Loading...
HomeMy WebLinkAbout009 - L1.0_Cover Sheet GENERAL NOTES: EXISTING CONDITIONS: FERTILIZING, MULCHING, RESTORING PLANTING SAUCERS, RESETTING TO I F ZE AN - IT O FIC BUILDI G SHEET INDEX N N PROPER GRADES OR VERTICAL POSITION, AND PERFORMING OTHER USDA PLANT HARDINESS ZONE: 4B (-25°F TO -20°F) ~ � � A. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND UTILITY LOCATIONS A. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL VERIFY ALL EXISTING OPERATIONS AS REQUIRED TO ESTABLISH AND MAINTAIN HEALTHY, VIABLE L1 .0 LANDSCAPE NOTES Q �j � PRIOR TO START OF WORK. ANY DISCREPANCIES SHALL BE REPORTED TO THE CONDITIONS AND ELEVATIONS, THE CONTRACTOR SHALL REVIEW THE PLANTINGS. SPRAY OR TREAT AS REQUIRED TO KEEP TREES AND SHRUBS FREE CITY OF BOZEMAN LANDSCAPE CODE ANALYSIS L2.0 LANDSCAPE PLAN O O PROJECT MANAGER AND LANDSCAPE ARCHITECT. ALL WORK AND MATERIALS PROPOSED PLANS AND CONFIRM THAT DESIGN ELEVATIONS AND GRADES OF INSECTS AND DISEASE. GENERAL LANDSCAPE REQUIRED: L3.0 LANDSCAPE DETAILS SHALL BE IN COMPLETE ACCORDANCE WITH CITY OF BOZEMAN DESIGN MATCH EXISTING FIELD CONDITIONS. c. FILL IN AS NECESSARY SOIL SUBSIDENCE THAT MAY OCCUR BECAUSE OF L4.0 IRRIGATION PLAN STANDARDS, PROJECT SPECIAL PROVISIONS, AND ALL OTHER GOVERNING SETTLING OR OTHER PROCESSES. STREET FRONTAGE TREES L5.0 IRRIGATION DETAILS AGENCY STANDARDS. SHOP AND FABRICATION DRAWINGS: d. REPLACE MULCH MATERIALS DAMAGED OR LOST IN AREAS OF SUBSIDENCE. STREET TREE REQUIRED AT A RATE OF 1 LARGE CANOPY TREE FOR EVERY 50 LF OF STREET B. ANY MEETINGS, PRE CONSTRUCTION, POST CONSTRUCTION, INSPECTIONS AND e. APPLY TREATMENTS AS REQUIRED TO KEEP PLANT MATERIALS, PLANTED AREAS, FRONTAGE OR TWO SMALL CANOPY TREES FOR EVERY 50 LF OF STREET FRONTAGE. PERMITS REQUIRED AS PART OF THE CITY OF BOZEMAN LANDSCAPE AND A. THE CONTRACTOR SHALL PREPARE AND SUBMIT FABRICATION DRAWINGS, AND SOILS FREE OF PESTS AND PATHOGENS OR DISEASE. USE PRACTICES TO TRAKKER TRAIL: 156 FT IRRIGATION PERFORMANCE AND DESIGN STANDARDS MANUAL AND CITY OF DESIGN MIX INFORMATION, MATERIAL TESTING COMPLIANCE DATA, AND ANY MINIMIZE THE USE OF PESTICIDES AND REDUCE HAZARDS. CABALLO AVE: 100 FT BOZEMAN MUNICIPAL CODE ARE THE RESPONSIBILITY OF THE CONTRACTOR. OTHER PERTINENT DATA TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR f. APPLY PESTICIDES AND OTHER CHEMICAL PRODUCTS AND BIOLOGICAL TOTAL FRONTAGE: 256 FT/50 = 5.12 LARGE TREES OR 10.24 SMALL TREES C. DO NOT SCALE DRAWINGS. