Loading...
HomeMy WebLinkAbout019_E1.2_ElectricalSitePlanWestL22 L23 L24 L21 L20 L19L18L17 L1 L6 L10 L13 L2 L5 L9 L14 L15 L11 L7 L3 L4 L8 L12 L16  0 30 SCALE: 1" = 30' 601530 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDELECTRICAL SITE PLAN (WEST)BOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTE1.2 BE/KP17095_13_ELEC_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/202506/02/202507/07/2025---SITE PLAN SUBMITTALBID SETSITE PLAN SUBMITTAL-----17095.13CONDUIT & WIRE SCHEDULE A C B D P:\17095_13_Bozeman_Health_Phase_1_Design_CA\CADD_C3D\PRODUCTION_DWG\17095_13_ELEC_PROD.dwg, E1.2, 7/7/2025 4:40:39 PM, kketterling, 1:1