INTRODUCTION
The Pines Site Plan Phase II project proposes the development of Tract 2A, Amended Kirk
Subdivision within the City of Bozeman. It is proposed that the site will have a single building
with 12 units located along the northern property line with a paved parking area and trash
enclosure. As shown on the Drainage Area Map found in Appendix A, a combination of site
grading, sheet flow, & drywells will be utilized in managing the post-development stormwater
runoff.
The proposed dry well was designed using a 10-year, 2-hour storm event, and was checked against
the half-inch requirement according to the City Design Standards. The calculations and volumes
used in the design approach can be found in Appendix B following this report. A Geotechnical
report for the site is included in Appendix C.
DRAINAGE DESIGN
The proposed development of this site will result in hardscape on 69% of the .44 acres. The runoff
generated from the parking lot, building, and surrounding sidewalk. The runoff will flow into one
of 2 storm inlets and be collected in the proposed drywell. A 10-year 2-hr storm on this site will
generate 920 ft3 of runoff. The proposed drywell was designed to retain 945 ft3.
GROUNDWATER
A geotechnical report was prepared for Tract 1A, the report stated that no groundwater was
encountered in the soil investigation. The test pits excavated down to 7.5 ft and the proposed
drywell is sized to go no deeper than 7.5 ft bgs. The geotechnical report is attached in Appendix
C.
APPENDIX A
DRAINAGE AREA MAP
APPENDIX B
DRAINAGE AREA AND
RETENTION SYSTEM CALCULATIONS
DRAINAGE AREA # 1
DRY WELL #1
1. Calculate Area and Weighted C Factor
Contributing Area DA # C Area (ft
2) C * Area
Hardscape 1 0.95 13080 12426
Landscape 1 0.20 6086 1217
Total 19166 13643
A = Area (acres) 0.44
C = Weighted C Factor 0.71
2. Calculate Required Volume
Q = CIA
V=7200Q
C = Weighted C Factor 0.71
I = intensity (in/hr) 0.41 (10 yr, 2hr storm)
A = Area (acres) 0.44
Q = runoff (cfs) 0.13
V = REQUIRED VOL (ft3)920
REQUIRED VOLUME (1/2" runoff per DSSP II.A.4)
1. Determine Area of Hardscape within Drainage Area #1
Contributing Area Area (ft
2 )
Hardscape 13080
2. Calculate 1/2" runoff volume over hardscape
(aka Runoff Reduction Volume [RRV] as calculated in Montana Post-
Construction Storwater BMP Manual - Equation 3-1)
RRV = [P*Rv*A]/12
P = Water quality rainfall depth 0.50 inches
Rv = Dimensionless runoff coefficient 0.66 0.05 + 0.9*I
I = Percent impervious cover (decimal) 0.68 decimal
A = Entire drainage area 0.44 acres
RRV = Runoff Reduction Volume 0.012 acre-ft
RRV = Runoff Reduction Volume 530 cubic feet
Because the runoff volume from the 10-yr, 2-hr storm (for flood control) is greater than the
runoff volume produced by the half inch rainfall (for water quality) the proposed Dry
Well #1 is sized to handle the larger volume (920 cf).
1. Calculate Drywell Volume
Existing Soil Condition GP poorly graded gravel
Percolation Rate (min/in) 2.6 (see Circular DEQ 8,
Percolation Rate (ft/hr) 0.217 Appendix C)
Porous Media in Drywell Washed Rock
Void Ratio of Media 40.00%
Media Offset Dist. From Drywell (ft) 7.5
Infiltration
Drywell Media Area (ft2)303.6
Infilitration Volume (ft3)132 perc rate x media area x 2 hours
Media Void Volume
Media Bed Depth (below MH) 1.50
Media Volume (ft2)2174.43
Media Storage Volume (ft2 870
Manhole Volume
Manhole Volume (ft3)75
Proposed Manhole Depth (ft) 6 (round up to nearest 3")
Provided Storage Volume (ft3)945
Provided Volume Inc. Perc. (ft3)1,077
Design Storm Infiltration Time (hrs)14
APPENDIX C
GEOTECHNICAL REPORT
3528 Fieldstone Dr. Bozeman, MT 59715 (406)-582-4406
March 20, 2013
LMF Group
3506 Fieldstone Dr. W.
Bozeman Montana 59715
RE: Geotechnical Report –Proposed Pines Apartments, Bozeman, MT
Dear LMF Group:
A geotechnical investigation has been completed at the site of the proposed apartments. The
purpose of the investigation is to assess subsurface soil and groundwater conditions and provide
pertinent geotechnical recommendations for design of the foundation elements and pavements.
