Loading...
HomeMy WebLinkAbout022_L1.2_LandscapeSchedules&NotesLIMIT OF WORK LANDSCAPE EDGING 6' TALL CHAIN LINK FENCE W/ VINYL SLATS, SEE CIVIL FOR LAYOUT LANDSCAPE BOULDERS PROPOSED CONCRETE PAVING, SEE CIVIL PROPOSED ASPHALT PAVING, SEE CIVIL SYMBOL CODE DESCRIPTION QTY DETAIL CONCRETE SEAT WALL 6' L X 1.5' W 6 4/L2.2 05 Metals LANDSCAPE EDGING 3,091 LF 11/L2.1 Rock ROCK MULCH 3" DEPTH. 3/4" - 1 1/2" ROUND SIZE. GREY IN COLOR. 48,033 SF 7/L2.1 LANDSCAPE BOULDER 3'-5' ROUND PIPESTONE GRANITE BOULDERS FROM QUARRY WORKS, OR APPROVED EQUAL. 12/L2.1 LARGE COBBLE 3"-8" VALLEY COBBLESTONE. GREY IN COLOR. 5,319 SF 3/L2.2 CRUSHED FINES W/ STABILIZER 4" DEPTH. 1,654 SF 8/L2.1 PROPOSED GRAVEL 4" DEPTH 7,687 SF Site Furnishings BENCH LANDSCAPE FORMS GRETCHEN BENCH. ANCHORED. 3 5/L2.2 PICNIC TABLE LANDSCAPE FORMS GRETCHEN TABLE. FREESTANDING. 2 6/L2.2 2 05-01 K-101 K-102 K-103 K-104 K-105 S-101 S-102 41 REQUIRED PROVIDED CIT< O) BOZEMAN LANDSCAPE AND IRRIGATION PER)ORMANCE AND DESIGN STANDARDS 1.3 EXEMPTIONS - STORMWATER DETENTION OR RETENTION PONDS STORMWATER DETENTION AND RETENTION PONDS ARE EXEMPT FROM LANDSCAPING REQUIREMENTS INCLUDING THE SITE AREA COVERAGE REQUIREMENT. STORMWATER DETENTION OR RETENTION PLANTINGS MUST MEET REQUIREMENTS OUTLINED IN BMC 38.410.080. 75,684 SF OF STORMWATER AREA IS INCLUDED IN THE PHASE 1 SITE AREA. SEE PLANS AND DETAILS FOR MORE INFORMATION. 3.2.1 LANDSCAPE DESIGN STANDARDS THE LANDSCAPE DESIGN APPROVAL PATHWAY SELECTED FOR COMPLIANCE (PRESCRIPTIVE VS. PERFORMANCE)PRESCRIPTIVE PATHWAY TOTAL LANDSCAPED AREA (SQUARE FEET)TOTAL LANDSCAPED AREA   S) NONE;EMPT LANDSCAPE AREA   S) (WEST NON-EXEMPT LANDSCAPE AREA - 26,272 SF, EAST NON-EXEMPT LANDSCAPE AREA - 102,710 SF, NORTH NON-EXEMPT LANDSCAPE AREA - 64,135 SF) INDICATION OF METHOD USED TO MEET TOPSOIL QUALITY REQUIREMENTS.AMEND EXISTING SOILS ACCORDING TO SOIL TEST RECOMMENDATIONS. SOIL IMPORT AS NEEDED SHALL BE AMENDED ACCORDING TO TOPSOIL TEST RECOMMENDATIONS AS WELL. TURFGRASS AREAS MUST NOT EXCEED 20 PERCENT OF THE TOTAL LANDSCAPED AREA.1% OF TOTAL LANDSCAPE AREA IS TURFGRASS. REMAINING GRASS AREAS CONSIST OF NATIVE GRASSES. ALL REMAINING LANDSCAPED AREAS MUST CONSIST SOLELY OF LOW WATER USE VEGETATION (PF OF 0.3 OR LESS) AND LANDSCAPE ELEMENTS SUCH AS MULCH. ALL NON-EXEMPT LANDSCAPE AREAS CONSIST OF LOW WATER USE VEGETATION. SEE PLANT SCHEDULE FOR SPECIES INFORMATION. LANDSCAPED AREA COVERAGE REQUIREMENTS AT LEAST 60 PERCENT OF THE LANDSCAPED AREA MUST BE LANDSCAPED AND MAINTAINED WITH SOME COMBINATION OF VEGETATIVE UNDERSTORY PLANTINGS. (EXEMPTIONS - AREAS WITHIN 10' OF BUILDING, LANDSCAPE AREAS UNDER 6' WIDE, STREET FRONTAGE AREAS) THIS REQUIREMENT IS SATISFIED. 