HomeMy WebLinkAbout047_L1.2_SouthLandscapePlanMATCHLINE NORTH L1.1PREVIOUS WORK BY OTHERSPREVIOUS WORK BY OTHERSWATERCOURSE SETBACK PLANTING PLANTO BE PRODUCED IN SITE PLAN DEVELOPMENTSTREET TREES WILL BE REQUIREDBETWEEN CULTIVAR STREET ANDI-90 EVEN THOUGH THERE WILLNOT BE A TYPICAL BOULEVARD SPACETHE REQUIRED STREET TREES BETWEENCULTIVAR STREET AND I-90 SHALLBE PLANTED DURING THE TIMEOF ROAD CONSTRUCTIONPHASE 2 BOUNDARY2L1.2STREET SECTION 2CULTIVAR STREETINTERSTATE 90MAXIMUM WATERCOURSE SETBACKMATCHLINEPHASE 3 BOUNDARYPHASE 2 BOUNDARYMAXIMUM WATERCOURSESETBACK BOUNDARY100-YR CONSERVATIVEFLOODPLAIN BOUNDARYPHASE 1 BOUNDARYSYMBOLCODEBOTANICAL / COMMON NAMESIZEDRGHT. TOL.CONTR.QTYTREESSTSTREET TREES2" CALYESB&B178SYMBOLCODEBOTANICAL / COMMON NAMECONTQTYGROUND COVERSNSNATIVE SEED MIXSQFT132,163 SFSITEWPWATERCOURSE SET BACK PLANTINGSSQFT89,204 SFPRELIMINARY - FOR REVIEW
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
PARCEL TRACT 1-B, PARCEL 2, STATE OF MONTANA TRACT
SOUTHERN LANDSCAPE PLAN
NORTH PARK-WEST
INFRASTRUCTURE MASTER SITE PLAN
BOZEMAN, MTL1.2RE
21349_03_LS_PROD.DWG
DE/NH
--
-
-
-
-
-
-
-
-
-
-
-
-
--
21349.030150SCALE: 1" = 150'30075150UULCSOUTHERN LANDSCAPE PLAN LE*EN'&ON&EPT8AL PLANT LE*EN'10'10'CONCRETESIDEWALKBOULEVARDSTREETBOULEVARDASPHALTPATHAMENDED SOIL FORTREE PLANTINGCURB AND GUTTERSTREET SECTION 1N.T.S.16'-6"35'16'-6"NATIVE GRASS IN BOULEVARDS1BOULEVARDRESTORATIVESEEDINGSTREET SECTION 2N.T.S.10'STREETBOULEVARDASPHALTPATHAMENDED SOIL FORTREE PLANTINGCURB AND GUTTER16'-6"35'16'-6"NATIVE GRASS IN BOULEVARDS2P:\21349_03_North_Park_Westside_MSP_TO_#3\CADD_C3D\PRODUCTION_DWG\21349_03_LS_PROD.dwg, L1.2 SOUTHERN LANDSCAPE PLAN, 7/2/2025 10:24:56 AM, Asmith, 1:1
7/02/2025