Loading...
HomeMy WebLinkAbout011 - L3.0_Landscape Details � W N ��........�� Q N .• �F M ••. .• •. ;°��• .N�.�.� p �i :,�P • '.92� O . :� a . � . ' A A. • • ��t��� � �/WILLIAMS . . . � f's �2 = : S y�, ���Z�.•t l�� • V • :2��. i ; • �, ENS�.����;: ; •. .� � . NOTES: ��CqP�•ARG•���. 1 . PLANT MATERIALS MUST MEET THE MINIMUM ACCEPTABLE STANDARD '•'••°°••••• b d � PRUNE SHRUB TO REMOVE SET BY THE AMERICAN ASSOCIATION OF NURSERYMEN'S AMERICAN � � STANDARD FOR NURSERY STOCK, ANSIZ60.1 . BROKEN, DAMAGED, o DEAD OR DAMAGED BRANCHES � z DISEASED, OR SUBSTANDARD STOCK WILL BE REJECTED. p z O 2. BARK PROTECTOR TO BE BLACK PLASTIC MESH TREE GUARD. INSTALL �� MULCH LAYER PER SPECS. TAPER � ON ALL TREES. p po _ � 3. REMOVE ALL TWINE OR STRING AND BURLAP FROM TOP THIRD OF ����� � o� CREATE SAUCER AROUND SHRUB DEPTH AT EDGE TO KEEP 1" BELOW � � ROOTBALL AND REMOVE ENTIRE WIRE BASKET. � � o HARDSCAPE SURFACE (WHERE OCCURS) �� p b MULCH AS SPECIFIED. PULL � U 4. THE ROOT FLARE OF ALL TREES SHALL BE LEVEL WITH OR UP TO 1" v � bb ' � MULCH AWAY FROM STEM. L.L� w � ABOVE GRADE. d „ , 5. ALL TREES SHALL BE INSTALLED WITH A TEMPORARY SAUCER OF RAISED � MULCH NOT TO EXCEED 4 DEPTH � � J INSTALL WEED BARRIER FABRIC THROUGHOUT 2'5 SOIL AT THE EDGE OF ROOT BALL TO CONTAIN WATER. REMOVE OR v p � ENTIRE AREA OF SHRUB BEDS. LAP 6" AT JOINTS. () BREACH WATER SAUCER BEFORE WINTER. BURY PERIMETER EDGE OF FABRIC INTO SOIL. � � 6. STAKING IS NOT MANDATORY. HOWEVER, THE CONTRACTOR SHALL FINISHED GRADE U REPLACE ANY UN-STAKED TREE WITHOUT QUESTION IF DIRECTED TO DO OF ADJACENT TURF FINISH GRADE OF PLANTING AREA. TAPER GRADE � o REMOVE ROOT CONTAINMENT DOWN AT ADJACENT HARDSCAPE (WHERE w � SO AT ANY TIME THROUGH COMPLETION OF WARRANTY PERIOD. MULCH/LAWN FINISHED 7. STAKES SHALL BE 2" x 2" x 6' FIR STAKES. MINIMUM 2 PER TREE. STAKES MATERIALS IF PRESENT EDGE AS NOTED GRADE OCCURS) TO ACCOMMODATE MULCH LAYER. � .::..__ SHALL NOT PENETRATE ROOT BALL. STAKES SHALL BE REMOVED AFTER w ::.. ::::. ..... ONE YEAR. MULCH AS NOTED � �" � . :. ii ii i . o ���iiiiii_ iiiiiii�ii� 8. TREE TIES SHALL BE 1" MINIMUM WIDE FLEXIBLE BELT-LIKE STRAPPING. � � m �i iii iiiiiii i iiiiiiii DO NOT USE ROPE OR WIRE. DO NOT OVER-TIGHTEN. 