Loading...
HomeMy WebLinkAbout001_2501 BSF HQ - G000 - Cover SheetNCom/Rec: Total 1343 sf222284444542427KitchenetteRestroomT.C.T.C.Mech.S.C.LockerHallwayWork RmGear Rm173 sfUPGear StorageGearStorageGearStorageEntry/Conference/Breakout1170 sfOffices502 sfOpen to BelowOpen to Below827OfficeHallwayOffice StorageDNOffices: Total 994 sfOffices492 sfPROJECT #SHEET NUMBERREVISION:DATE618 N Wallace | Bozeman, MT 59715DRAFTNOT FOR CONSTRUCTIONThis drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above.Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2024 MINARIK Architecture, IncALL RIGHTS RESERVEDThese Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.7/22/2025 3:06:25 PM12501G000BSF HeadquartersBridger Ski Foundation1606 Gold AvenueBozeman, Montana7/22/2025Cover SheetSite Plan ReviewBridger Ski Foundation -HQCODES:SHEET INDEX:PROJECT TEAM:Owner: Joseph Mahurin1606 Gold Ave / Bozeman, MT 59771P: 406.587.2445Attn: BSF, CristieTate / cristie@tatemanagement.com Architect: Minarik Architecture, Inc618 N Wallace / Bozeman, MT 59715P: 971-319-6249Attn: Doug Minarik / doug@minarikarch.comStructural Engineer: Gallatin Peak EngineeringBozeman, MTP: 406.920.3309Attn: Matt AmrheinGeneral Contractor:Langlas & Associates, Inc.4555 Valley Commons Drive / Bozeman, MT 59718P: 406.585.3420Attn: Eric BakerCivil Engineer: Morrison-Maierle2880 Technology Blvd W / Bozeman, MT 59718P: 406 922 6738Attn: Cooper KrauseLandscape Architect: Design 5 Landscape Architecture111 N Tracy Ave / Bozeman, MT 59715P: 406 587 4873Attn: Troy SchererMechanical / Plumbing Contractor:Central Plumbing, Heating, Excavation387 Floss Flats Rd / Belgrade, MT 59714P: 406 924 1273Attn: Erik RennaElectrical Contractor:Morrison-Maierle2880 Technology Blvd W / Bozeman, MT 59718P: 406 922 6848Attn: Ryan MaroneyPROPERTY INFORMATION:Project Address: 1606 Gold Avenue, Bozeman, MT 59715Legal Description:Industrial Properties Sub, S06, T02 S, R06 ECounty:GallatinGeocode: 06-0799-06-1-01-02-0000Zone: M-1, Light Manufacturing DistrictBlock Frontage:OtherProperty / Lot Area:0.765 Acres, 33,323.4 sf FAR : 0.5:1Building Footprint: 2400 sfLot Coverage:7.2% Building Height:Max Allowed Building Height: 40'-0"Existing Building Height: 24'-1" Gross Building Areas:Level 1:2,400Level 2: 1,173Total Building Area: 3,573 sfFloor Area Impact:ExistingOffice632 SFIndustrial2084 SFNewOffice2932 SFWarehouse641 SF ImpactOffice+2300 SFIndustrial-2084 SFWarehouse+641 SFParking Requirements:Use Type SFRequiredTotal RequiredProvided Offices994 sf 1/250 sf 3.98Com/Rec 1343 sf 1/200 sf 6.7110.69 11(max spaces -125% of required = 13 max)Bicycle Parking -2 required, 4 providedNote: Floor Area per, COB Sec 38.540.010.A.1.a (to exclude 1-9)(1)Window display areas(2)Storage areas(3)Areas used for incidental repair of equipment used or sold on the premises(4)Areas occupied by toilets and restrooms, kitchens or break rooms(5)Areas occupied by public utility facilities(6)Areas occupied by dressing rooms, fitting or alteration rooms incidental to the sale of clothing(7)Areas occupied by stairways and elevators(8)Corridors connecting rooms or suites of rooms(9)Enclosed areas used for parking vehiclesGENERAL NOTES:1. This set of drawings is published in conjunction with an in line specification without which the Contract Documents are Incomplete.2. Contractor must comply with the rules and regulations of the agencies having jurisdiction and shall conform to all city, county, state and federal construction safety and sanitary laws, codes statutes and ordinances. All fees, taxes, permits, applications and certificates of inspection, and the filing of all work with governmental agencies shall be the responsibility of the contractor.3. All work shall be performed by skilled and qualified workmen in accordance with the best practices