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS TO PLACEMENT OF MATERIALS. FOLLOWING REVIEW THE CONTRACTOR SHALL CONTROL AGENTS IN ACCORDANCE WITH AUTHORITIES HAVING JURISDICTION z AND EXISTING CONDITIONS PRIOR TO BEGINNING WORK. START OF WORK RESUBMIT COPIES OF ANY DRAWINGS WHICH REQUIRE REVISION OR AND MANUFACTURER'S WRITTEN RECOMMENDATIONS. COORDINATE TREES REQUIRED = 5 LARGE TREES OR 10 SMALL TREES � O CONSTITUTES ACCEPTANCE OF CONDITIONS. CORRECTION. APPLICATIONS WITH OWNER'S OPERATIONS AND OTHERS IN PROXIMITY TO THE TREES PROVIDED = 5 LARGE TREES z D. INCREASE TO CONTRACT SUM OR TIME WILL NOT BE APPROVED FOR B. ANY REVIEW BY THE ARCHITECT WILL NOT RELIEVE THE CONTRACTOR OF WORK. NOTIFY OWNER BEFORE EACH APPLICATION IS PERFORMED. � ~ SITE TREE REQUIREMENT a CONDITIONS OR SITUATIONS EVIDENT AT TIME OF BIDDING. RESPONSIBILITY FOR ERRORS OR OMISSIONS, INADEQUATE DESIGN (n � E. NOTIFY THE PROJECT MANAGER IMMEDIATELY OF ANY DISCREPANCIES OR PERFORMANCE REQUIREMENTS, OR SCHEDULE REQUIREMENTS. THE PLANTING SOILS TREES REQUIRED: 1 TREE PER 1,600 SF OF LANDSCAPED AREA AMBIGUITIES ON THE DRAWINGS AND/OR IN THE SPECIFICATIONS. CONTRACTOR SHALL REMAIN SOLELY RESPONSIBLE FOR FULL AND COMPLETE a. ALL LANDSCAPE AREAS TO RECEIVE A MINIMUM OF 6" OF TOPSOIL THROUGHOUT 404.7 SF (AREA OUTSIDE 10' AWAY FROM BUILDING)/ 1 ,600 SF = .28 = 0 TREES � � F. CHANGES OR DEVIATIONS FROM THE DRAWINGS MADE WITHOUT THE WRITTEN PERFORMANCE IN ACCORDANCE WITH THE TERMS, CONDITIONS, PROVISIONS, THE ENTIRE PLANTING AREA. TREES PROVIDED = 5 TREES w W � N CONSENT OF THE PROJECT MANAGER AND/OR APPROVED CHANGE ORDER WILL DRAWINGS, AND SPECIFICATIONS. b. AMEND EXISTING TOPSOIL AT A RATE OF 4 CY OF COMPOST PER 1 ,000 SF. � � W W SCREENING J J BE CONSIDERED UNAUTHORIZED. COMPOST MUST MEET THE STATE OF MONTANA'S COMPOST REQUIREMENT FOR () U G. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION AND COMPLETION OF INSPECTION AND TESTING: SOIL AMENDMENT (ADMIN. RULE MONT. 17.50.1716). COMPOST MUST BE �NDSCAPE BUFFER AND SCREENING - U U ALL WORK SHOWN AND SHALL COORDINATE WORK BETWEEN TRADES PRIOR TO SPREAD AND MIXED EVENLY INTO THE TOP 6" OF TOPSOIL. PROVIDED: SCREENING IS PROVIDED FOR THE MECHANICAL EQUIPMENT ON THE WEST .••'��������''•• BEGINNING WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL REQUIRED AND c. REMOVE STONES THAT ARE, AT A MIN., LARGER THAN 2", STICKS, ROOTS, SIDE OF THE BUILDING •�.��•OF,MpN���.