Loading...
HomeMy WebLinkAboutConcurrent Construction FormCO CURR N ~t~AS PR E FORMAL ACKNOWLEDGMENT ONS l RE 0 NTS C 0 N-5 ON E IS By requesting Concurrent Construction (CCON), the applicant is responsible for understanding and adhering to the Bozeman Municipal Code (BMC Sec. 38.270.030.Cl throughout the project development. The applicant understands and accepts the risk in application approval delays if the Concurrent Construction application does not satisfy all requirements of the BMC. The applicant acknowledges that by submitting Concurrent Construction he/she agrees: • Improvements will be designed, constructed, and installed according to the standards and criteria as adopted by the city • Building permits will not be issued until all improvements are approved by the review authority SIGNATURES This application must be signed by both the applicant{s) and the property owner(s) (if different) before the submittal will be accepted. /( Ji/ __ J Applicant Signature: _ ~Cf't-7' 11 Date: (] / JJ. 1cl 5 Applicant Printed Name: 1\ v ,. ~ /. ~ , Rhen Jo +tUr s-/--. Date: /.- Owner Signature: ~ c_t; );/l t/1"'1 Date:~~ 3 ~ OwnerPrintedName: bt::vv /VICt9t/A/I .. -~/! /J~~/?'!!_EDrtJJik/!R~~~ REQUIRED FORMS CCON, SP CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street PO Box 1230 Bozeman, MT 59715 For Official Use Only phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net/planning Check each box once each document is reviewed and approved. Concurrent construction cannot be approved until all documents have been completed and approved. D Infrastructure Review D Fire D Irrevocable Offer of Dedication D Concurrent Construction Request D Concurrent Construction Plan Concurrent Construction Existing or On-Site □Approval Ooenial Please provide explanation below Print Name: Date: Signature: J Page 2 of 2 I Revision Date: November 2021