Loading...
HomeMy WebLinkAbout07-C5-2 Paving Details 17/10/2025CITY OF BOZEMAN, GALLATIN COUNTY, MONTANANELSON ROAD & INTERSTATE 90 FRONTAGE ROADEXCEPTIONAL HEALTHCARE10875-SITE PLANNING | ENGINEERING | ENTITLEMENTS5300 TOWN & COUNTRY BOULEVARD, SUITE 190FRISCO, TEXAS 75034469-850-0060 | dec-en.comTBPE FIRM NO. F-20255MONTANALICENSED PROFESSIONAL ENGINEER DANIEL B .STEWARTNo. 90803 PE7/10/2025DETAILS AND NOTES ARE FOR PAVING IMPROVEMENTSON PRIVATE PROPERTY. ALL IMPROVEMENTS INPUBLIC RIGHT-OF-WAY AND EASEMENT SHALL BECONSTRUCTED IN ACCORDANCE WITH THE CITY'SSTANDARDS AND REGULATIONS.C5.2PAVING DETAILSDETAILS ON THIS SHEET ARE NOT TO SCALE.PAVING GENERAL NOTES1.ALL MATERIALS, CONSTRUCTION METHODS, AND TESTING FOR PAVING IMPROVEMENTS SHALL BE INACCORDANCE WITH THE GOVERNING AUTHORITY'S REGULATIONS, SPECIFICATIONS, AND DETAILS UNLESSOTHERWISE NOTED ON THESE PLANS.2.THE CONTRACTOR SHALL PROVIDE A TWO YEAR UNCONDITIONAL MAINTENANCE WARRANTY ON ALLPAVEMENT.3.ALL SUBGRADE SOILS SHALL BE PREPARED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT FOR THISPROJECT PREPARED BY CASTLE ROCK GEOTECHNICAL ENGINEERING, PROJECT NO. 024030CR DATED JUNE 7,2024 AND ANY SUPPLEMENTS AND/OR AMENDMENTS. SUBGRADE PREPARATION SHALL CONSIST OF THEFOLLOWING, UNLESS STATED OTHERWISE IN THE GEOTECHNICAL REPORT:3.1.PROOF-ROLL SOILS AND EXCAVATE ANY SOFT AREAS DOWN TO FIRM SUBGRADE, BACKFILL WITHCLEAN SOILS AND COMPACT.3.2.THE SUBGRADE SHALL BE PROTECTED AND MAINTAINED WITH DESIGN MOISTURE CONTENT UNTIL THEPAVEMENT HAS BEEN PLACED. DENSITY TESTS MUST BE TAKEN AFTER ANY PRECIPITATION EVENT ANDNO MORE THAN 72 HOURS PRIOR TO PLACEMENT OF PAVEMENT.4.THE USE OF LEVELING SAND UNDER CONCRETE PAVEMENT IS PROHIBITED.5.ALL PAVEMENT SHALL BE CONSTRUCTED TO THE THICKNESS AND MINIMUM STRENGTH SHOWN ON THEPAVING PLAN. ALL STRENGTHS FOR CONCRETE PAVEMENTS SHALL BE 28 DAY COMPRESSIVE STRENGTH,UNLESS OTHERWISE NOTED. CONCRETE SHALL HAVE A WATER-TO-CEMENT RATIO TO ACHIEVE A SLUMPBETWEEN THREE INCHES AND FIVE INCHES. CONCRETE SHALL BE ENTRAINED WITH 4.5 PERCENT AIR, WITHAN ACCEPTABLE DEVIATION OF 1.5 PERCENT (4.5% ±1.5%).6.ALL REINFORCING BARS AND DOWELS SHALL BE UNCOATED 60 KSI STEEL BARS.7.ALL REINFORCING BARS AND DOWELS MUST BE SUPPORTED WITH BAR CHAIRS.8.CONCRETE SHALL NOT BE PLACED WHEN THE OUTSIDE AMBIENT TEMPERATURE IS LESS THAN 40 DEGREESFAHRENHEIT, RAIN IS FALLING, OR RAIN IS IMMINENT. TEMPERATURE READINGS SHALL BE TAKEN IN THESHADE AWAY FROM ANY ARTIFICIAL HEAT OR COOLING SOURCE.9.CONCRETE SHALL BE POURED IN SECTIONS NOT TO EXCEED THIRTY FEET IN WIDTH, UNLESS PUMPED.10.ALL CONCRETE PAVEMENT SURFACES SHALL BE FINISHED WITH A LIGHT BROOM FINISH AND ALLOWED TOCURE FOR A MINIMUM OF 72 HOURS PRIOR TO PLACEMENT OF ANY LOADING. THE CONCRETE SURFACESHALL BE PROTECTED IN WINDY CONDITIONS TO PREVENT SURFACE CRACKING.11.THE CONTRACTOR SHALL PREPARE A JOINT LAYOUT PLAN AND PROVIDE IT TO THE DESIGN ENGINEER