Loading...
HomeMy WebLinkAbout036_L3.6_IrrigationPlanEastOLD HIG H L A N D B L V D ( C I T Y R / W )HIGH LAND B L VD (C I TY R /W ) LIMI T O F W O R K OLD HIG H L A N D B L V D ( C I T Y R / W ) LIMIT OF WORK LI M I T O F W O R K HIGH LAND B L VD (C I TY R /W ) IRRIGATION TO CONNECT TO EXISTING SYSTEM. LOCATION TBD. BOZEMAN HEALTH TO CONFIRM PHASE 4 PHASE LINE, PROPOSED LANDSCAPING IS LIMITED WITHIN PHASE 4 PROJECT AREA 11.26 1" 228.8 1" 328.5 1" 421.4 1" 530.9 1" 122.7 1" 1320.5 1"1421.6 1" 1519.0 1" 1619.5 1" 1718.9 1" 1823.8 1" 6 L4.1 SLEEVE, TYP. TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE TEMPORARY ZONE IRRIGATION FOR TREES TO COME FROM POC 1. SEE SHEET L3.5 FOR VALVE AND LOCATION. 3.416 1" 34.07 1" 34.08 1" 27.89 1" 30.910 1" 27.811 1" 3 L4.1 ELECTRIC CONTROL VALVE 2 L4.1 1" DRIP ZONE KIT 4 L4.1 DOUBLE VALVE BOX 5 L4.1 VALVE BOX PLACEMENT 8 L4.1 TREE RING DRIPLINE 7 L4.1 POP-UP ROTOR 1 L4.1 TRENCHING DETAILS 10 L4.1 DRIP EMITTERPOP-UP SPRAY HEAD  NORTH 0 30 SCALE: 1" = 30' 601530 UULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDIRRIGATION PLAN (EAST)BOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTL3.6 BE/KP17095_13_IR_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/2025-----SITE PLAN SUBMITTAL-------17095.13IRRIGATION PLAN (EAST) P:\17095_13_Bozeman_Health_Phase_1_Design_CA\CADD_C3D\PRODUCTION_DWG\17095_13_IR_PROD.dwg, IRRIGATION PLAN (EAST), 5/23/2025 1:22:37 PM, amartoncik, 1:1