Loading...
HomeMy WebLinkAboutDrainage Report EXCEPTIONAL HEALTHCARE Stormwater Drainage Report Exceptional Healthcare Bozeman Planning Application Number - 24318 Northwest corner of Frontage Road (IH90) and Nelson Road City of Bozeman, Montana PREPARED FOR Exceptional Healthcare 3514 Cedar Springs Road Dallas, Texas 75219 January 2025 PREPARED BY DEVELOPMENT ENGINEERING CONSULTANTS, LLC 5300 TOWN & COUNTRY BOULEVARD, SUITE 150 FRISCO, TEXAS 75034 469-850-0060 | dec-en.com December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 2 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 TABLE OF CONTENTS INTRODUCTION ........................................................................................................... 3 HYDROLOGY ................................................................................................................ 4 Existing Conditions .................................................................................................................................................4 Proposed Conditions ..............................................................................................................................................5 Runoff Calculations .................................................................................................................................................5 Stormwater Retention Calculations .......................................................................................................................8 GROUNDWATER AND SOILS INFORMATION ............................................................... 14 CONCLUSION .............................................................................................................. 18 APPENDIX A – DRAINAGE AREA EXHIBIT ..................................................................... 19 Figures Figure 1: Location Map ............................................................................................................................... 3 Figure 2 Nelson Meadows - Comprehensive Drainage Plan ...................................................................... 4 Figure 3: NRCS Soils Map .......................................................................................................................... 15 Figure 4: Groundwater Depth Comprehensive Drainage Plan for Nelson Meadows .............................. 16 Figure 5: Groundwater Monitor Wells - Comprehensive Drainage Plan for Nelson Meadows ............... 17 Tables Table 1: Time of Concentration – Sheet Flow ............................................................................................. 5 Table 2: Time of Concentration – Shallow Flow ......................................................................................... 6 Table 3: Time of Concentration Calculations Concentrated Flow and Total Tc ......................................... 6 Table 4: Weighted C Calculations ............................................................................................................... 7 Table 5: Runoff Calculations ....................................................................................................................... 7 Table 6: Pond 1 Runoff Reduction Volume ................................................................................................. 8 Table 7: Pond 1 Retention Volume ............................................................................................................. 8 Table 8:Pond 2 Runoff Reduction Volume .................................................................................................. 9 Table 9: Pond 2 Retention Volume ............................................................................................................. 9 Table 10: Pond 3 Runoff Reduction Volume ............................................................................................. 