Loading...
HomeMy WebLinkAbout046_GwMonitoring2024PROJECT # 21349.03 PM: Chris DATE Initials Well #1 Well #2 Well #3 Well #4 Well #5 Well #6 Well #7 Well #8 Well #9 Well #10 Well #11 Well #12 Well #13 6/26/2024 EH DRY 9.96 8.7 5.73 8.5 7.02 6.15 8.28 8.39 6.65 7.69 9.45 7.09 7/3/2024 EH DRY 10.11 8.79 5.99 8.62 7.27 6.4 8.53 8.59 6.88 7.85 9.5 6.91 7/9/2024 EH DRY 10.30 9.00 6.30 8.86 7.59 6.72 8.71 8.86 7.15 8.16 9.82 7.18 7/17/2024 EH See Below 10.63 9.41 6.75 9.32 8.09 7.23 9.09 9.38 7.73 8.74 10.3 7.48 7/23/2024 RP See Below 10.90 9.78 7.11 9.58 8.51 7.57 9.42 9.81 8.23 9.16 10.67 8.69 CASING HEIGHTS 2.6 1.57 1.59 2.14 1.99 2.79 2.52 2.2 2.18 1.8 2.53 1.95 2.19 NOTE: ELEVATIONS FOR EXISTING GROUND ARE APPROXIMATE, TAKEN FROM CAD EG SURFACE As of 7/17/24, well #1 has been removed and graded over as a part of land development east of Mandeville Creek North Park 2024 Ground Water Depth from TOC (FT) - Collected by Manual Measurement from