HomeMy WebLinkAbout046_L1.1_NorthLandscapePlanMATCHLINE SOUTH L1.2PREVIOUS WORK BY OTHERSWATERCOURSE SETBACK PLANTING PLANTO BE PRODUCED IN SITE PLAN DEVELOPMENTNO TREE PLANTINGS INPHILLIPS-66 R.O.WSITE VISION TRIANGLESTREET FRONTAGE LANDSCAPINGWILL BE REQUIRED IN BOULEVARDAREAS AT THE TIMEOF SITE DEVELOPMENTPHASE 2 BOUNDARY1L1.2STREET SECTION 1CULTIVAR STREETINTERSTATE 90WHEAT DRIVETHE REQUIRED STREET TREESBETWEEN CULTIVAR STREET AND I-90SHALL BE PLANTED DURING THETIME OF ROAD CONSTRUCTIONSEEDING TO EXTEND TO THE EXTENTOF ALL DISTURBED AREAS FROMGRADING AND ROAD CONSTRUCTION.ALL DISTURBED AREAS ANDEXTENTS OF GRADING TO BERESEEDED WITH NATIVE SEED MIXMAXIMUM WATERCOURSE SETBACKMATCHLINEPHASE 3 BOUNDARYPHASE 2 BOUNDARYMAXIMUM WATERCOURSESETBACK BOUNDARY100-YR CONSERVATIVEFLOODPLAIN BOUNDARYPHASE 1 BOUNDARYSYMBOLCODEBOTANICAL / COMMON NAMESIZEDRGHT. TOL.CONTR.QTYTREESSTSTREET TREES2" CALYESB&B178SYMBOLCODEBOTANICAL / COMMON NAMECONTQTYGROUND COVERSNSNATIVE SEED MIXSQFT132,163 SFSITEWPWATERCOURSE SET BACK PLANTINGSSQFT89,204 SFPRELIMINARY - FOR REVIEW
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
PARCEL TRACT 1-B, PARCEL 2, STATE OF MONTANA TRACT
NORTHERN LANSCAPE PLAN
NORTH PARK-WEST
INFRASTRUCTURE MASTER SITE PLAN
BOZEMAN, MTL1.1RE
21349_03_LS_PROD.DWG
DE/NH
--
-
-
-
-
-
-
-
-
-
-
-
-
--
21349.030150SCALE: 1" = 150'30075150UULCNORTHERN LANSCAPE PLAN MASTER SITE PLAN NOTES1.ALL TREES PLANTED WITHIN THE BOULEVARD SHALL BE PLANTED IN A MIN DEPTH OF 18" OF TOPSOIL AND MINIMUM WIDTH OF TOPSOILOF 24" O.C.2.ALL TREES IN BOULEVARDS TO BE PLANTED 10' O.C. FROM ALL UTILITIES.3.ALL TREES IN BOULEVARD TO BE IRRIGATED WITH DRIP RING. MAINLINE AND P.O.C TO BE DETERMINED.4.A FULLY STAMPED IRRIGATION PLAN WILL BE REQUIRED PRIOR TO ANY INSTALL OF PLANT MATERIAL.5.ALL BOULEVARDS TO BE SEEDED FROM EDGE OF RIGHT AWAY TO EDGE OF SIDEWALK.6.ALL STREET TREES TO BE STAKED WITH WOODEN TREE STAKES AND TIED OFF WITH STEEL GUY WIRE AND FABRIC TREE STRAP.7.ALL TREES IN BOULEVARD TO BE PLANTED WITH MULCH RING 6" WIDER THAN ROOT BALL AND 4" DEEP.GENERAL NOTES1.THE CONTRACTOR SHALL OBTAIN, AT THEIR OWN EXPENSE, APPLICABLE LICENSES, STANDARDS, PERMITS, ETC. WHICH ARE NECESSARY TOPERFORM THE WORK.2.THE CONTRACTOR SHALL LOCATE, CLEARLY MARK AND MAINTAIN EXISTING UTILITIES ON THE SITE PRIOR TO WORK START UP. CALL FORUTILITY LOCATES PRIOR TO COMMENCING WORK.