10 Table 11: Pond 3 Retention Volume ......................................................................................................... 10 Table 12: Pond 1 Appendix C DEQ Volume ............................................................................................... 11 Table 13: Pond 2 Appendix C DEQ Volume ............................................................................................... 12 Table 14: Pond 3 Appendix C DEQ Volume ............................................................................................... 13 Table 15: Pond Volume Calculassions....................................................................................................... 14 December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 3 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 INTRODUCTION The project is a 3.78-acre medical office project located on lots 21 and 22 of the Nelson Meadows Business Park. The site is located at the northwest corner of IH90 Frontage Road and Nelson Road. The Exceptional Healthcare site is located on Lots 21 and 22, Block 1 of the Nelson Meadows Subdivision. The project is zoned Light Manufacturing (M-1). The project will consist of a medical office building. The stormwater system has been designed utilizing the City of Bozeman Design Standards and Specifications. Figure 1: Location Map December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 4 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 HYDROLOGY The modified rational method was used to determine the existing and proposed flows and to determine the retention volumes. The existing basin utilized the runoff coefficient, C=0.20. The proposed runoff coefficient was computed based on the impervious area of the project improvements. Existing Conditions Currently the site is vacant land with existing slopes from 1% - 2%. The site is in the Royal Wolf Way plus Prince Lane (RWW & PL) drainage basin in the Comprehensive Drainage Plan for Nelson Meadows (Morrison Maierle, March 2019). The site is at the top of the basin. There are no existing stormwater improvements on the site. Rainfall drains to the northwest corner and is absorbed onsite through infiltration and absorption. The site flows from the southeast corner to the northwest side of the property. Figure 2 Nelson Meadows - Comprehensive Drainage Plan SITE December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 5 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Proposed Conditions The proposed site will drain to three retention areas located at the northwest (Pond 1), northeast (Pond 2, and southeast (Pond 3) of the property. The storm water for Ponds 1, 2 and 3 will be directed to the retention ponds with grading, curb and gutter and swales to the downstream elevation on the site. Pond 1 will incorporate an inlet and storm sewer pipe. The storm water will be captured and contained on the site. The retention ponds will be regularly maintained by the property owner, Exceptional Healthcare Inc. The ponds and drainage infrastructure will be visually inspected monthly. When the monthly inspection warrants, the ponds will be mowed and the curb openings and inlet unclogged as needed. Overtime, as sediment collects, sediment removal will be required to restore the pond volumes. Sediment accumulation will be inspected annually. When the sediment inspection warrants, sediment removal will be completed. Runoff Calculations The 2-year, 10-year and 100-year storm intervals were used to analyze the storm water runoff for the site. The time of concentration, C factor and rainfall was computed for the three ponds. Table 1: Time of Concentration – Sheet Flow Pre Development L US Elev DS Elev S P2 (ft)(ft)(ft)(ft/ft)(in)n (hr)(min) 1 100 4608.26 4606.00 0.023 1.13 0.15 0.26 15.7 2 35 4611.94 4610.96 0.028 1.13 0.15 0.10 6.2 3 33 4610.00 4609.88 0.004 1.13 0.15 0.22 13.4 Post Development L US Elev DS Elev S P2 (ft)(ft)(ft)(ft/ft)(in)n (hr)(min) 1 116 4609.58 4607.44 0.018 1.13 0.011 0.04 2.4 2 35 4611.86 4610.09 0.050 1.13 0.15 0.08 4.9 3 32 4609.90 4609.58 0.010 1.13 0.15 0.15 8.7 Sheet Flow Mannings Kinematic Solution tc(hr.)