Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
016_2501 BSF HQ - A110 - Site Plan
136ACProperty Line207.00'GasElecComm(E) TransformerProperty Line262.77'Property Line87.61'Property Line76.32'PL 22.23'PL 19.99'PL 29.18'PL 19.35'PL 71.89'100 Year Base FloodDitchBozeman CreekGold Avenue(E) Comm Pedestal(E) Power Pole3' Setback3' Setback10' SetbackExisting Footprint40' - 0"Existing Footprint60' - 0"See Landscape for Screening(N) Sidewalk, see Civil6' - 0 5/16"VanLoading &Unloading,See Civil452Mountable CurbBCOB Vision TriangleCreek Setback, Per Plat J-42-ACOB 35' Watercourse SetbackExisting BuildingFootprint : 2400SFRoofline OHProposed SiteLot Area : 0.765 AcreSee Coversheet for Parking Calculations,See Civil Drawings for Details(10) Bollard Path Lighting(N) Bike Parking2 Required, 4 Provided(N) Sidewalk, see Civil(E) LandscapeSee Landcape Drawings for Details(N) Entry Canopy, 3'6"x11'2"DNRoofline OHAll Utility Locations, See Civil(E) Concrete ApronADA Stall to be marked with International symbol of Accessibility, mounted 60" min. from bottom of sign to ground, centered on parking space.To comply with 2017 ICC A117.1, Section 703.6.3.13' - 6"11' - 2"11136AC452BProperty Line207.00'GasElecComm(E) TransformerProperty Line262.77'Property Line87.61'Property Line76.32'PL 22.23'PL 19.99'PL 29.18'PL 19.35'PL 71.89'100 Year Base FloodDitchBozeman CreekGold Avenue(E) Comm Pedestal(E) Power Pole3' Setback3' Setback10' Setback40' - 0"60' - 0"Creek Setback, Per Plat J-42-ACOB 35' Watercourse SetbackExisting BuildingFootprint : 2400SFRoofline OHProposed SiteLot Area : 0.765 Acre(E) Gravel Parking Approx 8655 SF(E) Shed 3447SF(E) Shed 2203SF(E) Shed 1122SF(E) Shed 4276SF(E) Concrete ApronPROJECT #SHEET NUMBERREVISION:DATE618 N Wallace | Bozeman, MT 59715DRAFTNOT FOR CONSTRUCTIONThis drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above.Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2024 MINARIK Architecture, IncALL RIGHTS RESERVEDThese Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.6/25/2025 11:56:42 AM12501A100BSF HeadquartersBridger Ski Foundation1606 Gold AvenueBozeman, Montana6/25/2025Site PlanSite Plan ReviewN1/16" = 1'-0"Proposed Site Plan1N1/16" = 1'-0"Existing Site Plan2REVISION DATE REASON FOR ISSUE1 6/25/2025 SP Review Resubmittal