FORREVIEW A MINIMUM OF ONE WEEK PRIOR TO PAVING. THE JOINT PATTERN SHALL AVOID IRREGULAR SHAPESAND PLACEMENT OF JOINTS ALONG SWALE/VALLEY LINES. THE MAXIMUM JOINT SPACING SHALL BE:11.1.CONTROL JOINTS:5" PAVEMENT - 12.5 FEET6" PAVEMENT - 15 FEET7" PAVEMENT - 17.5 FEET11.2.EXPANSION JOINTS: 90 FEET12.SAW CUTTING OF JOINTS SHALL BE DONE AS SOON AS IT CAN SUPPORT THE WEIGHT OF SAWCUTTINGEQUIPMENT, AND WITHIN EIGHT HOURS OF THE CONCRETE BEING POURED. NO JOINT SHALL BE SHORTERTHAN EIGHTEEN INCHES (1'-6").13.ALL SLURRY AROUND SAW JOINTS SHALL BE CLEANED IMMEDIATELY. ONCE DRY AND WITHIN 48 HOURS, ALLJOINTS TO RECEIVE SEALANT SHALL BE CLEANED OF DIRT, DUST, DEBRIS, ETC. AND SEALED. SEALANT INVEHICULAR AREAS SHALL BE HOT POURED RUBBER JOINT SEALING COMPOUND. SEALANT IN SIDEWALKAREAS AND ADJACENT TO STRUCTURES SHALL BE A LIGHT GRAY (TO MATCH PAVEMENT COLOR) SILICONEBASED, SELF LEVELING SEALANT. SEALANT SHALL BE PLACED TO WITHIN 14" OF THE TOP OF PAVEMENT.14.UNLESS NOTED OTHERWISE, ALL EXPANSION JOINT MATERIAL SHALL BE PLACED SO THAT THE TOP OF THEFILLER MATERIAL IS ONE INCH BELOW THE TOP OF PAVEMENT.15.ALL CURBS AND PAVEMENT BEING PLACED ADJACENT TO EXISTING CURBS AND/OR PAVEMENTS SHALLMATCH THE SURFACE ELEVATION/SHAPE OF THE EXISTING CURB AND/OR PAVEMENT.16.ALL PAVEMENT MARKINGS SHALL BE WHITE, UNLESS OTHERWISE NOTED OR REQUIRED BY GOVERNINGAUTHORITY. MARKINGS SHALL BE PAINTED WITH TWO COATS OF UNDILUTED LATEX TRAFFIC PAINT AT THEMANUFACTURER'S RECOMMENDED APPLICATION RATE. THE SECOND COAT SHALL BE APPLIED NO MORETHAN SEVEN DAYS PRIOR TO USE BY THE GENERAL PUBLIC. MARKINGS SHALL HAVE SHARP EDGES AND ACONSISTENT COLOR. MARKINGS PERPENDICULAR TO CURB LINES SHALL BE PAINTED UP TO THE BOTTOMFACE OF THE CURB.17.REFER TO THE IRRIGATION PLAN, SITE LIGHTING PLAN, AND/OR FRANCHISE UTILITY PLAN(S) FOR CONDUITREQUIREMENTS. ALL CONDUITS SHALL BE PLACED PRIOR TO SUBGRADE BEING PREPARED.18.TESTING SHALL BE PERFORMED BY A QUALIFIED TESTING LABORATORY CONTRACTED DIRECTLY WITH THEOWNER/DEVELOPER. TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS IN THEGEOTECHNICAL REPORT OR AS DIRECTED BY THE OWNER/DEVELOPER. ANY TESTS INDICATING PAVEMENTFAILING TO MEET THE REQUIREMENTS OF THE PLANS AND/OR SPECIFICATIONS SHALL BE REMOVED ANDREPLACED AT THE CONTRACTOR'S EXPENSE. ALL COSTS OF RE-TESTING SHALL BE REIMBURSED BY THECONTRACTOR.19.ALL PAVEMENT SURFACES SHALL BE POWER WASHED TO REMOVE DIRT, DEBRIS, STAINS, ETC. AFTER ALLCONSTRUCTION EQUIPMENT AND MATERIAL HAVE BEEN REMOVED FROM THE PAVEMENT SURFACE, ANDPRIOR TO OPENING TO THE GENERAL PUBLIC.20.DETECTABLE WARNING SURFACES SHALL BE ALERTCAST REPLACEABLE CAST-IN-PLACE DETECTABLEWARNING MAT, COLONIAL RED, MANUFACTURED BY DECTABLE WARNING SYSTEMS OR APPROVEDEQUIVALENT.CONCRETE PAVEMENTASPHALT PAVEMENTINTEGRAL CURBCURB WITH ADJACENT SIDEWALKCONCRETE CURB & GUTTEREND CURBCONSTRUCTION JOINTASPHALT/CONCRETE HEADEREXPANSION JOINTCONTROL JOINTBUTT JOINT