Loading...
HomeMy WebLinkAbout20250812_Commission_Fowler60Bozeman City Commission 60% Design Special Presentation August 12, 2025 FOWLER AVENUE Huffine Lane to Oak Street Pre-Design OutcomesConditions for Design Phase •One travel lane in each direction•Left turn lanes as needed•Traffic signal intersection control at Babcock•Roundabout intersection control at Durston•Wide shared-use paths in both directions•Utilization of flexible design criteria to preserve existing tree canopy S. 8TH Street, City of Bozeman Pre-Design Outcomes2-LANE TYPICAL SECTION USING EXISTING STREET SIGNAL IMPROVE EXISTING TRAIL SHIFT ALIGNMENT NARROW BOULEVARDMAINTAIN OPEN DITCH 30% Design ReviewOaktoDurston DurstontoBabcock BabcocktoHuffine REMOVE MEDIAN / NARROW TYPICAL SECTION REDUCE STREET CONNECTIONS REMOVE BIKE LANE ADD TRAFFIC CALMING REMOVE BIKE LANE 60% Design ReviewOaktoDurston DurstontoBabcock BabcocktoHuffine 60% Public EngagementFuture Fowler Walking Tour 60% Design ReviewOak to Durston 60% Design ReviewDurston to Babcock 60% Design ReviewBabcock to Huffine 60% Design ReviewTotal Construction Cost Estimate •Pre-Design - $17.5m•30% Design - $13.9m•60% Design - $14.4m $7.0m $3.6m $3.7m Unscheduled Thank You! https://engage.bozeman.net/fowler Next Steps: •Final right-of-way acquisition, Ongoing •Funding appropriated in FY25 Biennium Budget•Final Design – Oak to Durston, Fall-Winter 2025 •Funding appropriated in FY25 Biennium Budget•Traffic Control and Mitigation•Lighting•Landscaping•Construction – Oak to Durston, Spring 2026•Funding appropriated in FY25 Biennium Budget