Loading...
HomeMy WebLinkAbout021_L1.1_TreeProtectionPlanOLD HIGHLAND BLVD (CITY R/W)HIGH L A N D BL V D ( CI T Y R/ W)HIGHLAND BLVD (CITY R/W)ELLIS STREET (CITY R/W) BOZEMAN HEALTH DEACONESS REGIONAL MEDICAL CENTER LIMIT OF WORK EXISTING TREES TREE TO BE REMOVED TREE TO BE PROTECTED TREE PROTECTION FENCING  UULC FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDTREE PROTECTION PLANBOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTL1.1 BE/KP17095_13_LS_TP.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/2025-----SITE PLAN SUBMITTAL-------17095.13TREE PROTECTION PLAN 0 100 SCALE: 1" = 100' 20050100 LE*EN' T5EE P5OTECT,ON NOTES 1.TREE REMOVAL BY GENERAL CONTRACTOR. 2.PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITY, ALL TREES TO REMAIN WITHIN THE CONSTRUCTION LIMITS SHALL BE TAGGED WITH ORANGE OR PINK SURVEYOR FLAGGING. OWNER'S REPRESENTATIVE SHALL VERIFY TAGGED TREES ARE THOSE TO BE PROTECTED. 3.REMOVE STUMPS TO 12" BELOW GRADE. DO NOT DAMAGE ADJACENT ASPHALT OR CONCRETE THAT IS TO REMAIN. DAMAGE TO CONCRETE OR ASPHALT SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 4.NO CONSTRUCTION ACTIVITIES SHALL BE PERMITTED IN THE TREE PROTECTION ZONE. INCLUDING, BUT NOT LIMITED TO, MATERIALS STORAGE, TRUCK OR MATERIALS WASHOUT, OR OTHER SITE WORK ASSOCIATED WITH THIS PROJECT. 5.DAMAGE TO TREES OR BRANCHES DURING CONSTRUCTION ACTIVITIES, WHETHER FROM THE GROUND OR OVERHEAD CRANE, SHALL BE REPLACED. NOTIFY OWNER'S REPRESENTATIVE IMMEDIATELY UPON OCCURRENCE OF DAMAGE. 6.DO NOT CHANGE OR ALTER GRADES WITHIN THE TREE PROTECTION ZONE. 7.CUT OFF EXPOSED ROOTS WHERE FOUND ALONG GRADING AND CLEARING LIMITS. CLEANLY CUT ROOTS, AVOIDING TEARS. COVER ALL EXPOSED ROOTS WITH ORGANIC MULCH, COMPOST OR TOPSOIL. 8.DEMOLITION AND REMOVAL ACTIVITIES SHALL AVOID TREE PROTECTION AREAS AND AVOID BRANCHES OF TREES TO REMAIN. 9.CONTRACTOR SHALL REMOVE, AND DISPOSE OF OFF SITE, ALL TREE LIMBS, TRUNKS, AND STUMPS. TREE PROTECTION N.T.S. VARIES PER TREE SIZE - EXTEND FROM DRIPLINE TO DRIPLINE 4'-0"SECTION NOTES: 1.IN AREAS WHERE GRADING EXTENDS INTO EXISTING TREE DRIPLINES, CONTRACTOR SHALL HAND GRADE. 2.REMOVAL OF TREE PROTECTION FENCE DURING CONSTRUCTION WILL RESULT IN A $500 PER INCIDENT, PER DAY FINE TO THE CONTRACTOR. 3.TREE PROTECTION FENCE SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES. 4.ANY DAMAGED FENCE SHALL BE REPAIRED ON A DAILY BASIS. 5.DEAD TREES, SHRUBS, OR UNDERGROWTH SHALL BE CUT FLUSH WITH ADJACENT GRADE. THERE SHALL BE NO SOIL DISTURBANCE UNDER THE DRIPLINE OF THE TREE TO REMAIN. 6.BOULEVARD TREE PROTECTION FENCING TO BE ADJUSTED TO REFLECT THE WIDTH OF THE TREE LAWN OR TREE GRATE AREA WHERE PROVIDING FENCING TO THE DRIPLINE EXTENTS IS NOT POSSIBLE. 7.PROVIDE SUPPLEMENTAL WATER DURING CONSTRUCTION. INSTALL 6'-0" T-POST 6'-0" ON CENTER AT DRIP LINE OF TREE. INSTALL 4'-0" ORANGE CONSTRUCTION FENCE AROUND TREE. USE 3 CABLE TIES PER POST. FENCING NOT TO BE REMOVED WITHOUT WRITTEN CONSENT OF THE PROJECT REPRESENTATIVE DO NOT TRENCH, FILL, PARK VEHICLES, OR STORE MATERIALS IN DRIP LINE AREA OF TREE OR WITHIN FENCING 4'-0" ORANGE CONSTRUCTION FENCE WITH 6'-0" T-POST, 6'-0" O.C. PLAN 1 P:\17095_13_Bozeman_Health_Phase_1_Design_CA\CADD_C3D\PRODUCTION_DWG\17095_13_LS_TP.dwg, L1.1, 5/23/2025 8:00:33 AM, amartoncik, 1:1