This report presents the findings and recommendations.
Project Background
The proposed project is located on Tract 1A of Amended Subdivision Plat F-1-D, Gallatin County
Montana as shown on Attachment A, Figure 1. The proposed apartment building will consist of a
two story, wood framed structure. The building foundations will consist of a slab on grade with
perimeter wall footings bearing a minimum of 3.5 feet below grade. Anticipated wall loads could
range from 1500 to 3000 plf. Concentrated floor loads likely will not exceed 750 pounds. The
footprint of the proposed building is approximately 125 feet by 40 feet (+/-5,000 square feet). If
building loads differ from these assumptions we should be contacted to allow review and
adjustment of the recommendations if deemed necessary.
Existing Conditions
The building site consists of a grassed lawn area. The site is located on essentially flat laying
ground. An existing wooden storage shed is located on the southwestern edge of the site. The
site slopes gently to the northwest.
The Pines Apartments- Geotechnical Investigation
Page 2 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
Field Work
The surface and subsurface conditions were studied during a field investigation on March 5, 2013.
The field investigation consisted of visual reconnaissance of the site and excavation of three (3)
test pits. The test pits were excavated at the approximate locations shown on Figure 1 of
Attachment A. Locations of the test pits were determined by pacing from existing features. A
Zaxis 120 excavator was utilized to excavate the test pits to depths ranging from 6 to 7.5 feet.
Mr. Greg Underhill, PE, Geotechnical Engineer observed the excavations, obtained soil samples,
and visually classified the soils according to ASTM D 2488. Summary logs of the test pits were
recorded during excavation and are included in Attachment B. Elevations shown on the test pits
area approximate.
The stratigraphic contacts shown on the individual test pit logs represent the approximate
boundaries between soil types. The actual transitions may be more gradual or abrupt. The soil
and groundwater conditions depicted are only for the specific dates and locations reported, and
therefore, are not necessarily representative of other locations and times.
Findings
Soil Profiles and Characteristics
The soil profiles encountered in the test pits were relatively consistent throughout the site. In
general, the test pit profiles consisted of a layer of dark brown topsoil (OL) overlying stiff to
medium stiff, medium to light brown lean clay (CL). The clay layer is underlain by poorly graded
gravel with sand and cobbles (GP). Topsoil varied in thickness from 10 to approximatly15 inches.
The lean clay deposits ranged in thickness from approximately 0.5 to 2.8 feet. Depth to the gravel
layer ranged from 1.5 in the northwest corner to approximately 3 feet in the northeast corner.
Logs of the test pits are presented in Attachment B. Photographs of the test pits are presented in
Attachment C.
Following is a description of the soils encountered in the test pits.
Topsoil and organic matter:
The Pines Apartments- Geotechnical Investigation
Page 3 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
This material consisted of organic lean clay (OL) with abundant roots. Larger diameter
tree roots were encountered Test Pit 3 which was located in the northwest corner of the
site. The topsoil material is considered unsuitable for support of foundation elements or
concrete floor slabs.
Lean Clay (CL)
Lean clay (CL) was present beneath the topsoil throughout the entire site. In general, the
clay layer was slightly moist to moist and medium stiff in consistency. The clay is
considered suitable for support of the interior slab–on-grade floor provided is it properly
prepared (see interior floor slab). Interior footings should be placed on the native gravles
or structural fill placed on the native gravels. The clay is moisture sensitive and could
become unworkable during times of wet weather.