60% OR MORE OF THE LANDSCAPED AREA IS VEGETATION. A MINIMUM OF 10 PERCENT OF THE LANDSCAPED AREA MUST BE VEGETATED WITH CONTAINER GROWN SHRUBS OR PERENNIALS. (TOTAL - 19,312 SF REQUIRED) TOTAL - 17,594 SF PROVIDED. REMAINING 1,718 SF OF CONTAINER GROWN SHRUBS PLANNED FOR EAST AREA ARE NOT INCLUDED IN THIS SITE PLAN AS CONSTRUCTION OF PHASE 4 SITE PLAN WILL CAUSE DISTURBANCE WITH EXACT LIMITS UNKNOWN. TO PREVENT THE REMOVAL OF NEW PLANTINGS AND LANDSCAPING IN FUTURE PHASES, THESE LANDSCAPING ELEMENTS WILL BE ADDED TO THE PHASE 4 SITE PLAN. SEE L1.6 FOR PHASE 4 PHASE LINE LOCATION. TREE REQUIREMENTS OUTSIDE OF PARKING LOTS AND BOULEVARDS 1-5 TREES - CAN HAVE 100% OF ONE SPECIES THERE ARE ONLY TWO TREES THAT ARE NOT STREET TREES OR PARKING LOT TREES WITHIN THIS PROJECT. A MINIMUM OF 75 PERCENT OF PROPOSED TREES MUST BE DROUGHT ADAPTED OR HAVE A PLANT FACTOR OF 0.3 OR LESS. TREES HAVE A PLANT FACTOR OF 0.1. SEE PLANT SCHEDULE FOR SPECIES INFORMATION. TREES MUST BE PLANTED AT A MINIMUM RATE OF 1 PER 1600 SQUARE FEET OF LANDSCAPED AREA (DECIDUOUS/EVERGREEN TREES PRESERVED ON SITE APPLY TOWARDS TREE PLANTING REQUIREMENT. SEE TREE PROTECTION PLAN.) (WEST - 17 TREES, EAST - 65 TREES, NORTH - 40 TREES) WEST - 23 EXISTING TREES; EAST - 13 EXISTING TREES; NORTH - 5 EXISTING TREES. THIS REQUIREMENT IS NOT MET. WITHIN THE PROJECT CONDITIONS, STREET TREES MUST BE SETBACK INTO THE LANDSCAPE DUE TO EXISTING UTILITIES IN BOULEVARDS. ADDITIONAL TREE PLANTINGS WITHIN THE SPACES AVAILABLE WILL RESULT IN OVERCROWDING. A MINIMUM OF 50 PERCENT OF TREES MUST BE CANOPY TREES.THIS REQUIREMENT IS SATISFIED. CIT< O) BOZEMAN MUNICIPAL CODE SEC   BLOC. )RONTAGE STANDARDS MIXED BLOCK FRONTAGE LANDSCAPED FRONTAGE: PROVIDE A 10' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS. THE AREA BETWEEN THE STREET AND BUILDING MUST BE LANDSCAPED. THIS REQUIREMENT IS SATISFIED. SEC   LANDSCAPING C PAR.ING LOT LANDSCAPING ALL PARKING LOTS LOCATED BETWEEN A PRINCIPAL STRUCTURE AND A PUBLIC STREET, MUST BE SCREENED FROM THE PUBLIC STREET. LANDSCAPING MUST BE CONTINUOUS AND NO LESS THAN 4' IN WIDTH. LANDSCAPING WIDTH MUST BE BETWEEN 4'-6' IN HEIGHT. SEE LANDSCAPE PLANS FOR AREAS TO RECEIVE SCREENING LANDSCAPE MEASURES. THERE MUST BE 1 LARGE CANOPY TREE OR 1 LARGE NON-CANOPY TREE AND 1 SMALL TREE OR 3 SMALL TREES FOR EVERY 9 SPACES (IN OR WITHIN 20' OF PARKING LOT). (PARKING LOT E EXPANSION - 162 SPACES, 18 REQUIRED) (PARKING LOT A EXPANSION - 197 SPACES, 22 REQUIRED) PARKING LOT E EXPANSION - 21 TREES PROVIDED, PARKING LOT A EXPANSION - 22 TREES PROVIDED NO PARKING SPACE SHALL BE LOCATED MORE THAN 70' FROM THE TRUNK OF A TREE. TREES MUST BE PLANTED AT LEAST 3' FROM THE BACK OF CURB/EDGING. TREE PLACEMENT ENSURES THAT NO PARKING SPACE IS MORE THAN 70' FORM THE TRUNK OF A TREE AND PLANTED AT LEAST 3' FROM THE BACK OF CURB/EDGING. MUST HAVE A MIN. OF 20 SF PER PARKING SPOT OF LANDSCAPING WITHIN THE LOT. (PARKING LOT E EXPANSION - 162 PARKING SPACES = 3,240 SF) (PARKING LOT A EXPANSION - 197 PARKING SPACES = 3,940 SF) 8,162 SF OF PARKING LOT LANDSCAPING PROVIDED IN PARKING LOT E EXPANSION, 10,142 SF OF PARKING LOT LANDSCAPING PROVIDED IN PARKING LOT A EXPANSION E STREET )RONTAGE LANDSCAPING ALL STREET ROW CONTIGUOUS TO OR WITHIN THE PROPOSED DEVELOPMENT SITE NOT USED FOR STREET PAVEMENT/CURBS/SIDEWALKS MUST BE LANDSCAPED. SEE LANDSCAPE PLAN FOR STREET FRONTAGE LANDSCAPE AREAS. STREET TREES MUST INCLUDE 1 LARGE CANOPY TREE FOR EACH 50' OF TOTAL STREET FRONTAGE. ELLIS STREET APPROX. 