HomeMy WebLinkAbout011_C4.1_DrainagePlanWest NORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDDRAINAGE PLAN (WEST)BOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTC5.1 BE/KP17095_13_STORMWATER_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/202506/02/202507/07/202508/05/2025--SITE PLAN SUBMITTALBID SETSITE PLAN SUBMITTALSITE PLAN SUBMITTAL----17095.130 40
SCALE: 1" = 40'
802040
NOTES:
1.CONTRACTOR SHALL OVER EXCAVATE CHAMBER SYSTEM BASINS DOWN TO EXISTING GRAVEL AND BACKFILL
WITH GRAVEL AS NECESSARY TO BOTTOM OF ROCK ELEVATION.
2.CONTRACTOR SHALL INCLUDE THE PROPOSED GRAVEL SPECIFICATIONS WITH THEIR CHAMBER SYSTEM
SUBMITTAL FOR ENGINEER REVIEW PRIOR TO ORDERING AND INSTALLING THE MATERIALS.