Loading...
HomeMy WebLinkAbout020_E1.3_ElectricalSitePlanNorthL40 L41 L39 L38 L34 L25 L29 L26 L30 L27 L31 L35 L36 L37 L33 L28 L32  0 30 SCALE: 1" = 30' 601530 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDELECTRICAL SITE PLAN (NORTH)BOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTE1.3 BE/KP17095_13_ELEC_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/202506/02/202507/07/2025---SITE PLAN SUBMITTALBID SETSITE PLAN SUBMITTAL-----17095.13CONDUIT & WIRE SCHEDULE A E F G P:\17095_13_Bozeman_Health_Phase_1_Design_CA\CADD_C3D\PRODUCTION_DWG\17095_13_ELEC_PROD.dwg, E1.3, 7/7/2025 4:40:49 PM, kketterling, 1:1