• > � H. MAINTAIN A CLEAN WORK SITE AT ALL TIMES. NECESSARY INSPECTIONS ARE PERFORMED. CONSTRUCTION DEBRIS, AND OTHER EXTRANEOUS MATTER, AND LEGALLY :��P�j����� i A ��;�y:� W W I. NOTIFY PROJECT MANAGER AND OWNER IN WRITING OF ANY EXPECTED DISPOSE OF THEM OFF THE PROPERTY. LANDSCAPE DESIGN PLAN : �""��A�A. • > > DISRUPTIONS IN SERVICE OR CHANGES IN CONSTRUCTION SCHEDULE AND WARRANN: d. DO NOT APPLY MATERIAL OR SCARIFY IF SOIL IS FROZEN, MUDDY, OR : z �/WILLIAM�� W W OBTAIN WRITTEN PERMISSION AS SPECIFIED. EXCESSIVELY WET. 1 .COMPLIANCE PATHWAY - PRESCRIPTIVE. ;r; �2 � � � � J. ALL AREAS USED FOR CONSTRUCTION AND/OR DAMAGED DURING THE A. IF WITHIN ONE YEAR AFTER ACCEPTANCE OF THE WORK ANY OF THE WORK IS e. PROTECT AREAS OF IN-PLACE SOIL FROM ADDITIONAL COMPACTION � '•�2�-.��"-12��0,:l�Ci: m O ' � 2.T O T A L L A N D S C A P E D A R E A 2 8 1 2.7 S F (6 0% = 1 6 8 7.6 S F) • EXECUTION OF THIS CONTRACT, INCLUDING STAGING AREAS, LANDSCAPE AND FOUND TO BE DEFECTIVE OR NOT IN ACCORDANCE WITH THE CONTRACT DISTURBANCE, AND CONTAMINATION DURING CONSTRUCTION. •.�s •., E N S... �'��.. � U SITE ELEMENTS, SHALL BE REPAIRED AND/OR RESTORED UPON COMPLETION OF DOCUMENTS AND/OR DRAWINGS AND UPON WRITTEN NOTICE FROM THE 3.LANDSCAPED AREAS - PLANT TYPES & LOCATIONS �'°C�p��ARG,r'� THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING ARCHITECT, THE CONTRACTOR SHALL CORRECT ANY WORK BEGINNING WITHIN PLANT REPLACEMENT ��'""°•"°� 4.SQUARE FOOTAGE AND PERCENT COVERAGE BASED OFF TOTAL LANDSCAPED AREA O � N LANDSCAPE, SITE AND ELEMENTS WITHIN STAGING AREAS, CONSTRUCTION SEVEN CALENDAR DAYS OF SAID WRITTEN NOTICE. SHOULD THE CONTRACTOR a. REMOVE AND REPLACE DEAD TREES OR PLANTS AS SOON AS POSSIBLE. z VICINITY, AND/OR AS NOTED ON THE DOCUMENTS. FAIL TO RESPOND TO THE WRITTEN NOTICE WITHIN THE DESIGNATED TIME, THE b. DETERMINE CAUSE OF DEATH OF PLANT AND ACT ACCORDINGLY SHOULD a.TURF - 0 SF/0% K. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPLE AREAS AND LIMITS OF OWNER MAY CORRECT THE WORK AT THE EXPENSE OF THE CONTRACTOR. REPLACEMENT WITH A PLANT OF ANOTHER VARIETY BE REQUIRED. b.SEED MIX (NATIVE WILDFLOWER) - 0 SF/0% CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAYBE NECESSARY IN AREAS NOT SHOWN ON LANDSCAPE MAINTENANCE PLAN: PERMITS c.SHRUBS, EVERGREENS, GRASSES, GROUNDCOVERS - 1 ,698.9 SF/60.4 % ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, a. BE SURE TO OBTAIN ANY AND ALL NECESSARY PERMITS FOR WORK PERFORMED 5.PLANT SCHEDULE MECHANICAL, AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL IRRIGATION SYSTEM IN BOULEVARD OR ANY ADDITIONAL AREA WHERE PRIOR APPROVAL IS � � WORK SHALL BE PART OF THIS CONTRACT AND ALL TRADES SHALL INSPECT REQUIRED. 