Poorly graded gravel with sand and cobbles (GP):
Poorly graded gravel with sand and cobbles (GP) was present beneath the lean clay layer
in all of the test pits. The gravel layer was generally medium dense and slightly moist.
The gravel horizon was relatively homogeneous, both vertically and horizontally, with
some variances in the maximum cobble size. The gravel deposits exhibit high bearing
strength and low compressibility. These materials will provide suitable bearing support for
foundation elements.
Groundwater
Groundwater was not encountered in any of the test pits excavated for this investigation.
Groundwater levels and soil moisture may vary according to season, irrigation practices, and
change in land use.
Foundation Recommendations
All footings should be placed on the native gravel deposits or structural fill. The lean clay is
suitable for support of interior concrete slabs provided moisture conditions are suitable to allow
proper compaction. The clay is moisture sensitive and could become unworkable during times of
inclimate weather. If this is the case, the wet clay would have to be removed to dryer clay that
The Pines Apartments- Geotechnical Investigation
Page 4 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
would allow proper compaction or down to the native gravel. Structural fill could then be placed to
final floor subgrade.
Footing subgrades should be evaluated during excavation and prior to placement of concrete to
ensure all footings bear on native gravel or structural fill if needed. Extra care should be taken not
to disturb the native gravel soils at the bottom of the footing excavations. A flat bar should be
placed across the excavator bucket teeth or smooth edge excavator bucket utilized to prevent
disturbance of the gravel at footing subgrade from ripping action by the excavator teeth. Footing
subgrades should be proof rolled and compacted with a minimum of 4 passes with a vibratory
compactor. Soft or unsuitable material should be removed to competent gravel and replaced with
structural fill. Soil conditions should be confirmed at the time of construction to ensure conditions
are not significantly different than those assumed for this report. Mr. Underhill should be
contacted if conditions vary so revisions can be made on these recommendations, if deemed
necessary.
Allowable Bearing Pressure (footings placed on structural fill)
The proposed apartment building may be supported on conventional spread footings bearing on
native gravel or structural fill placed on the native gravel compacted as specified (see Structural
fill placement considerations). Footings placed in this manner may be designed utilizing a net
allowable bearing pressure of 2,500 pounds per square foot. Total settlement for footings
designed and placed in this manner is estimated to be less than one inch with minor differential
settlements.
Wall footings should be a minimum of 16 inches in width and isolated column footings should
have minimum dimensions of 24 inches.
Footings should be placed a minimum of 3.5 feet below the final exterior finished grade surface
for frost considerations.
Lateral Load Resistance
It is assumed that the foundation backfill material will be either lean clay or gravel.
The Pines Apartments- Geotechnical Investigation
Page 5 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
For resistance to lateral load, the following values may be utilized:
At Rest (lean clay or gravel). ..................................................................................................... 55 psf/ft*
Active (lean clay or gravel). ...................................................................................................... 40 psf/ft*
Passive (lean clay or gravel ) .................................................................................................. 250 psf/ft**
Coefficient of friction between concrete and gravel, = 0.45
*These recommendations are based on the assumption of no hydrostatic pressures and horizontal back slope.
** Assuming no hydrostatic pressure and horizontal backfill and neglecting the first foot of backfill depth and gravel
backfill is compacted as specified in following the sections.
Seismic design in accordance with IBC procedures should be based on assuming site class “D”
conditions (stiff soil profile).
Structural fill placement considerations
If structural fill is required under footings the structural fill limits should extend a minimum of 1
foot beyond the footing edge for each foot of depth below the footing. For example the total
excavation width for a two foot wide footing one foot above the gravel layer would be 4 feet.
Care should be taken not to disturb the native gravel subgrade. After removal of the clay,
structural fill may then be placed to footing subgrade. Structural fill should be compacted to not
less than 95 percent of maximum dry density at plus or minus 2 percentage points of optimum
moisture content in accordance to ASTM D 698. For a material that does not exhibit a well-
defined moisture density curve, 75 percent of relative density according to ASTM D 4253 or D
4254 is required.
