Loading...
HomeMy WebLinkAbout038 E 1.4 GALLOWAY LIGHTING PLAN (CONT.)0.30.30.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.50.50.60.60.60.60.60.70.70.70.70.70.70.60.60.50.50.50.40.40.50.60.70.70.80.90.90.90.90.90.90.90.90.80.70.70.60.50.50.50.60.60.70.91.01.01.11.21.21.21.21.11.00.90.80.70.60.60.50.50.60.70.81.01.11.21.41.51.51.51.51.31.21.10.90.80.70.60.50.40.50.70.91.11.31.51.71.91.91.91.81.61.41.21.00.80.60.50.40.40.50.60.81.01.31.51.82.02.12.11.91.71.41.20.90.70.60.50.40.30.50.60.81.11.31.61.51.21.00.70.50.40.30.30.40.50.70.91.20.80.60.40.30.30.40.50.60.70.30.2LUMINAIRE SCHEDULELUMINAIREQTYARRANGEMENTDESCRIPTIONARRANGEMENTWATTS1SingleRFS-45W16LED3K-G2-R2S-UNV-DMG-FAWS-PH9-RCD7-GY345.11MOUNTING HEIGHT(FT)30.0'DUNITS(Fc)AVERAGE0.82MAX2.1MIN0.2AVG/MIN4.10CALCULATION SUMMARY0'10'20'30'E1.4AS NOTEDGALLOWAY LIGHTINGPLAN (CONT.)CKHEC Apr 04, 2025 - 2:18pmCAD FILE: M:\213601\Drawings\Lighting\1 - LIGHTING PLAN.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC161 W. Haley SpringsBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018DAVIS LANE BOZEMAN MT04/03/2025213601COB SITE PLAN - 22x34 ORIGINALSSCALESHEET TITLEDESIGN BY6590 DAVIS LANEBOZEMAN, MT, 59718PROPERTYRoad STE. 101LUMINAIRE: D0.7 FOOT CANDLE CONTOUR0.6 FOOT CANDLE CONTOUR0.5 FOOT CANDLE CONTOUR0.4 FOOT CANDLE CONTOUR0.3 FOOT CANDLE CONTOURLEGENDPROPOSED LIGHTINGCONTROL CENTERAND METER PEDESTALPROPOSED LOCATION OFELECTRICAL CONDUITGALLOWAY STREET