6.TREES - THERE ARE NO AREAS OUTSIDE OF 10' AWAY FROM THE BUILDING THAT ARE � ° � THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN GENERAL INFORMATION OVER 6" WIDE. NO EXISTING TREES. � o � ACCORDANCE WITH THE CONTRACT REQUIREMENTS AT NO ADDITIONAL COST. a. THERE IS AN AUTOMATIC IRRIGATION SYSTEM. WINTER MAINTENANCE 7.M U L C H - 3" B A S A L T C H I P R O C K M U L C H 3" F I R O R P I N E B A R K C H I P S (I N B O U L E V A R D CO °' L. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL COMPONENTS b. SEE IRRIGATION CONTRACTOR'S AS-BUILT DRAWINGS FOR: IRRIGATION SYSTEM a. DO NOT ALLOW EXCESSIVE AMOUNT OF SNOW TO REMAIN ON PLANTINGS FOR AREAS). = 3 Z AND ACCESSORIES FOR A COMPLETE AND FINISHED INSTALLATION FOR ALL PIPING, INCLUDING PLAN LAYOUT, AND LOCATIONS,TYPES, SIZES, CAPACITIES, EXTENDED PERIODS OF TIME. a 3 � PRODUCTS SHOWN ON THESE DRAWING SHEETS. AND FLOW CHARACTERISTICS OF IRRIGATION SYSTEM PIPING COMPONENTS. b. MAINTAIN WALKS AND DRIVES FREE FROM SNOW AND ICE. 8.TOPSOIL - AMEND EXISTING TOPSOIL AT A RATE OF 4 CY COMPOST/1 ,000 SF. COMPOST z } M.THE SPECIFICATIONS INCLUDED WITHIN THESE DRAWING SHEETS ARE AN PLUMBING COMPONENTS, VALVES, PIPING, SPRINKLERS AND DEVICES, MUST MEET THE STATE OF MONTANA'S COMPOST REQUIREMENT FOR SOIL � INTEGRAL PART OF THESE DOCUMENTS. IT IS THE RESPONSIBILITY OF THE ACCESSORIES, CONTROLS, AND WIRING. AS WELL AS, AREAS OF SPRINKLER AMENDMENT (ADMIN. RULE MONT. 17.50.1716). COMPOST MUST BE SPREAD AND � CONTRACTOR TO REVIEW ALL INFORMATION ENCLOSED. SPRAY, WIRE SIZE AND NUMBER OF CONDUCTORS FOR EACH CONTROL CABLE. NATURAL STONE RETAINING WALL NOTES: MIXED EVENLY INTO THE TOP 6 IN. OF TOPSOIL. o N. THE CONTRACTOR SHALL CONTROL DUST IN ACCORDANCE WITH REGULATIONS SYSTEM INSTRUCTION AND MAINTENANCE INSTRUCTION PROVIDED BY a. CUT BLOCKS CAN ONLY BE USED FOR THE END OF WALLS, AND THE CUT SIDE Q OF LOCAL AIR POLLUTION CONTROL AUTHORITY. THE CONTRACTOR SHALL INSTALLATION CONTRACTOR. OF THE BLOCK CAN NOT BE SHOWN. 9.WATER TREATMENT, STORMWATER RETENTION, OR STORMWATER DETENTION - SEE � PROTECT ADJACENT PROPERTIES, PUBLIC AND PRIVATE, AT ALL TIMES DURING b. ENSURE SHORT SIDE OF ONE BLOCK DOES NOT SIT ON TOP OF ANOTHER SHORT PLAN. � CONSTRUCTION. STARTUP AND WINTERIZATION SIDE TO MAINTAIN INTERLOCKING INTEGRITY. 