If structural fill is needed the native onsite gravel or the following granular materials may be
utilized for structural fill: ¾ inch minus washed crushed gravel, standard ¾ -inch minus road mix
or sandy gravel meeting the following gradation:
e Pines Apartments
Recommended Structural Fill Gradation
Sieve Size Percent Passing by Dry Weight
4-inch 100
No. 4 30-70
No. 200 0-10
Liquid limit less than 25% and Plasticity Less than 6
The Pines Apartments- Geotechnical Investigation
Page 6 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
Other granular materials may be acceptable but should be evaluated and approved by the
geotechnical engineer.
Quality control is essential during fill placement. Frequent compaction testing and consistent
placement procedures with properly sized compaction equipment are required to produce a
consistent and unyielding subgrade for successful support of the structural elements.
Allowable temporary excavation slopes
All temporary excavations must conform to OSHA Standards for Excavations, 29 CFR Part
1926.652 Appendix B to Subpart P. Gravel soils or soils below the groundwater table would be
classified as type C soils. Type C soils require excavation slope angles not exceed 1.5H:1V
(Horizontal to Vertical) or be shored. Temporary shoring (sheet piling) may be required if
excavation limits impinge on adjacent infrastructure elements. The nature and extent of
subsurface variations and groundwater conditions between test pit locations may not become
evident until construction. Soil conditions should be evaluated at the time of construction by the
contractor’s responsible person to ensure compliance to OSHA requirements. The stability of the
construction excavations and associated worker safety is the responsibility of the contractor.
Interior concrete floor slabs
Subgrade for interior slabs should consist of properly compacted native clay or structural fill. A
minimum of 4-inches of 3/4inch minus washed crushed base gravel is recommended between the
either the clay or structural fill and concrete floor slab. Prior to placement of the base gravel the
clay or structural fill subgrade should be moisture conditioned and compacted to 95 percent of
maximum dry density at plus or minus 2 percent of optimum moisture in accordance to ASTM D
698. For structural design of interior concrete slabs-on-grade placed in this manner a modulus of
subgrade reaction of 200 pci may be used. All concrete slab subgrades soil should be evaluated
during construction by proof-rolling with heavy equipment and compacting as specified.
Pavements
The Pines Apartments- Geotechnical Investigation
Page 7 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
Paved areas immediately adjacent to the building will consist of parking and parking access from
South 20th Avenue. Vehicle usage will be predominately automobiles and light trucks with
occasional city sanitation trucks. Dependent upon site grading and removal of topsoil and
organics the soils at subgrade elevation are anticipated to consist of lean clay. The following
pavement section is recommended.
The Pines Recommended Flexible Pavement Thicknesses
MATERIAL THICKNESS (inches)
Parking Areas and Access Lanes
Hot Plant mix bituminous surface (MPWSS Type) 3
Crushed base (MPWSS 3/4" or 1-1/2” minus) 8
The commonly used standard specification for private sector projects in Montana is the Montana
Public Works Standard Specifications (MPWSS), Sixth Edition, April 2010. It is recommended
that gravel base courses meet the requirements of MPWSS Sections 02335 and 02234. Section
02510 should be referenced regarding specifications for Asphalt Concrete Pavement.
Prior to pavement section placement, topsoil and organics should be stripped and the existing
subgrade scarified to a depth of at least eight inches and compacted to not less than 95 percent of
maximum dry density at optimum moisture content according to ASTM D 698. It is noted that
fill, debris or other unsuitable subgrade may be encountered at some locations. These areas
should be sub-excavated to a depth of 1 foot or to suitable native gravel and replaced with
compacted granular fill.
The gravel base material should be compacted to not less than 95 percent of maximum dry density
at plus or minus 2 percent of optimum moisture content according to ASTM D 698 or ASSHTO
T99.
Landscape and Irrigation Considerations
Surface grading should provide positive flow away from all structures. Landscaped areas, within
10 feet of foundations, should provide a minimum 5 percent slope away from the building. All
roof down spouts should have extensions and/or splash guards that will route storm water away
from the structure foundation areas.
