Loading...
HomeMy WebLinkAbout003_C2.1_ExistingTopography&DemolitionPlanCP#23 CP#1 CP#3 CP#41 CP#29 CP#21 PROJECT SURVEY CONTROL Point # 1 3 21 23 29 41 42 43 44 45 Northing 10858.94 10783.31 10538.56 11269.58 10511.80 11795.87 11596.81 11450.70 10711.76 11596.99 Easting 9842.57 10460.22 9887.59 10126.73 10247.29 10450.99 10528.03 10949.91 9851.88 10664.10 Elevation 4911.77 4914.09 4919.58 4899.15 4918.13 4875.49 4889.91 4888.67 4912.16 4892.95 Description CP SPIKE CP SPIKE CP SPIKE CP SPIKE CP SPIKE CP SPIKE CP /SPIKE CP /SPIKE CP /SPIKE CP /SPIKE PROJECT DATUM: LOW DISTORTION PROJECTION COORDINATE SYSTEM (LDP MT83-BOZ-IF) NORTH AMERICAN DATUM OF 1983 SURVEYED: 04/16/24 BY: SS  NORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDEXISTING TOPOGRAPHY & DEMOLITION PLANBOZEMAN HEALTH CAMPUSPHASE 1 DESIGNBOZEMAN, MTC2.1 BE/KP17095_13_EX_PROD.DWGDE/AM03/11/2025SITE PLAN SUBMITTAL05/23/202506/02/202507/07/202508/05/2025--SITE PLAN SUBMITTALBID SETSITE PLAN SUBMITTALSITE PLAN SUBMITTAL----17095.130 100 SCALE: 1" = 100' 20050100