Loading...
HomeMy WebLinkAbout025_L1.5_LandscapePlanWestMAINTENANCE YARDLIMIT OF WORKLIM I T O F W O R K LIMIT O F W O R K LIMIT OF W O R KLIMIT OF WORKREMOVE AND RESEED EXISTING PATH EXISTING TREES TO REMAIN AND BE PROTECTED, TYP. EXISTING TREE TO REMAIN AND BE PROTECTED, TYP. EXISTING TREES TO REMAIN AND BE PROTECTED, TYP. EXISTING TREES TO REMAIN AND BE PROTECTED, TYP., SEE L1.1 EDGE OF NEW ASPHALT, SEE CIVIL UNDERGROUND STORMWATER RETENTION SYSTEM, SEE CIVIL LANDSCAPE INLET, SEE CIVIL LANDSCAPE INLET, SEE CIVIL LANDSCAPE INLET, SEE CIVIL NEW RV/TRAILER PARKING EXISTING TREE TO REMAIN AND BE PROTECTED EXISTING TREE TO REMAIN AND BE PROTECTED EXISTING TREE TO REMAIN AND BE PROTECTED PARKING LOT ISLANDS WITH LARGE CANOPY TREES, SHRUBS, AND GROUNDCOVERS NEW STORMWATER POND WITH APPROPRIATE WET ROOT TOLERANT SHRUBS AND GRASSES RESEED ALL DISTURBED AREAS EXISTING TREES TO REMAIN AND BE PROTECTED, TYP.SNOW STORAGESNOW STORAGESNOW STORAGE05-01 05-01 05-01 05-01 K-101 K-101 K-101 K-101 K-102 K-102 05-01 05-01 (1) PB (1) TM (3) PP (3) RG (5) AM (3) PP (3) RG (7) RW (3) PP (9) JB (10) JB (1) GI (3) RG (7) RW (3) PP (3) PP (5) AM (10) JB (7) RW (3) PP (10) AM (3) JB (3) JB (1) TM (1) GI (3) PS2 (7) AM (5) RW (1) TM (3) PS2 (5) AM (1) GI (1) GI (3) AM (3) JB (3) PS2 (1) TM (1) GI (3) JB (3) AM (3) PS2 (1) TM (1) GI (1) TM (3) AM (3) JB (3) PS2 (3) JB (3) PP (1) TM (3) RG (3) PP (3) RG (3) PS2 (3) PP (7) AM (5) RW (3) PP (3) PS2 (5) RW (8) JB (8) JB (3) RG (1) GI (3) PP (3) PS2 (10) JB (3) PP (1) GI (3) RG (3) PS2 (3) PP (7) RW (5) PS (5) AR (5) PM (5) PS (5) AR (5) PM (5) PS (1) PB (3) AM (3) PS2 (3) AM (3) RG 2 L2.1 CONIFEROUS TREE 1 L2.1 DECIDUOUS TREE 3 L2.1 SHRUB PLANTING 4 L2.1 PERENNIAL/GRASS/GROUNDCOVER PLANTING 9 L2.1 SEEDING 7 L2.2 CHAINLINK FENCE - 6' HEIGHT (5) AR (5) PS (5) PM (5) AR (5) PS (5) PM (5) AR (5) PS (5) PM (5) AR (5) PS (5) PM (5) AR (5) PS (5) PM (5) AR NEW DOUBLE CHAINLINK ROLLING GATE 25' X 6' (3) PS K-105 SNOW STORAGE2 L2.2 (3) RW (3) RW (1) QM (1) QM (1) QM (1) QM (1) QM (1) QM (5) SB (7) RW (5) SB (5) SB (5) SB (5) SB (5) SB (5) SB (5) RG (5) RG (3) RG LIMIT OF WORK LANDSCAPE EDGING 6' TALL CHAIN LINK FENCE W/ VINYL SLATS, SEE CIVIL FOR LAYOUT LANDSCAPE BOULDERS PROPOSED CONCRETE PAVING, SEE CIVIL PROPOSED ASPHALT PAVING, SEE CIVIL  UULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDLANDSCAPE PLAN (WEST)BOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTL1.5 BE/KP17095_13_LS_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/2025-----SITE PLAN SUBMITTAL-------17095.130 30 SCALE: 1" = 30' 601530 LANDSCAPE PLAN (WEST) LE*EN'P:\17095_13_Bozeman_Health_Phase_1_Design_CA\CADD_C3D\PRODUCTION_DWG\17095_13_LS_PROD.dwg, L1.5, 5/23/2025 8:32:57 AM, amartoncik, 1:1