Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
037 E 1.3 GALLOWAY LIGHTING PLAN (CONT.)
0.30.30.30.30.30.30.30.30.30.40.30.30.30.30.30.30.30.30.30.40.40.40.50.50.50.50.50.50.60.60.60.50.50.50.50.50.50.40.40.40.50.50.60.60.70.80.80.80.80.80.80.80.80.80.70.60.60.50.50.40.50.60.60.70.80.91.01.11.11.11.11.11.00.90.80.70.70.60.50.40.50.60.70.81.01.11.21.31.41.41.41.31.21.11.00.80.70.60.50.40.50.60.70.91.11.31.41.61.71.81.81.61.41.31.10.90.70.60.50.30.40.50.70.91.11.31.61.82.02.12.01.91.61.41.20.90.70.60.50.30.40.60.71.01.21.51.81.81.51.31.00.80.60.50.40.30.40.50.70.91.11.41.21.00.70.60.40.30.20.30.40.50.70.60.40.30.10.10.20.20.30.2LUMINAIRE SCHEDULELUMINAIREQTYARRANGEMENTDESCRIPTIONARRANGEMENTWATTS1SingleRFS-45W16LED3K-G2-R2S-UNV-DMG-FAWS-PH9-RCD7-GY345.11MOUNTING HEIGHT(FT)30.0'CUNITS(Fc)AVERAGE0.76MAX2.1MIN0.1AVG/MIN7.60CALCULATION SUMMARY0'10'20'30'E1.3AS NOTEDGALLOWAY LIGHTINGPLAN (CONT.)CKHEC Apr 04, 2025 - 2:18pmCAD FILE: M:\213601\Drawings\Lighting\1 - LIGHTING PLAN.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC161 W. Haley SpringsBozeman, MT 59715Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018DAVIS LANE BOZEMAN MT04/03/2025213601COB SITE PLAN - 22x34 ORIGINALSSCALESHEET TITLEDESIGN BY6590 DAVIS LANEBOZEMAN, MT, 59718PROPERTYRoad STE. 101LUMINAIRE: C0.7 FOOT CANDLE CONTOUR0.6 FOOT CANDLE CONTOUR0.5 FOOT CANDLE CONTOUR0.4 FOOT CANDLE CONTOUR0.3 FOOT CANDLE CONTOURLEGENDPROPOSED LIGHTING CONTROLCENTER AND METER PEDESTALPROPOSED LOCATION OFELECTRICAL CONDUITGALLOWAY STREET