Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
021 A301 EXTERIOR ELEVATIONS
T.O. FIRST FLOOR 0' -0" T.O. WALK -3' -0" T.O.W. FIRST 8' -1 1/8" T.O. ROOF 38' -8" SECOND FLOOR 9' -1 3/4" T.O.W. SECOND 17' -2 7/8" THIRD FLOOR 18' -3 1/2" T.O.W. THIRD FLR. 26' -4 5/8" HARDIE BOARD & BATT (PAINT) 4 12 8 12 4 12 8 12 4 12 3' - 0"2 A400 CONC. PLANTING BED 30 YEAR ARCHITECTURAL ASHALT SHINGLE 10" HARDIE FASCIA W/ 4" HARDIE SHADOW TRIM 4X4 FIR KNEE BRACE 1X4 HARDIE WINDOW TRIM 1 A400 F F F G D D D D F F F F F F D D G F F F G D D HARDIE LAP SIDING 5" EXP. 1X8 HARDIE TRIM8' - 1 1/8"1' - 0 5/8"8' - 1 1/8"1' - 0 5/8"8' - 1 1/8"3' - 0"FDC/HORNSTROBE 1 A450 ELECTRICAL METER SCREENING WALL, SEE A102 6' - 0"2' - 6"2' - 6"4 A204 TRANSPARENCY CALCULATIONS NORTH FACADE TOTAL FACADE:2,969 S.F. TOTAL TRANS.:766 S.F. PERCENT TRANS.26% EAST FACADE (S 19TH ST) TOTAL FACADE:1,002 S.F. TOTAL TRANS.: 155 S.F. PERCENT TRANS.:15% EAST FACADE IS A LANDSCAPE BLOCK FRONTAGE AND REQUIRES A MINIMUM 15% TRANSPARENCY. SOUTH FACADE TOTAL FACADE:2,969 S.F. TOTAL TRANS.:286 S.F. PERCENT TRANS.:10% WEST FACADE TOTAL FACADE:1,002 S.F. TOTAL TRANS.:155 S.F. PERCENT TRANS.:15% STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2025 625 SOUTH 19TH STREET BOZEMAN, MONTANA07/07/2025 TH TH 19-076 CITY REVIEW A301THE PINES APARTMENTSPHASE IIEXTERIOR ELEVATIONS 1/4" = 1'-0"A301 1 SOUTH ELEVATION REVISION SCHEDULENO: DESCRIPTION: DATE: BY:1 COB REVISIONS 06/14/24 AS