HomeMy WebLinkAbout20250812_Commission_Fowler60Bozeman City Commission
60% Design Special Presentation
August 12, 2025
FOWLER AVENUE
Huffine Lane to Oak Street
Pre-Design OutcomesConditions for Design Phase
•One travel lane in each direction•Left turn lanes as needed•Traffic signal intersection control at Babcock•Roundabout intersection control at Durston•Wide shared-use paths in both directions•Utilization of flexible design criteria to preserve existing tree canopy
S. 8TH Street, City of Bozeman
Pre-Design Outcomes2-LANE TYPICAL SECTION USING
EXISTING STREET SIGNAL
IMPROVE EXISTING TRAIL
SHIFT ALIGNMENT
NARROW BOULEVARDMAINTAIN OPEN DITCH
30% Design ReviewOaktoDurston
DurstontoBabcock
BabcocktoHuffine
REMOVE MEDIAN /
NARROW TYPICAL
SECTION
REDUCE STREET
CONNECTIONS
REMOVE BIKE LANE
ADD TRAFFIC CALMING
REMOVE BIKE LANE
60% Design ReviewOaktoDurston
DurstontoBabcock
BabcocktoHuffine
60% Public EngagementFuture Fowler Walking Tour
60% Design ReviewOak to Durston
60% Design ReviewDurston to Babcock
60% Design ReviewBabcock to Huffine
60% Design ReviewTotal Construction Cost Estimate
•Pre-Design - $17.5m•30% Design - $13.9m•60% Design - $14.4m
$7.0m
$3.6m
$3.7m
Unscheduled
Thank You!
https://engage.bozeman.net/fowler
Next Steps:
•Final right-of-way acquisition, Ongoing •Funding appropriated in FY25 Biennium Budget•Final Design – Oak to Durston, Fall-Winter 2025
•Funding appropriated in FY25 Biennium Budget•Traffic Control and Mitigation•Lighting•Landscaping•Construction – Oak to Durston, Spring 2026•Funding appropriated in FY25 Biennium Budget