10. EXEMPT AREAS PER SECTION 1 .3 AND 1 .4 - NA. > Z a. SERVICE STARTUP c. VERTICAL SEAMS MUST STAGGER AT LEAST 6" TO AVOID VERTICALLY ALIGNED o � � PLANTING NOTES: i. BEGIN IRRIGATION SYSTEM ANNUALLY AS NECESSARY, TYPICALLY APRIL. SEAMS � � w ii. COMPLETE STARTUP CHECKS ACCORDING TO MANUFACTURER'S WRITTEN d. STONE BLOCKS MUST BE MCCREGOR LAKE DRYSTACK FROM MONTANA W � � A. LANDSCAPE/IRRIGATION CONTRACTOR SHALL COORDINATE INSTALLATION OF INSTRUCTIONS. ROCKWORKS OR AN APPROVED EQUAL. O Q � ALL LANDSCAPE/IRRIGATION MATERIALS WITH GENERAL CONTRACTOR. iii. ALL ZONES SHOULD BE TESTED TO INSURE COVERAGE OF ALL AREAS. e. THE CONTRACTOR MUST SUBMIT A SAMPLE OF DRYSTACK WALL MATERIAL TO B. CONTRACTOR TO EVALUATE EXISTING SITE CONDITIONS AND REMEDY AS iv. ADJUST SETTINGS OF CONTROLLER AS NECESSARY. THE LANDSCAPE ARCHITECT FOR APPROVAL. `� w � REQUIRED TO PROVIDE FOR HEALTHY PLANT GROWTH AND MITIGATE UNSIGHTLY b. SERVICE FOR WINTERIZATION f. THERE MUST BE 12" OF DRAINAGE BACKFILL BEHIND THE RETAINING WALL, o m o CONDITIONS. i. WINTERIZATION IS REQUIRED AND RECOMMENDED BY THE END OF OCTOBER OR COMPACTED AT LEAST EVERY 4". _ { LL C. ALL PLANT MATERIAL SHALL BE INSTALLED AS DETAILED AND SPECIFIED AND EARLIER AS NECESSARY DEPENDING ON THE WEATHER. g. THERE MUST BE 12" OF DRAINAGE BACKFILL UNDER THE BOTTOM COURSE OF - - � - - - _ _ _ _ _ _ _ _ _ �_W W � I ACCORDING TO AMERICAN NURSERY AND LANDSCAPE ASSOCIATION ii. WINTERIZATION OF THE SYSTEM REQUIRES SHUTTING OFF THE WATER SOURCE THE RETAINING WALL, COMPACTED AT LEAST EVERY 4". � � STANDARDS. TO IRRIGATION SYSTEM IN THE MECHANICAL ROOM(S) AND EXPELLING THE h. THE CONTRACTOR MUST SUBMIT A SAMPLE OF THE DRAINAGE BACKFILL TO THE D. ALL PLANT MATERIAL IS COVERED BY A TWELVE (12) MONTH WARRANTY. REMAINING WATER IN THE SYSTEM WITH COMPRESSED AIR, NOT EXCEEDING 80 LANDSCAPE ARCHITECT FOR APPROVAL. � _� o�� _TRAKKER TRAIL E. PLANT, PLACE TOPSOIL AND RE-GRADE ALL PROPOSED LAWN AREAS PSI, WORKING THROUGH ALL OF THE ZONES. i. PLACE PERMEABLE FABRIC BEHIND DRAINAGE BACKFILL AND UNDERNEATH ��' -�- ��� � -�-� � -� DISTURBED BY CONTRACTOR'S OPERATIONS AS PER PLANS AND SPECIFIED. DRAINAGE FILL BELOW THE WALL. I DISTURBED AREAS SHALL BE WHERE CONSTRUCTION ACTIVITIES INCLUDING MAINTENANCE j. THE CONTRACTOR MUST SUBMIT A SAMPLE OF THE PERMEABLE FABRIC TO THE TRENCHING, DEMOLITION, EARTHWORK, MATERIAL STORAGE, STAGING, a. INSPECT SYSTEM THROUGHOUT THE SEASON TO INSURE EFFICIENT OPERATION. LANDSCAPE ARCHITECT FOR APPROVAL. I I RESU TS IONR HE ROEMOVAL ORMDISPLACEM NOT OF EOX STINGIOGROUND COV R OR b REPLOCE AND R PA RESYS EM WITH THE COR ECT EPLACEMENT PART TO k BUR ED 6"6TOERE MUO BO A OTHER BLOCK PLACED BELOWOE EN�IF BLOCK IS 2 � 3 