of the trades involved, and in compliance with building regulations and/or governmental laws, statutes or ordinances concerning the use of union labor.4. Each trade will proceed in a fashion that will not delay the trades following them.5. All work shall be erected and installed plumb, level, square, true, and in proper alignment.6. All work and materials shall be guaranteed against all defects for a period of at least one (1) year from approval of final payment.7. Do not scale the drawings. Written dimensions take precedence over scaled dimensions. Dimensions are to face of framing, face of concrete, gridline, or centerline of object, unless otherwise noted.8. Detailed drawings and larger scale drawings take precedence over smaller scale drawings.9. The Architect shall neither have control over or charge of, nor be responsible for, the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the work, since these are solely the Contractor's rights and responsibilities under the Contract Documents.PROJECT DESCRIPTION:Renovation of an existing building and site improvements. The exterior building modifications to include painting the exterior (new siding as-needed) as well as utilizing the existing openings for more energy efficient windows and doors, keeping the original structure and form as is. The building interior to include office/meeting rooms, a workshop, athletes room, and support program. Site improvements to include modifications to the existing parking by consolidating what's currently used and provide a conforming parking lot off the existing access apron. 10. The stability of the structure is dependent on the completed condition. The design, adequacy, and safety of erection bracing, shoring, temporary supports, etc, is the sole responsibility of the contractor and has not been considered by the architect/ designer. The contractor is responsible for the stability of the structure prior to the completion of all shear walls, roof and floor diaphragms and finish materials.11. Overall site plan based on spot elevations and non-comprehensive site survey by others. Actual site conditions may differ from conditions shown in these documents. Contractor shall verify and confirm existing conditions shown or implied on the drawings prior to the start of construction or ordering materials. Notify architect/ designer of any discrepancies.12. Contractor and subcontractor shall become familiar with the site, existing conditions, and these drawings prior to commencing work.13. Scope of work shall include work indicated and implied by these drawings.14. All construction debris to be removed off-site. All debris is to be disposed of in a legal manner at a landfill or recycling facility. No debris shall be disposed of in local waste collection facilities.15. Contractor to locate exact locations of utilities.16. Install all materials per manufacturer recommendations.17. All sheet metal work shall conform to current SMACNA (Sheet Metal and Air Conditioning Contractors' National Assoc., Inc.) Standards.18. Submit paint drawdowns, cabinetry shop drawings, and all other related finishes for designer approval.19. Submit locations of fire strobes and thermostat locations for Designer approval prior to construction to avoid conflict with furnishings.G000 Cover SheetC000 General NotesC001 Existing ConditionsC002 Construction RouteC003 Erosion Control PlanC100 Site PlanC200 Grading PlanC300 DetailsL000 Overall Site PlanL001 Notes and LegendsL300 Planting PlanL500 Landscape DetailsL501 Landscape DetailsA005 DemolitionA100 Site PlanA200 Floor Plans - 1st FloorA201 Floor Plans - 2nd FloorA300 ElevationsE100 Electrical Lighting CutsheetsE101 Electrical Photometric PlanJurisdictional Authority: City of Bozeman (Gallatin County, State of Montana)Applicable Codes:Administration