=0.007(nL)0.8 P2 0.5S0.4 Time of Concentration Calculations Sheet Flow Sheet Flow Tc Tc Basin ID Basin ID December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 6 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Table 2: Time of Concentration – Shallow Flow Table 3: Time of Concentration Calculations Concentrated Flow and Total Tc Pre Development L US Elev DS Elev S V (ft)(ft)(ft)(ft/ft)(ft/s)(hr)(min) 1 200 4606.00 4604.81 0.006 0.55 0.10 6.1 2 275 4610.96 4607.03 0.014 0.70 0.11 6.5 3 127 4609.88 4607.00 0.023 1.00 0.04 2.1 Post Development L US Elev DS Elev S V (ft)(ft)(ft)(ft/ft)(ft/s)(hr)(min) 1 0 0.00 0.00 0.000 0.0 0.00 0.0 2 275 4610.09 4606.00 0.015 2.5 0.03 1.8 3 128 4609.58 4607.00 0.020 2.7 0.01 0.8 Shallow Flow Tt(hr)=L 3600V Time of Concentration Calculations Tc Tc Shallow Flow Shallow Concentrated Flow Basin ID Basin ID Pre Development Total L US Elev DS Elev S Tc Tc (ft)(ft)(ft)(ft/ft)n (min)(min) 1 0 0 0 0 0 0 21.8 2 0 0 0 0 0 0 12.8 3 0 0 0 0 0 0 15.5 Post Development Total L US Elev DS Elev S Tc Tc (ft)(ft)(ft)(ft/ft)n (min)(min) 1 209 4605 4604 0.005 0.018 12.13 14.5 2 0 0 0 0 0 0 6.7 3 0 0 0 0 0 0 9.5 Concetrated Flow V= Time of Concentration Calculations Totals Concentrated Flow Concentrated Flow 1.49R2/3S1/2 n Basin ID Basin ID December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 7 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Table 4: Weighted C Calculations Table 5: Runoff Calculations Area Area Site C Weighted Type (ft2)(ac.)%Factor C Pond 1 Hardscape 43,121 0.99 66.3%0.95 0.63 Landscape 21,958 0.50 33.7%0.20 0.07 Gravel 0 0 0.50 0.00 Total 65,079 1.49 0.70 Pond 2 Hardscape 34,348 0.79 58.9%0.95 0.56 Landscape 24,008 0.55 41.1%0.20 0.08 Gravel 0 0 0.50 0.00 Total 58,356 1.34 0.64 Pond 3 Hardscape 14,857 0.34 36.0%0.95 0.34 Landscape 26,453 0.61 64.0%0.20 0.13 Gravel 0 0 0.50 0.00 Total 41,310 0.95 0.47 Weighted C Weighted C Calculations Weighted C Weighted C Area Tc I2 Q2 I10 Q10 I100 Q100 Basin ID (ac.)*C (min)(in/hr)(cfs)(in/hr)(cfs)(in/hr)(cfs) 1 1.49 0.20 21.8 0.94 0.3 1.74 0.5 2.74 0.8 2 1.34 0.20 12.8 1.37 0.4 2.53 0.7 3.98 1.1 3 0.95 0.20 15.5 1.21 0.2 2.25 0.4 3.53 0.7 Area Weighted Tc I2 Q2 I10 Q10 I100 Q100 Basin ID (ac.)C (min)(in/hr)(cfs)(in/hr)(cfs)(in/hr)(cfs) 1 1.49 0.70 14.5 1.27 0.0 2.34 2.4 3.69 3.8 2 1.34 0.64 6.7 1.89 0.0 3.51 3.0 5.53 4.7 3 0.95 0.47 9.5 1.59 0.0 2.93 1.3 4.61 2.1 Runoff Calculations Pre Development Peak Flows Post Development Peak Flows December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 8 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Stormwater Retention Calculations The City of Bozeman requires that the first 0.5 inches of rainfall to be captured. The proposed retention ponds have been sized to store the first 0.5 inches of rainfall from a 24-hour storm event. The volume of the first 0.5 inches of rainfall was computed using the Runoff Reduction Volume method from the Montana Post-Construction Stormwater BMP Manual, Equation 3-1. In addition to the first 0.5 inch of rainfall to be captured, the City of Bozeman requires retention ponds to be sized to hold the 10-year, 2- hour storm. A third computation was completed using the Montana DEQ Appendix C: Standard Storm Drainage Plan spreadsheet. The highest calculated volume was utilized to size the three ponds. Table 6: Pond 1 Runoff Reduction Volume Table 7: Pond 1 Retention Volume Area P RRV (ac.)