HomeMy WebLinkAbout044_WR_RailExt_C5.1_Details PROFILE ELEVATION CL
TOP OF RAILS (TOR)
24.0'
2H 2H
iV�o Oo 2' Oo �1V
1 BALLAST 13.0' ACCESS ROAD
2H
2H C? C? C? 2.0% O 0 2.0
Ov0�0
SUB BALLAST
?.�iV
6" THICK 3/4" MINUS CRUSHED
2:1 CUT/FILL TO DAYLIGHT (TYP.) BASE COURSE COMPACTED TO
95% MAXIMUM DRY DENSITY 2:1 CUT/FILL TO DAYLIGHT(TYP.)
ll�DETAIL
C5.1 TRACK C TYPICAL SECTION ACROSS CREEK
NTS
i
s�
NO. REVISIONS DRAWN BY DATE PROJECT #: 14-167 SHEEN'
BOZEMAN TRA X e TRACK C RAIL EXTENSION 32 DISCOVERY DRIVE DATE: 12/01/2022
Civil Engineering
BOZEMAN,MT 59718 C o
DETAILS PHONE(406)582-0221 Geotechnical Engineering
FAX(406)582-5770 ALLIED
PROJECT ENGINEER: RSR DRAWN BY: EJF 4Q w .alliedengineedngmm Land Surveying EW�NMiNG
BOZ EMANI T�1IONTANA y BOZEMAN TRAX
DESIGNED BY: RSR, EJF REVIEWED BY: RSR ID DETAILS