Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
022 A302 EXTERIOR ELEVATIONS
T.O. FIRST FLOOR 0' -0" T.O. WALK -3' -0" T.O.W. FIRST 8' -1 1/8" T.O. ROOF 38' -8" SECOND FLOOR 9' -1 3/4" T.O.W. SECOND 17' -2 7/8" THIRD FLOOR 18' -3 1/2" T.O.W. THIRD FLR. 26' -4 5/8"3' - 0"8' - 1 1/8"1' - 0 5/8"8' - 1 1/8"1' - 0 5/8"8' - 1 1/8"10" HARDIE FASCIA W/ 4" HARDIE SHADOW TRIM 1X4 HARDIE WINDOW TRIM 30 YEAR ARCHITECTURAL ASHALT SHINGLE HARDIE LAP SIDING 5" EXP. CONC. RETAINING WALL, SEE SITE PLAN 1 A401 B B B K E E K K E 1X8 HARDIE TRIMELECTRICAL METER SCREENING WALL, SEE A102 9"9"1' - 0"3"1' - 0" 0' - 3"-0' - 6" HARDIE BOARD & BATT (PAINT) TRANSPARENCY CALCULATIONS NORTH FACADE TOTAL FACADE:2,969 S.F. TOTAL TRANS.:766 S.F. PERCENT TRANS.26% EAST FACADE (S 19TH ST) TOTAL FACADE:1,002 S.F. TOTAL TRANS.: 155 S.F. PERCENT TRANS.:15% EAST FACADE IS A LANDSCAPE BLOCK FRONTAGE AND REQUIRES A MINIMUM 15% TRANSPARENCY. SOUTH FACADE TOTAL FACADE:2,969 S.F. TOTAL TRANS.:286 S.F. PERCENT TRANS.:10% WEST FACADE TOTAL FACADE:1,002 S.F. TOTAL TRANS.:155 S.F. PERCENT TRANS.:15% STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2025 625 SOUTH 19TH STREET BOZEMAN, MONTANA07/07/2025 Author Checker 19-076 CITY REVIEW A302THE PINES APARTMENTSPHASE IIEXTERIOR ELEVATIONS 1/4" = 1'-0"A302 1 EAST ELEVATION REVISION SCHEDULENO: DESCRIPTION: DATE: BY:1 COB REVISIONS 06/14/24 AS2 COB REVISIONS 07/08/25 AS