(in.)Rv I (ac-ft)ft3 1.49 0.5 1.096 0.663 0.07 2,965 RRV=PRvA 12 RRV =Runoff Reduction Volume (acre-ft) P =Water quality rainfall depth (0.5 inches) Rv =Dimensionless runoff coefficient, Rv=0.5+0.9(I) I = A =Site Drainage Area (acres) Pond 1 Runoff Reduction Volume (First 0.5 inches of rainfall) Precent Impervious cover draining to the facility to a decimal form Area I*Q V (ac.)C (in/hr)(cfs)(ft3) 1.49 0.70 0.41 0.4 3,066 *City of Bozeman requires 10-yr, 2-hr storm Q=CIA C =Weighted C Factor V=7200Q I =0.41 in/hr (10-year 2-hr storm) A =Area (acres) Q =runoff (cfs) V =Volume (ft3) Retention Volume 10-yr, 2-hr storm December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 9 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Table 8:Pond 2 Runoff Reduction Volume Table 9: Pond 2 Retention Volume Area P RRV (ac.)(in.)Rv I (ac-ft)ft3 1.34 0.5 1.030 0.589 0.06 2,504 RRV=PRvA 12 RRV =Runoff Reduction Volume (acre-ft) P =Water quality rainfall depth (0.5 inches) Rv =Dimensionless runoff coefficient, Rv=0.5+0.9(I) I = A =Site Drainage Area (acres) Pond 2 Runoff Reduction Volume (First 0.5 inches of rainfall) Precent Impervious cover draining to the facility to a decimal form Area I*Q V (ac.)C (in/hr)(cfs)(ft3) 1.34 0.64 0.41 0.4 2,537 *City of Bozeman requires 10-yr, 2-hr storm Q=CIA C =Weighted C Factor V=7200Q I =0.41 in/hr (10-year 2-hr storm) A =Area (acres) Q =runoff (cfs) V =Volume (ft3) Retention Volume 10-yr, 2-hr storm December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 10 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Table 10: Pond 3 Runoff Reduction Volume Table 11: Pond 3 Retention Volume Area P RRV (ac.)(in.)Rv I (ac-ft)ft3 0.95 0.5 0.824 0.360 0.03 1,420 RRV=PRvA 12 RRV =Runoff Reduction Volume (acre-ft) P =Water quality rainfall depth (0.5 inches) Rv =Dimensionless runoff coefficient, Rv=0.5+0.9(I) I = A =Site Drainage Area (acres) Pond 3 Runoff Reduction Volume (First 0.5 inches of rainfall) Precent Impervious cover draining to the facility to a decimal form Area I*Q V (ac.)C (in/hr)(cfs)(ft3) 0.95 0.47 0.41 0.2 1,317 *City of Bozeman requires 10-yr, 2-hr storm Q=CIA C =Weighted C Factor V=7200Q I =0.41 in/hr (10-year 2-hr storm) A =Area (acres) Q =runoff (cfs) V =Volume (ft3) Retention Volume 10-yr, 2-hr storm November 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 Table 12: Pond 1 Appendix C DEQ Volume Sudivision Name EQ# County Gallatin County 0.9 Location NW corner IH90 and Nelson Rd.0.8 Lot/Area No.POND 1 0.1 0.2 Precipitation Data Q=C*i*A 2-year, Tc 0.94 inches/hour TC = Time of Concentration 2-year, 24-hour 1.13 inches 10-year, Tc 1.74 inches/hour 100-year, Tc 2.74 inches/hour 100-year, 24-hour 3.71 inches Total Area/Lot Size 1.494 acres =65078.64 ft2 Initial Stormwater Facility Volume (0.5" x Impervious Area) =1797 ft3 Paved/House Area 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Gravel Area 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Lawn/Landscaping 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Unimproved Area 1.494 acres 65078.64 ft2 Q=0.3 ft3/sec V=1,226 ft3 Q=0.5 ft3/sec Q=0.8 ft3/sec V=4,024 ft3 Total 1.494 acres 65078.64 ft2 QTotal=0.3 ft3/sec VTotal=1,226 ft3 QTotal=0.5 ft3/sec QTotal=0.8 ft3/sec VTotal=4,024 ft3 Paved/House Area 0.98992195 acres 43,121 ft2 Q=0.8 ft3/sec V=3,655 ft3 Q=1.6 ft3/sec Q=2.5 ft3/sec V=11,998 ft3 Gravel Area 0 acres 0 ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Lawn/Landscaping 0.50407805 acres 21,958 ft2 Q=0.0 ft3/sec V=207 ft3 Q=0.1 ft3/sec Q=0.1 ft3/sec V=679 ft3 Unimproved Area 0 acres 0 ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Total 1.494 acres 65078.64 ft2 QTotal=0.9 ft3/sec VTotal=3,861 ft3 QTotal=1.7 ft3/sec QTotal=2.6 ft3/sec VTotal=12,677 ft3 ΔQ=0.6 ft3/sec ΔV=2,636 ft3 ΔQ=1.1 ft3/sec ΔQ=1.8 ft3/sec ΔV=8,653 ft3 2636 ft3 Lawn/landscaping Appendix C: Standard Storm