12" MIN BACKFILL WITH ' � �����\�j\�j/\�j/\� �/�\ 3�� � OU i i�iii i i i i i iii-i ' / / / / // / ii i i iii-iii iii iii iii iii ii__ i=iii 9. MULCH AS SPECIFIED. PULL MULCH AWAY FROM TRUNK A MINIMUM OF EXCAVATED HOLE SEE NOTE 2 AMENDED TOPSOIL - � - - —— �—I I I=I I �/ �/�\/\ iii iiiiiiiiiiiiiiiiiiiiiiiiiiiii iii iiiiiiiiiiiiiiiiiiiiii iii-iii-iii iii iii-iii_ 6„ � , _ _ \ \ \ � ` - � � I I I—I I I—I I I—I I I—I I I—� i �� FABRIC STAPLE O � 10. PROVIDE A 5' MULCH RADIUS AROUND ALL TREES. , I I i I I I I I I II —I I I—I I I—I I I—I I I—I I I I I I3�� I , I I I I I ��� '� PLACEMENT PER SPECS. z EXCAVATE HOLE: � 11 . REMOVE TAGS AND LABELS FOLLOWING SUBSTANTIAL COMPLETION. I I I I I I I I I I I—' � �—I I I I I I I=I I I—I I — SEE NOTE 12 12. PRUNE TREE TO REMOVE DEAD OR DAMAGED LIMBS OR BRANCHES. I I I I I I—� � I I I—I I I I I I AMENDED TOPSOIL LAYER. DEPTH 13. EXCAVATED HOLE WIDTH TO BE 3 TIMES THE DIAMETER OF THE NOTES: I -I I I I I I- PER SOIL PREPARATION SPECS. ROOTBALL. DEPTH TO EQUAL THE HEIGHT OF THE ROOTBALL. 1 . SHRUBS TO BE PLANTED TO BEAR THE SAME RELATION TO FINISH GRADE I I i " AS ORIGINALLY GROWN IN THE NURSERY. I I I -I I I= I_ I I_� N A T I V E U N D I S T U R B E D S O I L. 2. EXVATED HOLE TO BE 2 TIMES THE DIAMETER OF ROOTBALL. —� , � o � U � DECIDUOUS TREE PLANTING 2 SHRUB PLANTING 3 METAL EDGING 4 FABRIC & MULCH � ° � L3.0 Np` L3.0 N'4 L3.0 N'°` L4.0 NA � .€ � Z a 3 � z } w > � D � ,. O Z Q U Z � � ¢ � � Z � o � � � rn w p � 2 �� W � U Z Z J O w W � N � � � O � m LL DRIP IRRIGATION SEE CIVIL FOR CURB AND GUTTER CONCRETE SIDEWALK VARIES - SEE CIVIL PLANS , � iF- � PIPE SLEEVE ,i - - %' ' %ij�ij� � FOR IRRIGATION �\//�i ' BURIED AT .__ . .�i�!�\�T\!i?��i����i- � M LEAST 12» 4' � SOIL VAULT WITH STRUCTURAL SOIL. Z �/, NOTES: — J 1. SOIL VAULT SHALL BE CONSTRUCTED FOR ALL STREET TREES. 1 0 Q 2. SOIL VAULT SHALL BE CONSTRUCTED WITHIN ALL AREAS TO RECEIVE PAVER TREATMENT. � z Q 3. STRUCTURAL SOIL SHALL CONFORM TO USDA SOIL CLASSIFICATION SYSTEM CONSISTING OF � � w GRAVEL <5%, SAND 25-30%, SILT 20-40%, CLAY 25-40%. 4. STRUCTURAL SOIL SHALL BE INSTALLED IN 6" LIFTS AND MEET 95% PROCTOR DENSITY. m Z Q w � �.�..� 5 TREE GRATE PLANTING U � � L3.0 NA � ZQ Q � � U 0 w � w � � H m ZQ � J � � 0 � � w � a U N � Z Q J � O O M IMEG Project No: 0 24006341 .01 0 � File Name: � O 24006341.00_LANDSCAPE � / C C PYRIGHT 2025 � ALL RIGHTS RESERVED Q J Field Book No: NA 5 �j N � Drawn By: LR � w Checked By: EW �i N O O O � Date: 04/28/2025 �M N 0 �, L3 . 0 � N .� T N O O o% Sheet 3 of 6 � �