486' FRONTAGE = 10 TREES 30 ORNAMENTAL TREES (2 PER 50 FEET OF FRONTAGE) DUE TO OVERHEAD POWER LINES HIGHLAND BOULEVARD (NORTH) APPROX. 320' FRONTAGE = 7 TREES 7 TREES HIGHLAND BOULEVARD (SOUTH) APPROX. 469' FRONTAGE = 10 TREES 10 TREES OLD HIGHLAND BOULEVARD (EAST) APPROX. 725' FRONTAGE = 15 TREES 30 ORNAMENTAL TREES (2 PER 50 FEET OF FRONTAGE) DUE TO OVERHEAD POWER LINES OLD HIGHLAND BOULEVARD (WEST) APPROX. 718' FRONTAGE = 15 TREES 15 LARGE CANOPY TREES FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDLANDSCAPE SCHEDULES & NOTESBOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTL1.2 BE/KP17095_13_LS_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/202506/02/202507/07/202508/05/2025--SITE PLAN SUBMITTALBID SETSITE PLAN SUBMITTALSITE PLAN SUBMITTAL----17095.13LEGEND BOZEMAN MUNICIPAL CODE REQUIREMENTS GENERAL NOTES 1.THE CONTRACTOR SHALL OBTAIN, AT THEIR OWN EXPENSE, APPLICABLE LICENSES, STANDARDS, PERMITS, ETC. WHICH ARE NECESSARY TO PERFORM THE WORK. 2.THE CONTRACTOR SHALL LOCATE, CLEARLY MARK AND MAINTAIN EXISTING UTILITIES ON THE SITE PRIOR TO WORK START UP. CALL FOR UTILITY LOCATES PRIOR TO COMMENCING WORK. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES AND REPAIR OF UTILITIES IF DAMAGED. REPAIR SHALL BE DONE AT NO ADDITIONAL COST TO THE OWNER 4.ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. ANY DEVIATION FROM THESE PLANS MUST BE APPROVED BY OWNER OR LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. 5.LIMIT OF WORK IS AS INDICATED ON THE PLANS. 6.COORDINATE SITE ACCESS, STAGING, STORAGE AND CLEANOUT AREAS WITH OWNER'S REPRESENTATIVE. MATERIALS SCHEDULE MATERIALS NOTES 1.MATERIAL QUANTITIES SHOWN IN SCHEDULE FOR REFERENCE PURPOSES. CONTRACTOR TO SELF-VERIFY MATERIAL AMOUNTS AND TOTALS BASED ON PLAN REVIEW. 2.CONTRACTOR TO SUBMIT MATERIAL SAMPLES FOR APPROVAL BY LANDSCAPE ARCHITECT. ALL MATERIALS SHALL COMPLY WITH THEIR RESPECTIVE AND APPLICABLE STANDARDS. 3.PRODUCTS AND MATERIALS SHALL BE DELIVERED AND INSPECTED PRIOR TO ACCEPTANCE FROM TRUCKING COMPANY. CONTRACTOR IS RESPONSIBLE FOR PRODUCTS AND MATERIALS THAT ARE DAMAGED, BROKEN, OR OTHERWISE UNUSABLE TO THE OWNER, AT NO EXPENSE TO THE OWNER. 4.ALL PRODUCTS SHALL BE STORED AS PER MANUFACTURER'S RECOMMENDATIONS. COMMERCIAL OPEN SPACE NOT TO SCALE COMMERCIAL OPEN SPACE NOTES REQUIREMENT: AN AREA EQUAL TO AT LEAST TWO PERCENT OF THE SITE AREA.THE OPEN SPACE MAY BE IN THE FORM OF PEDESTRIAN-ORIENTED OPEN SPACE, GARDEN, PLAY AREA OR OTHER OPEN SPACE FEATURE THAT SERVES BOTH AS A VISUAL AMENITY AND A PLACE FOR HUMAN ACTIVITY. TOTAL EXISTING COMMERCIAL OPEN SPACE: ~45,791 SF TOTAL PHASE 1 SITE AREA: 652,005 SF REQUIRED OPEN SPACE: 13,040 SF PROVIDED OPEN SPACE: 108,200 SF THE PROVIDED OPEN SPACE INCLUDES EXISTING MULTI-USE PATHS, BENCHES, AND CONCRETE SEAT WALLS FOR SEATING, AS WELL AS ENHANCED LANDSCAPING ALONG THE IMPROVED STORM POND AND RETAINING WALLS. THESE SPACES SERVE AS BOTH A VISUAL AMENITY AND A PLACE FOR HUMAN ACTIVITY. PARKING LOT A P:\17095_13_Bozeman_Health_Phase_1_Design_CA\CADD_C3D\PRODUCTION_DWG\17095_13_LS_PROD.dwg, L1.2, 8/5/2025 11:30:08 AM, amartoncik, 1:1