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES AND REPAIR OF UTILITIES IF DAMAGED. REPAIR SHALLBE DONE AT NO ADDITIONAL COST TO THE OWNER4.PHASE LINES AS INDICATED ON THE PLANS.5.COORDINATE SITE ACCESS, STAGING, STORAGE AND CLEANOUT AREAS WITH OWNER'S REPRESENTATIVE.PLANTING NOTES1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES. GRAPHIC QUANTITIES TAKE PRECEDENCE OVER WRITTENQUANTITIES.2.ALL EXISTING GRASS STAND AREAS DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE SOIL PREPARED AND SEEDED BY THECONTRACTOR.3.ALL LANDSCAPE MATERIALS SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL PRACTICES AND AMERICAN NURSERYSTANDARDS IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT AND HEALTHY GROWTH.4.REPAIR AND RESEED STAGING AREA.5.CONTRACTOR SHALL COORDINATE IRRIGATION AND PLANTING WORK SUCH THAT INSTALLED IRRIGATION EQUIPMENT SHALL NOT CAUSEADJUSTMENT OF PLANTING LOCATIONS CONTRARY TO THE PLANS. IF IRRIGATION EQUIPMENT IS INSTALLED IN LOCATIONS OBSTRUCTINGTHE INTENDED LOCATIONS OF THE PLANTINGS, NOTIFY THE LANDSCAPE ARCHITECT FOR CLARIFICATION.6.THE CONTRACTOR SHALL WARRANTY ALL CONTRACTED WORK AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER SUBSTANTIALCOMPLETION HAS BEEN ISSUED BY THE OWNER'S REPRESENTATIVE FOR THE ENTIRE PROJECT UNLESS OTHERWISE SPECIFIED IN THECONTRACT DOCUMENTS OR SPECIFICATIONS.LEGENDRE48IREDPROVIDEDBOZEMAN DESIGNSTANDARDSBLOCK FRONTAGESTANDARDSSEC. 38.510.030 SUBSECTION HREDUCTIONS IN LANDSCAPING MAY BECONSIDERED FOR LOW VOLUME AND LOWVISIBILITY STREETS ENTIRELY WITHIN THEINDUSTRIAL ZONE. HIGHER DENSITY OFEMPLOYEES = STANDARD LANDSCAPING ANDPEDESTRIAN ACCESSTHE CITY WILL NOT SUPPORT ANYREDUCTIONS IN LANDSCAPING OR STREETTREES IN THIS AREA.STREET FRONTAGELANDSCAPINGACCEPTABLE LARGE CANOPY SHADE TREESFOR USE IN PUBLIC RIGHTS-OF-WAY ARETHOSE ACCEPTED BY THE FORESTRYDEPARTMENT. STREET TREES MUST MEETTHE ARBORICULTURAL SPECIFICATIONS ANDSTANDARDS OF CHAPTER 16, ARTICLE V,DIVISION 3. THE FORESTRY DEPARTMENT, INCOOPERATION WITH THE CITY TREEADVISORY BOARD, PUBLISHES A PAMPHLETLISTING ACCEPTABLE SPECIES AND PROPERPLANTING METHODS. PRIOR TO PLANTINGSTREET TREES, A PERMIT FROM THEFORESTRY DEPARTMENT IS REQUIRED.ALL TREES ARE CONCEPTUAL IN THIS DESIGNPHASE. SELECTED TREE SPECIES WILL MEETFORESTRY DEPARTMENT STANDARDS.STREET TREESSTREET TREES SPACED 50' OCSTREET TREES SPACED 50' OC (SOME AREASWITH ADJUSTED SPACING DUE TOCONFLICTS WITH UNDERGROUND UTILITIES)WATERCOURSE SETBACKSEC 38.410.100THE SETBACK MUST INCLUDE IMMEDIATELYADJACENT WETLANDS (I.E. FRINGE). THEBUFFER WIDTH MUST BE EXTENDED BY THEWIDTH OF THE THE WETLAND.BUFFER AREA PLANTING ZONES HAVE BEENDELINEATED BY EACH WATERCOURSE ANDWETLAND AREA. ZONE PLANTING PLAN WILLBE PRODUCED IN FUTURE DESIGN PHASES.&ON&EPT8AL PLANT LEGEND&ODE &OMPLIAN&EP:\21349_03_North_Park_Westside_MSP_TO_#3\CADD_C3D\PRODUCTION_DWG\21349_03_LS_PROD.dwg, L1.1 NORTHERN LANSCAPE PLAN, 7/2/2025 10:21:28 AM, Asmith, 1:1