The Pines Apartments- Geotechnical Investigation
Page 8 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
Earthwork
Site preparation should consist of stripping the existing vegetation and loose surficial materials
from the areas beneath any footing, floor slab or pavement area. All exposed surfaces should be
free from mounds and depressions, which could prevent uniform compaction. If unexpected fills
or obstructions are encountered during site clearing, such features should be removed and the
excavation thoroughly cleaned prior to backfill placement and/or construction. Fill, footings, or
pavement should not be placed on frozen subgrade.
Excavation:
Based on the materials encountered in the test pits, the site soils may be excavated with
conventional earthmoving equipment.
Backfill placement under concrete slabs, pavement, and walkways:
Prior to granular fill placement under pavement or concrete slab locations, the subgrade
should be scarified to a depth of six inches and compacted to 95 percent of maximum dry
density at plus or minus 2 percentage points of optimum moisture content according to
ASTM D 698 (Standard Proctor). Soft areas should be over-excavated and replaced with
structural fill.
General oversite fills:
Not less than 90 percent of maximum dry density at optimum moisture content according
to ASTM D 698 (Standard Proctor).
Fill should be placed and compacted in horizontal lifts, using equipment and procedures that will
produce recommended moisture contents and densities throughout the lift. Uncompacted fill lifts
should not exceed 10 inches in thickness.
Quality control is essential during fill placement. Frequent compaction testing and consistent
placement procedures with properly sized compaction equipment are required. If density tests
indicate compaction is not being achieved, the fill should be scarified, conditioned to near
optimum moisture content, re-compacted, and re-tested. Fill should not be placed in a frozen state
or upon frozen subgrade.
The Pines Apartments- Geotechnical Investigation
Page 9 of 9
H:\31\BD 31 (2013)\The Pines\The Pines Geotechnical Report.doc
Limitations
The conclusions and recommendations presented in this report assume that site conditions are not
substantially different than those exposed by the explorations. If during construction, subsurface
conditions are observed or appear to differ from those encountered in the explorations, Mr.
Underhill should be advised at once so that these conditions can be reviewed and recommendation
can be is considered necessary.
If there is a substantial lapse of time between submission of this report and the start of work at the
site, and conditions have changed due to natural causes or construction operations at or near the
site, it is recommended that this report be reviewed to determine the applicability of the
conclusions and recommendations considering the changed conditions.
The report was prepared for the use of the Owner and Architect in the preliminary planning of the
site. It should be made available to prospective contractors for information on factual data only
and not as a warranty of subsurface conditions.
Any conclusions by a construction contractor or bidder relating to construction means, methods,
techniques, sequences, or costs based upon the information provided in this report are not the
responsibility of the Owner or Mr. Underhill. The contractors and bidders are encouraged to
perform additional investigations necessary to develop subsurface data for construction purposes.
If you have any further questions, please do not hesitate to call at 406-539-3707.
Sincerely,
__
Greg Underhill P.E.
Senior Geotechnical Engineer
Attachments
ATTACHMENT A
THE PINES APARTMENTS
FIGURES
S.19THAVE.
S.20THAVE.
S.19THAVE.
S.20THAVE.
TEST PIT LOCATIONS
SITE PLAN - GEOTECHNICALFI
G-1THE PINES
BOZEMAN, MONTANA
ATTACHMENT B
THE PINES APARTMENTS
TEST PIT LOGS
0
1.5
3
4.5
6
7.5
9
10.5
4834.5
4833
4831.5
4830
10" +/- Topsoil, moist, medium stiff, black,
organics
0.8 4834.1Lean Clay, CL; moist, medium stiff,
medium to light brown (root zone
transition)
2.3 4832.6Poorly Graded Gravel with sand and
cobbles, GP; slightly moist, medium
dense, medium to light brown
6.0 4828.9Test Pit terminated at 6.0 feet
No groundwater observed
Project No.: 31.0000
LOG OF TEST PIT TP-1
CLIENT
LMF Group
PROJECT
The Pines Apartments
TEST PIT LOCATION
South Center Edge of Building
SITE
Bozeman, MT
DOWL HKM
920 Technology Blvd., Suite A
Bozeman, Montana 59718
Telephone: (406) 586-8834
Fax: (406) 586-1730
STARTED 3/5/13 FINISHED 3/5/13
CONTRACTOR EXCAVATOR Zaxis 120 Ex
OPERATOR MODEL
LOGGED BY G. Underhill APPROVED BY G. UnderhillDEPTH(FT.)MATERIAL DESCRIPTION
GRAPHICLOGELEVATION(FT.)BULK/GRABSAMPLES
POCKETPENE-TROMETER,TSF10 20 30 40
PL LL
ADDITIONALDATA/REMARKS
Surface Elevation: 4834.9
M.C.