4 5 g 40 I-� I GRADE. PROVIDE SMOOTH CLEAN TRANSITION FROM EXISTING TO DISTURBED PRESERVE OVERALL PERFORMANCE. FULLY BURIED. � 8 10 11 12 1 14 15 AREA. I. A PERFORATED DRAINAGE PIPE MUST BE INSTALLED BEHIND THE WALL AT THE WATER SERVICE o� � F. REFER TO CIVIL SHEETS FOR INFORMATION REGARDING ALL GRADING, PEST MANAGEMENT BASE TO DIRECT WATER AWAY FROM THE STRUCTURE. PIPE MUST BE WRAPPED I o o°o INCLUDING UTILITY INFORMATION, SIDEWALK AND DRIVE INFORMATION, AND IN A PERMEABLE FABRIC OR A PERMEABLE SOCK TO PREVENT CLOGGING. THE o0000 CURB AND GUTTER INFORMATION. GENERAL INFORMATION COST OF THE DRAIN AND ANY ADDITIONAL MATERIAL ARE INCIDENTAL TO THE �/ G. ANY DEVIATIONS IN UTILITIES FROM THIS PLAN MUST BE SUPPLIED TO THE a. PESTICIDES REGISTERED AND APPROVED BY EPA, ACCEPTABLE TO AUTHORITIES PRICE OF THE RETAINING WALL. THE DRAIN MUST DAYLIGHT AT A SUITABLE I - �� � � PROJECT MANAGER AND OWNER IN AS-BUILT DRAWINGS. HAVING JURISDICTION, AND OF TYPE RECOMMENDED BY MANUFACTURER FOR LOCATION TO PREVENT WATER ACCUMULATION BEHIND THE WALL. �__ � z H. CONTRACTOR SHALL VERIFY ALL PLANT QUANTITIES. THE ILLUSTRATED EACH SPECIFIC PROBLEM AND AS REQUIRED FOR PROJECT CONDITIONS AND m.THE DRAINAGE PIPE MUST SLOPE AT A 1% OR GREATER SLOPE TO FACILITATE (n APPLICATION. DO NOT USE RESTRICTED PESTICIDES UNLESS AUTHORIZED IN PROPER WATER DRAINAGE. � Q a w LOCATIONS SHALL DICTATE FINAL COUNT. I I. PLANT MATERIAL SHALL NOT BE ROOT BOUND. ALL PLANTS SHALL EXHIBIT WRITING BY AUTHORITIES HAVING JURISDICTION. n. USE GEOGRID IN BETWEEN EVERY LAYER OF THE RETAINING WALL. GEOGRID I J Z � HEALTHY GROWTH AND BE FREE OF DISEASES AND PESTS. b. PESTICIDE APPLICATOR: STATE LICENSED, COMMERCIAL. MUST TIE BACK INTO THE SOIL 2'. W � -c . - J. NO PLANT SUBSTATIONS WILL BE ALLOWED WITHOUT WRITTEN CONSENT FROM c. PRIOR TO ANY ACTION CONSULT WITH THE AUTHORITY HAVING JURISDICTION o. CONTRACTOR MUST SUBMIT A SAMPLE OF THE GEOGRID TO THE LANDSCAPE � � � O THE LANDSCAPE ARCHITECT. FOR APPROVAL. ARCHITECT FOR APPROVAL. � o� J I m Z Z K. DURING INSTALLATION OF ALL LANDSCAPE WORK, CONTRACTOR SHALL KEEP p. SPECS FOR DRYSTACK WALL STONE CAN BE FOUND AT � ALL PLANTING AND HARDSCAPE AREAS CLEAN OF DEBRIS. PROTECT ALL PLANT �NEED CONTROL https://montanarockworks.com/mt-stone-products/mcgregor-lake-drystacW#pret \ o � w � w MATERIALS FROM DAMAGE DUE TO CONSTRUCTION ACTIVITIES BY ALL TRADES. GENERAL INFORMATION typhoto[specs]/0/ � m � / � V � � MAINTAIN PROTECTION THROUGHOUT DURATION OF MAINTENANCE PERIOD. a. PLANTING BEDS SHOULD