Drainage Plan Nelson Meadows - Lot 21 & 22 Rational Method Co-Efficients (C) Paved/hard surfaces Gravel surfaces (volume) Unimproved areas 2-year, Tc 2-year, 24-hour 10-year, Tc 100-year, Tc 100-year, 24-hour Pre-Development Characteristics (flow rate)(volume)(flow rate)(flow rate) 2-year, Tc 2-year, 24-hour 10-year, Tc 100-year, Tc 100-year, 24-hour (volume) Runoff Flow/Volume Change Required Minimum Facility Volume: Post-Development Characteristics (flow rate)volume)(flow rate)(flow rate) December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 12 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Table 13: Pond 2 Appendix C DEQ Volume Sudivision Name EQ# County Gallatin County 0.9 Location NW corner IH90 and Nelson Rd.0.8 Lot/Area No.1 - POND 2 0.1 0.2 Precipitation Data Q=C*i*A 2-year, Tc 1.37 inches/hour TC = Time of Concentration 2-year, 24-hour 1.13 inches 10-year, Tc 2.53 inches/hour 100-year, Tc 3.98 inches/hour 100-year, 24-hour 3.71 inches Total Area/Lot Size 1.34 acres =58370.4 ft2 Initial Stormwater Facility Volume (0.5" x Impervious Area) =1431 ft3 Paved/House Area 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Gravel Area 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Lawn/Landscaping 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Unimproved Area 1.34 acres 58370.4 ft2 Q=0.4 ft3/sec V=1,099 ft3 Q=0.7 ft3/sec Q=1.1 ft3/sec V=3,609 ft3 Total 1.34 acres 58370.4 ft2 QTotal=0.4 ft3/sec VTotal=1,099 ft3 QTotal=0.7 ft3/sec QTotal=1.1 ft3/sec VTotal=3,609 ft3 Paved/House Area 0.78852158 acres 34,348 ft2 Q=1.0 ft3/sec V=2,911 ft3 Q=1.8 ft3/sec Q=2.8 ft3/sec V=9,557 ft3 Gravel Area 0 acres 0 ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Lawn/Landscaping 0.55147842 acres 24,022 ft2 Q=0.1 ft3/sec V=226 ft3 Q=0.1 ft3/sec Q=0.2 ft3/sec V=743 ft3 Unimproved Area 0 acres 0 ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Total 1.34 acres 58370.4 ft2 QTotal=1.1 ft3/sec VTotal=3,137 ft3 QTotal=2.0 ft3/sec QTotal=3.1 ft3/sec VTotal=10,300 ft3 ΔQ=0.7 ft3/sec ΔV=2,038 ft3 ΔQ=1.3 ft3/sec ΔQ=2.0 ft3/sec ΔV=6,691 ft3 2038 ft3 (volume) Runoff Flow/Volume Change Required Minimum Facility Volume: Post-Development Characteristics (flow rate)volume)(flow rate)(flow rate) 2-year, Tc 2-year, 24-hour 10-year, Tc 100-year, Tc 100-year, 24-hour Pre-Development Characteristics (flow rate)(volume)(flow rate)(flow rate)(volume) Unimproved areas 2-year, Tc 2-year, 24-hour 10-year, Tc 100-year, Tc 100-year, 24-hour Lawn/landscaping Appendix C: Standard Storm Drainage Plan Nelson Meadows - Lot 21 & 22 Rational Method Co-Efficients (C) Paved/hard surfaces Gravel surfaces December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 13 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Table 14: Pond 3 Appendix C DEQ Volume Sudivision Name EQ# County Gallatin County 0.9 Location NW corner IH90 and Nelson Rd.0.8 Lot/Area No.1 - POND 3 0.1 0.2 Precipitation Data Q=C*i*A 2-year, Tc 1.21 inches/hour TC = Time of Concentration 2-year, 24-hour 1.13 inches 10-year, Tc 2.25 inches/hour 100-year, Tc 3.53 inches/hour 100-year, 24-hour 3.71 inches Total Area/Lot Size 0.95 acres =41382 ft2 Initial Stormwater Facility Volume (0.5" x Impervious Area) =619 ft3 Paved/House Area 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Gravel Area 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Lawn/Landscaping 0 acres ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Unimproved Area 0.95 acres 41382 ft2 Q=0.2 ft3/sec V=779 ft3 Q=0.4 ft3/sec Q=0.7 ft3/sec V=2,559 ft3 Total 0.95 acres 41382 ft2 QTotal=0.2 ft3/sec VTotal=779 ft3 QTotal=0.4 ft3/sec QTotal=0.7 ft3/sec VTotal=2,559 ft3 Paved/House Area 0.34106979 acres 14,857 ft2 Q=0.4 ft3/sec V=1,259 ft3 Q=0.7 ft3/sec Q=1.1 ft3/sec V=4,134 ft3 Gravel Area 0 acres 0 ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Lawn/Landscaping 