By requesting Concurrent Construction (CCON), the applicant is responsible for understanding and adhering to the Bozeman
Municipal Code (BMC Sec. 38.270.030.Cl throughout the project development. The applicant understands and accepts the
risk in application approval delays if the Concurrent Construction application does not satisfy all requirements of the BMC.
The applicant acknowledges that by submitting Concurrent Construction he/she agrees:
• Improvements will be designed, constructed, and installed according to the standards and criteria as adopted by the city
• Building permits will not be issued until all improvements are approved by the review authority
SIGNATURES
This application must be signed by both the applicant{s) and the property owner(s) (if different) before the submittal will be
accepted. /( Ji/ __ J
Applicant Signature: _ ~Cf't-7' 11 Date: (] / JJ. 1cl 5
Applicant Printed Name: 1\ v ,. ~ /. ~ , Rhen Jo +tUr s-/--. Date: /.-
Owner Signature: ~ c_t; );/l t/1"'1 Date:~~ 3 ~
OwnerPrintedName: bt::vv /VICt9t/A/I .. -~/! /J~~/?'!!_EDrtJJik/!R~~~
REQUIRED FORMS
CCON, SP
CONTACT US
Alfred M. Stiff Professional Building
20 East Olive Street
PO Box 1230
Bozeman, MT 59715
For Official Use Only
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net/planning
Check each box once each document is reviewed and approved. Concurrent construction cannot be approved until all documents have been completed and approved.
D Infrastructure Review
D Fire
D Irrevocable Offer of Dedication
D Concurrent Construction Request
D Concurrent Construction Plan
Concurrent Construction Existing or On-Site
□Approval Ooenial Please provide explanation below
Print Name: Date:
Signature: