HomeMy WebLinkAboutFowler Community Housing CC Work Session 20250812City Commission Work Session, August 12, 2025
Fowler Avenue
Community
Housing
GALLATIN REGIONAL PARK
WEST WINDS
DIAMOND PARK
OAK SPRINGS PARK MONKEY PARK
HARVESTCREEK
W OAK ST
PROPOSED FOWLERCONNECTIONDURSTONRD
W BABCOCK ST N19THAVEDAVISLNNFERGUSONAVECOTTONWOODRDFOWLERAVEBOZEMAN SPORTS PARK
VALLEYWESTPARK VALLEYUNITPARKFIRE STATION #3
GALLATIN HIGH SCHOOL
HYALITE ELEMENTARY SCHOOL
KIRK PARK
MEADOWLARK ELEMENTARY SCHOOL
EMILY D. ELEMENTARY SCHOOL
WOAK ST
PROPOSED FOWLERCONNECTION
CATERPILLAR ST
FARMALLST
ANNIEST
LILYDR
JOHNDEEREST
NEW HOLLANDDRDAVISLNHARMONY WAY10.03ACRES
Context Plan
Fowler Site Study |Bozeman,MT
06.04.2025
About the Fowler Site
•10.3 Acres
•Unannexed and Unzoned
•Purchased for constructing Fowler Ave. as an arterial roadway
•5.5 net (remaining) acres after roadway
•Estimated value: $6-7 million
•Direction to explore for-sale, missing-middle community housing
options for this property
Public Engagement
•Open House 1 - June 4, 2025
•Open House 2 – June 4, 2025
•Harvest Creek HOA Townhall on July 22, 2025
•Economic Vitality Board – August 6, 2025
•Launched engage Bozeman site uRL
Next Step:
•Annexation and Zoning Application
Guiding Questions
1.4-story townhomes?
2.What is the commission’s direction on zoning options?
3.What other site design considerations should we think about if we create a planned development zone (PDZ)?
Site Exploration
Zoning and Density Study
•Staff and consultants explored the kinds of development that occur with different zoning options.
•3 residential zoning districts explored:
•R-5, Residential Mixed -Use High Density District
•R-4, Residential High Density District
•R-3, Residential Medium Density District
Exploring Zoning District Options
Fowler Site Study |Bozeman,MT
06.04.2025
VIEW LOOKING SOUTH-EAST FROM FOWLER AND OAKPREVIOUSOPTIOND-180UNITS VIEW LOOKING SOUTH-EAST FROM FOWLER AND OAKPREVIOUSOPTIONC-144UNITS
VIEW LOOKING SOUTH-EAST FROM FOWLER AND OAKPREVIOUSOPTIONB-68UNITS VIEW LOOKING SOUTH-EAST FROM FOWLER AND OAKPREVIOUSRBDENSITY-114 UNITS
STATS
·114 UNITS·24.9 UNITS/NET AREA
·~1,219 SF FOOTPRINTS
·3-OR 4-STORIES
·149 PARKING SPACES·1.3 SPACES/UNIT
·138,970 TOTAL SF
R3 ZONING
R4 ZONINGR5 ZONING
R3 DENSITY (FUTURE RB)
Potential Housing Options by Zoning
Fowler Site Study |Bozeman,MT
06.04.2025
VIEW LOOKING SOUTH-EAST FROM FOWLER AND OAKCURRENTCONCEPT-84UNITS
USEVARIETY OF TOWNHOMES TOREDUCEHEIGHT ADJACENTTOEXISTINGHOMES
ARTICULATED MASSING STEPS DOWNADJACENTTOSTREETS
DENSITYREDUCED TO FIT SCALE OF EXISITNG NEIGHBORHOOD
STATS
·84 UNITS·18.4UNITS/NETAREA
·~1,571SF FOOTPRINTS
·2-OR 4-STORIES
·140 PARKING SPACES·1.67SPACES /UNIT
·~131,900TOTAL SF
R3 DENSITY (FUTURE RB)
PROPOSED NEXT STEPS:ANNEXATION AND R3 ZONING,APPLICATION SUMMER OF 2025
Concept Unit Plans
Fowler Site Study |Bozeman,MT
06.04.2025
UNIT T1
+/-1,507 FINISHEDSF+/-539 GARAGESF
21OCCURENCES SCALE:3/16" =1'-0"
+/-1,007 FINISHEDSF+/-500 FINISHEDSF
BATH
LIVING ROOM21'-1"x19'-6"
W.I.C.
BATH
L.MUDROOMQUEENBEDROOM11'-11"x 11'-0"QUEENPOWDER
GARAGE23'-1"x22'-0"
UP
DN
PATIOENTRY
L.ENTRY
BEDROOM10'-10"x11'-0"
BEDROOM12'-0"x12'-0"
STUDYQUEENW.I.C.
W.I.C.W
D
SHELFSHELFKITCHEN
P.
FAU
JULIETTE
ROOFBELOW
UNIT T2
+/-1,592 FINISHEDSF+/-284GARAGESF 63OCCURENCES
SCALE:3/16" =1'-0"
C.
W/D
BATH
L.QUEENBEDROOM11'-4"x10'-9"
LIVING ROOM11'-4"x12'-0"
BEDROOM11'-4"x10'-9"
C.
BATH
L.
L.
L.
C.QUEENBEDROOM11'-4"x9'-8"QUEENSTUDY/ FLEX11'-4"x10'-0"
KITCHEN/ DINING9'-4"x12'-1"
FAU
POWDER
C.
GARAGE11'-4"x24'-3"
UP UP
DN
UP
DN DN
ROOF DECK11'-4"x11'-10"
+/-525FINISHEDSF +/-525 FINISHEDSF +/-373FINISHEDSF+/-169 FINISHEDSF
ENTRY
ENTRY
Accessible Option
Fowler Site Study |Bozeman,MT
06.04.2025
VIEW LOOKING NORTH EAST FROM FOWLERCURRENTCONCEPT
Conceptual Perspective
KEYPLAN
Fowler Site Study |Bozeman,MT
06.04.2025
VIEWLOOKING EAST TOAMENTIY SPACECURRENTCONCEPT
Conceptual Perspective
KEYPLAN
Fowler Site Study |Bozeman,MT
06.04.2025
VIEW LOOKING NORTH EAST TO OPEN SPACECURRENTCONCEPT
Conceptual Perspective
KEYPLAN
Fowler Site Study |Bozeman,MT
06.04.2025
VIEWLOOKING SOUTH TO RESIDENT BUFFERCURRENTCONCEPT
Conceptual Perspective
KEYPLAN
Public Policy Choices
Lower Density Higher Density
Fewer Affordable Homes More Affordable Homes
Less Subsidy More Subsidy
Higher Sales Price Lower Sales Price
Affordable Home Ownership
•Affordability Defined as a Monthly Payment that is 30% of pre-tax income
•HUD 100% Area Median Income (AMI / MFI) 4-person household: $119,000
•Sales Price Targets
•120% AMI Income Limit: $142,800 Sales Price: $488,300
•130% AMI Income Limit: $154,700 Sales Price: $533,700
•140% AMI Income Limit: $166,600 Sales Price: $579,200
•There is no affordability without subsidy.
•Free land is not enough subsidy to reach 120% AMI price goal.
Long -Term Affordability
•Community Land Trust Model
•Maintains the public investment and ensures long-term affordability
•Stewards the unit
•Models:
•Bridger View Neighborhood, Headwaters Community Housing Trust
•Willow Springs, HRDC
•Details of the ownership model will be the subject of engagement later in the process
Next Step - Zoning
•Zoning places boundaries on what can happen on the site.
•Future site design is constrained by these boundaries.
•Stable rules allow for a more focused design process.
Planned Development Zones (PDZ)
•Provides flexibility in the development code in exchange for a defined community benefit – affordable housing
•Affordable Housing PDZ
•Has a For-Sale housing option
•Requires at least 10% affordable homes at 120% AMI
•This project aims for 100% affordability.
Option 1: (Recommended)
R-3/ Planned Development Zone (PDZ)
•Allow smaller lot sizes for a for-sale project.
•Modify lot width minimum.
•Modify lot coverage requirement
•Modify floor area ratio (FAR) standards.
•Set a building height limit
•Require a zone edge transition with adjacent property.
Option 1: (Recommended)
R-3 / Planned Development Zone (PDZ)
R-3 PDZ Pros
•Allows for enhanced public engagement and clear boundaries on future development
•R-3/ PDZ Cons
•Costs $150,000
•Time: Takes 12+ months to complete
Option 2:
R-5 Zoning (Not recommended)
R-5 Pros
•Allows the project to be completed under an existing zoning district
•Cost
•Standard annexation and zoning application costs $25,000
•Tim e
•Standard zoning can be completed in 6 months
R-5 Cons
•R-5 is concerning for lower density adjacent neighborhood
•Feasible mass and scale far exceeds what is necessary for the project
(Likely) Next Steps
•City Commission Work Session – Guidance and Direction – Tonight!
•Annexation and Zoning Application
•R-3 with a Planned Development Zone
•PDZ deals with issues related to zone edge transitions and long-term affordability•Engagement
•Selection of Stewardship (Land Trust) Partner
•Refinement of Development Concept(s)•Engagement
•Finalize Development Concepts
•Engagement
•Site Plan Application
•Competitive Selection of Development Partner
•Site Plan Approval
•Development Partner Builds the Project
Economic Vitality Board
•The EV Board voted 3-2 to advise the City Commission to limit development of the site to 3 stories.
•Alternative motion to allow design flexibility up to 4 stories received 2 votes.
Public Comment Summary
•4 story buildings are too tall
•Site density (too much)
•Adequacy of parking (too little)
•Traffic in neighborhood
•Adequacy of on-site open space
•Adequacy of parkland
•Concerns about the impact of deed restricted homes on home values
•Alley and parking space near existing residences
•Front yards in back yards
•Coordination between the road project and the housing project
•Separation from Harvest Creek
•Connection to Harvest Creek
Guiding Questions
1.4-story townhomes?
2.What is the commission’s direction on zoning options?
3.What other site design considerations should we think about if we create a planned development zone (PDZ)?