0.60893021 acres 26,525 ft2 Q=0.1 ft3/sec V=250 ft3 Q=0.1 ft3/sec Q=0.2 ft3/sec V=820 ft3 Unimproved Area 0 acres 0 ft2 Q=0.0 ft3/sec V=0 ft3 Q=0.0 ft3/sec Q=0.0 ft3/sec V=0 ft3 Total 0.95 acres 41382 ft2 QTotal=0.4 ft3/sec VTotal=1,509 ft3 QTotal=0.8 ft3/sec QTotal=1.3 ft3/sec VTotal=4,954 ft3 ΔQ=0.2 ft3/sec ΔV=730 ft3 ΔQ=0.4 ft3/sec ΔQ=0.6 ft3/sec ΔV=2,395 ft3 729.5 ft3 (volume) Runoff Flow/Volume Change Required Minimum Facility Volume: Post-Development Characteristics (flow rate)volume)(flow rate)(flow rate) 2-year, Tc 2-year, 24-hour 10-year, Tc 100-year, Tc 100-year, 24-hour Pre-Development Characteristics (flow rate)(volume)(flow rate)(flow rate)(volume) Unimproved areas 2-year, Tc 2-year, 24-hour 10-year, Tc 100-year, Tc 100-year, 24-hour Lawn/landscaping Appendix C: Standard Storm Drainage Plan Nelson Meadows - Lot 21 & 22 Rational Method Co-Efficients (C) Paved/hard surfaces Gravel surfaces November 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 Table 15: Pond Volume Calculassions GROUNDWATER AND SOILS INFORMATION The National Resource Conservation Service (NRCS) classifies the soil type on site as Blackdog silt loam (50B). The soil is in hydrologic soil group C and made up of predominately silts and loams that are well drained. Groundwater levels were observed by Morrison-Maierle in 2018 between April and August as detailed in the Comprehensive Drainage Plan for Nelson Meadows (Morrison Maierle, March 2019). The monitoring well located on site is shown in Figure 4 (Summary of Ground water Depth Observations) in the Morrison Maierle report. The minimum depth below the ground elevation on the site is more than feet as shown in Figure 5 (Groundwater Observation Well Locations) in the Morrison Maierle report. The approximate bottom of the proposed retention pond will be 2 to 4 feet below existing grade and above the groundwater elevation. Elev Area Volume Provided Runoff Reduction Volume Retention Volume Appendix C DEQ Volume (ft)(ft2)(ft3)(ft3)(ft3)(ft3) 4602 1,689 0 4603 2,409 2,049 4604 3,230 4,869 2,965 3,066 2,636 Elev Area Volume Provided Runoff Reduction Volume Retention Volume Appendix C DEQ Volume (ft)(ft2)(ft3)(ft3)(ft3)(ft3) 4605 2,478 0 4606 3,294 2,886 2,504 2,537 2,038 Elev Area Volume Provided Runoff Reduction Volume Retention Volume Appendix C DEQ Volume (ft)(ft2)(ft3)(ft3)(ft3)(ft3) 4607 1,505 4608 2,210 1,858 1,420 1,314 730 Required Volume Pond 1 Volume Calculation Pond 2 Volume Calculation Pond 3 Volume Calculation Pond Volume Calculations Required Volume Required Volume December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 15 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Figure 3: NRCS Soils Map December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 16 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Figure 4: Groundwater Depth Comprehensive Drainage Plan for Nelson Meadows (Morrison Maierle, March 2019) December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 17 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 Figure 5: Groundwater Monitor Wells - Comprehensive Drainage Plan for Nelson Meadows (Morrison Maierle, March 2019) SITE December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 18 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 CONCLUSION The storm water management plan for the proposed development will adequately handle the storm events in accordance with the local and state requirements. Adequate stormwater storage will be provided. The development will not have adverse impacts to the surrounding properties. December 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875 19 DEC · 5300 Town & Country Boulevard, Suite 150 · Frisco, Texas 75034 · 469-850-0060 APPENDIX A – DRAINAGE AREA EXHIBIT November 2024 Storm Drainage Report – Exception Healthcare Bozeman DEC Job No. 10875