8.75 9.19 8.61 6.03 7/17/2023 7.63 7.63 7.63 7.59 7.63 7.47 8.75 9.33 9.06 6.51 7/24/2023 7.63 7.63 7.63 7.59 7.63 7.59 8.75 9.33 9.28 6.72 8/16/2023 7.63 7.63 7.63 7.59 7.63 7.98 8.75 9.33 9.33 7.07 =NO GROUNDWATER PRESENT =GROUNDWATER PRESENT
CONCLUSION Throughout the study three of the ten wells never contained groundwater, monitoring Wells 2 and 9 had groundwater present for a portion of the monitoring period, and monitoring Wells 7, 10, and 11 had groundwater present throughout the study. The data collected from the groundwater monitoring wells, both shown in the table and the graph, fail to provide a clear peak groundwater elevation. Wells 7, 10, and 11 did see a short peak but that is likely due to the high rainfall events which occurred in June 2023. 024681012Depth (ft)DateGroundwater DepthWELL #1WELL #2WELL #3WELL #4WELL #5WELL #7WELL #8WELL #9WELL #10WELL #11