Sheet 1 of 1
0
1.5
3
4.5
6
7.5
9
10.5
4834.5
4833
4831.5
4830
4828.5
14" +/- Topsoil, moist, medium stiff, black,
organics
1.2 4834.3Lean Clay, CL; moist, medium stiff,
medium to light brown
3.1 4832.4Poorly Graded Gravel with sand and
cobbles, GP; slightly moist, medium
dense, medium to light brown
7.0 4828.5Test Pit terminated at 7.0 feet
No groundwater observed
Project No.: 31.0000
LOG OF TEST PIT TP-2
CLIENT
LMF Group
PROJECT
The Pines Apartments
TEST PIT LOCATION
Northeast Corner of Building
SITE
Bozeman, MT
DOWL HKM
920 Technology Blvd., Suite A
Bozeman, Montana 59718
Telephone: (406) 586-8834
Fax: (406) 586-1730
STARTED 3/5/13 FINISHED 3/5/13
CONTRACTOR EXCAVATORZaxis 120 Excavator
OPERATOR MODEL
LOGGED BY G. Underhill APPROVED BY G. UnderhillDEPTH(FT.)MATERIAL DESCRIPTION
GRAPHICLOGELEVATION(FT.)BULK/GRABSAMPLES
POCKETPENE-TROMETER,TSF10 20 30 40
PL LL
ADDITIONALDATA/REMARKS
Surface Elevation: 4835.5
M.C.
Sheet 1 of 1
0
1.5
3
4.5
6
7.5
9
10.5
4833
4831.5
4830
4828.5
4827
12" +/- Topsoil, moist, medium stiff, black,
organics
1.0 4833Lean Clay, CL; sligthly moist, medium stiff
to stiff, medium to light brown abundant
roots to 1.9'
1.9 4832.1Poorly Graded Gravel with sand and
cobbles, GP; slightly moist, medium
dense, medium to light brown, cobble size
predominately 3" to 6"with occasional 8"
7.5 4826.5Test Pit terminated at 7.5 feet
No groundwater observed
Project No.: 31.0000
LOG OF TEST PIT TP-3
CLIENT
LMF Group
PROJECT
The Pines Apartments
TEST PIT LOCATION
Northwest Corner of Building
SITE
Bozeman, MT
DOWL HKM
920 Technology Blvd., Suite A
Bozeman, Montana 59718
Telephone: (406) 586-8834
Fax: (406) 586-1730
STARTED 3/5/13 FINISHED 3/5/13
CONTRACTOR EXCAVATORZaxis 120 Excavator
OPERATOR MODEL
LOGGED BY G. Underhill APPROVED BY G. UnderhillDEPTH(FT.)MATERIAL DESCRIPTION
GRAPHICLOGELEVATION(FT.)BULK/GRABSAMPLES
POCKETPENE-TROMETER,TSF10 20 30 40
PL LL
ADDITIONALDATA/REMARKS
Surface Elevation: 4834.0
M.C.
Sheet 1 of 1
ATTACHMENT C
THE PINES APARTMENTS
TEST PIT PHOTOGRAPHS
The Pines Test Pit Photos
Page 1
Test Pit-1 Excavated Gravel
Test Pit-1 Excavation .
The Pines Test Pit Photos
Page 2
Test Pit-2 Excavated Gravel
Test Pit-2 Excavation
The Pines Test Pit Photos
Page 3
Test Pit-3 Excavated Gravel
Test Pit-3 Excavation