Rules of Montana (ARM) Rule 24.301.2022021 International Existing Building Code (IEBC)ARM Rule 24.301.1712021 International Building Code (IBC)ARM Rule 24.301.1462021 International Energy Conservation Code (IECC)ARM Rule 24.301.1612021 International Mechanical Code (IMC)ARM Rule 24.301.1722020 National Electrical Code (NEC)ARM Rule 24.301.4012021 Uniform Plumbing Code (UPC) (IAPMO)ARM Rule 24.301.3012021 International Fuel Gas Code (IFGC)ARM Rule 24.301.1732021 International Fire CodeARM Rule 23.12.601Admin Order 2023-04 Adoption of 2021 Fire CodeICC A117.1-2017 Standard for Accessible and Usable Buildings and FacilitiesARM Subchapter 24.301.9Vicinity Map1ABBREVIATIONS:AB Anchor BoltACP Acoutic Ceiling Panel (ACP-1)AD Access DoorADJ AdjacentAFF Above Finish FloorALT AlternateALUM AluminumAPPROX ApproximateAWP Acoustic Wall Panel (AWP-1)BCS Baby Changing SystemBLDG BuildingBM BeamBO Bottom OfCH Coat Hook (CH-1)CIP Cast In PlaceCJ Control JointCLG CeilingCLR ClearCMU Concrete Masonry UnitCOL ColumnCONC Concrete (CONC-1)CONT ContinuousCONTR ContractorCPT Carpet (CPT-1)CS Cementitious Surface Material (CS-1)CT Ceramic Tile (CT-1)DIA DiameterDIM DimensionDIM PT Dimension PointSUBMITTAL DOCUMENTS:Deferred Submittals:Separate Permits:DN DownDS DownspoutDTL DetailDWG Drawing(E) ExistingEA EachEJ Expansion JointEL ElevationELEC ElectricalELEV ElevatorEP Electrical PanelEQ EqualEQUIP EquipmentES Exposed StructureEXT ExteriorFAF Fluid Applied Flooring (FAF-1)FB Flat BarFD Floor DrainFE Fire Extinguisher (FE-1)FEC Fire Extinguisher Cabinet (FC-1)FF Finish FloorFLR FloorFND FoundationFOB Face of Brick/BlockFOC Face of ConcreteFOF Face of FinishFOS Face of StructureFRP Fiber Reinforced PlasticFRT Fire Retardant TreatedFTG FootingGA GaugeGALV GalvanizedGB Grab BarGFRC Glass Fiber Reinforced ConcreteGFRG Glass Fiber Reinforced GypsumGL Glass/GlazingGWB Gypsum Wall BoardHB Hose BibbHD Hand Dryer (HD-1)HDWD HardwoodHM Hollow MetalHORIZ HorizontalHR HourID Inside DiameterINSUL InsulationJT JointLAM LaminatedLAV LavatoryLF Lineal Feet / Linear FootM Mirror (M-1)MAX MaximumMDO Medium Density OverlayMECH MechanicalMEMB MembraneMFR ManufacturerMIN MinimumMISC MiscellaneousMO Masonry OpeningMP Metal Panel (MP-1)MR Moisture ResistantMRK Mop RackMTG MountingMTL Metal(N) NewNA Not ApplicableNIC Not in ContractNO NumberNOM NominalNTS Not to ScaleOA OverallOC On CenterOD Outsidde DiameterOFCI Owner Furnished Contractor InstalledOFOI Owner Furnished Owner InstalledOH OverheadOPNG OpeningOPP OppositeP Paint (P-1)PERIM PerimeterPL Property LinePT Pressure TreatedPTD Paper Towel Dispenser (PTD-1)PTR Paper Towel Receptacle (PTR-1)PW Paper Towel Dispenser / Waste ReceptaclePWD PlywoodR RiserRAD RadiusRB Rubber Base (RB-1)RBR RubberRD Roof DrainRD/OD Roof Drain / Drain OverflowREF ReferenceREIN ReinforcedREQD RequiredRF Resilient Flooring (RF-1)RM RoomRO Rough OpeningRST Resilient Stair Tread (RST-1)SAM Self Adhered MembraneSCB Self Cove Base (SCB-1)SCD Seat Cover Dispenser (SCD-1)SCS Shower Compartment SeatSD Soap Dispenser (SD-1)SECT SectionSF SubfloorSHT SheetSHTG SheetingSIM SimilarSND Sanitary Napkin Dispenser (SND-1)SNR Sanitary Napkin Receptacle (SNR-1)SPEC SpecificationSR Shower Curtain RodSSG Structural Silicone GlazingSST Stainless SteelSTD StandardSTL SteelSUSP SuspendedSYM SymmetricalSOG Slab on GradeT TreadT&G Tongue and GrooveTD Trench DrainTHK ThickTO Top OfTPD Toilet Paper Dispenser (TPD-1)TR TransparentTRS Traffic SurfaceTS Tube SteelTSC Toilet Seat Cover Dispenser (TSC-1)TYP TypicalUNO Unless Noted Otherwise(V) Verify in FieldVERT VerticalVG Vertical GrainW/ WithW/O WithoutWD Wood (WD-1)WM Walk-off Matt (WM-1)WR Waste ReceptacleREVISION DATE REASON FOR ISSUE1 Date 1 Revision 1Parking Calcs - Floor Plan - 1st FloorParking Calc Floor Plan - 2nd Level1