Loading...
HomeMy WebLinkAbout003.1 CONSTRUCTION ROUTE MAP8''S8''W8''WSTIRR ST8''W0'300'600'900'JUNE 2024CONSTRUCTION TRAFFIC6590 DAVIS LANE Jun 18, 2024 - 4:05pmCAD FILE: M:\213601\Drawings\Figures\construction traffic.dwg 1 OF1PROJECT LOCATION1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 7TH EDITION DATED APRIL 2021 (MPWSS); THE CITY OF BOZEMANMODIFICATIONS TO THE MPWSS; AND THE PROJECT SPECIFICATIONS.2.CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL REGULATIONS (OSHA) SAFETY STANDARDS. IF REQUESTED BY THE INSPECTOR, THE CONTRACTOR SHALL PROVIDE PROOF OF A PERMIT FROMSAID DIVISION.3.THE CONTRACTOR'S OPERATIONS SHALL BE CONFINED WITHIN THE PROJECT LIMITS. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE PROJECT SITE WHERE APPROVED BY THE OWNER. IT SHALL BE UNDERSTOODTHAT THE RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF EQUIPMENT AND MATERIALS ON OR NEAR THE SITE WILL BE ENTIRELY THAT OF THE CONTRACTOR AND THAT NO CLAIM SHALL BE MADE AGAINST THEOWNER BY REASON OF ANY ACT OF AN EMPLOYEE OR TRESPASSER.4.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE CITY, COUNTY, AND/OR STATE INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN ADVANCE OF SPECIFIC INSPECTION NEEDS DURINGTHE COURSE OF THE WORK. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AND SUBJECT TO THE AVAILABILITY OF AN INSPECTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR WILL BEBILLED FOR SAID INSPECTION SERVICES AS PROVIDED IN THE MOST RECENTLY ADOPTED FEES FOR SUCH SERVICES.5.THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN A MANNER TO MINIMIZE INCONVENIENCE TO THE ADJACENT BUSINESSES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS, ALL COSTS FOR PROTECTING, REMOVING, AND RESTORINGEXISTING IMPROVEMENTS SHALL BE BORNE SOLELY BY THE CONTRACTOR.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE,LOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS-OF-WAY AND MAKE SURE STREETS ANDWALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.9.CONSTRUCTION WORK ZONE TRAFFIC SIGNS SHALL BE FURNISHED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THE REGULATORY AGENCIES HAVING JURISDICTION. A TRAFFICCONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY BE REQUIRED BY THE CITY OF STATE. "CONSTRUCTION AHEAD" WARNING SIGNS ARE TO BE INSTALLED ALONG ADJACENT ROADS OR DRIVEWAYS, FLASHERS WITHCAUTION TAPE ARE TO BE INSTALLED WHERE ANY CONSTRUCTION ACTIVITY CROSSES A SIDEWALK OR PEDESTRIAN PATH IN ACCORDANCE WITH THE SPECIFICATIONS AND ANY OR ALL LOCAL REGULATIONS.10.NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC STREETS/ROADS, RIGHT-OF-WAY, OR ANY DRIVEWAY IS ALLOWED.11.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT THERE IS A CONSTRUCTION PERMIT APPROVED BY THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) OR LOCAL GOVERNING AGENCY AS APPROPRIATEFOR THE CONTROL OF STORM WATER RUNOFF. IF THERE IS NOT AN APPROVED PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY APPROVALS FROM MDEQ OR THE LOCAL GOVERNINGAGENCY.12.CONTRACTOR IS RESPONSIBLE FOR PROJECT DUST CONTROL.GENERAL NOTESLEGENDCONSTRUCTION TRAFFIC - ENTERINGCONSTRUCTION TRAFFIC - EXITINGBAXTER LANEDAVIS LANE