BE HAND WEEDED AS NECESSARY. _ ' _ � TREAT, REPAIR, OR REPLACE ANY DAMAGED OR UNHEALTHY PLANT MATERIALS, b. HERBICIDE APPLICATOR: STATE LICENSED, COMMERCIAL. ER TH CITY OF BOZEMAN WA ER CO SERVATlO , CITY O BOZEM N LAN SCA E AND LL z � AS WELL AS, ALL OTHER LANDSCAPE WORK IMMEDIATELY. c. PRIOR TO ANY ACTION CONSULT WITH THE AUTHORITY HAVING JURISDICTION IRRIGATION PERFORMANCE AND DESIGN STANDARDS MANUAL, SECTION 3.1.3 � I � Q U L. CONTRACTOR TO NOTIFY PROJECT MANAGER OF ANY PROBLEMS WITH EXISTING FOR APPROVAL AND THAT PLAN IS CONSISTENT WITH THEIR CURRENT WEED I O � � SOIL CONDITIONS OR HIGH WATER TABLE IMMEDIATELY UPON DISCOVERY. MANAGEMENT PLAN. PRE-INSTALLATION MEETING/SOILS APPROVAL OR CERTIFICATION PRIOR TO COMMENCING -' N Q ANY WORK, THE APPLICANT MUST CONTACT THE WATER CONSERVATION DIVISION TO �/� M.COORDINATE STOCKPILING AND PLACEMENT OF IMPORTED TOPSOIL TO PROPOSED ACHIEVE FINISH GRADE AS SPECIFIED BY CIVIL PROJECTS. AFTER FERTILIZATION 2 SCHEDULE A PREINSTALLATION MEETING. THE PRE-INSTALLATION MEETING WILL ADDRESS BUILDING v, O Z THE FOLLOWING: W INCORPORATION OF SUPPLEMENTAL SOIL AMENDMENT PRODUCTS, FINISH GENERAL INFORMATION FOOTPRINT � m Q GRADE ALL PLANTING AREAS SMOOTH (FREE OF PEAKS OR DEPRESSIONS) PRIOR a. LAWN AREAS TO BE FERTILIZED THREE TIMES A YEAR WITH THE APPROPRIATE 1) THE APPROVED LANDSCAPE AND IRRIGATION PLAN AND REQUIREMENTS OF THIS 1 r, - J TO PLACEMENT OF MULCH. FERTILIZER AT TIME OF SERVICE, USE OF A REEMERGENT IN THE FALL IS MANUAL; I � � N. CONTRACTOR TO COORDINATE AND SUPERVISE THE TRENCHING OF UTILITIES RECOMMENDED. LANDSCAPE AREA LEGEND: 9 a (n AND SERVICES THROUGH LANDSCAPE AREAS. COORDINATION SHALL INCLUDE b. COMMERCIAL-GRADE COMPLETE FERTILIZER OF NEUTRAL CHARACTER, 2) TIMING OF REQUIRED INSPECTIONS INCLUDING THE FINAL INSPECTION TO OBTAIN A - ----- CONTRACTOR'S REASONABLE EFFORTS TO COMBINE AS MANY DIFFERENT CONSISTING OF FAST- AND SLOW-RELEASE NITROGEN 50 PERCENT DERIVED CERTIFICATE OF COMPLETION; � � WITHIN 10' OF BLDG: 2 408.0 SF N � � UTILITIES IN COMMON TRENCHES AS PRACTICALITIES AND GOOD PRACTICE FROM NATURAL ORGANIC SOURCES OF UREA FORMALDEHYDE PHOSPHOROUS ' a o PERMIT. � � 3) SOIL AMENDMENT REQUIREMENTS AND THE PROCESS FOR APPROVAL OF INSTALLED m m AND POTASSIUM IN THE FOLLOWING COMPOSITION. SOIL, INCLUDING THE PARTY RESPONSIBLE FOR SOILS INSPECTION; o°o°o° OUTSIDE 10' OF BLDG: 404.7 SF = o a �' O. ALL PLANT MATERIAL SHALL BE INSTALLED USING COMMON SENSE AND GOOD i. NITROGEN, PHOSPHORUS, AND POTASSIUM IN AMOUNTS RECOMMENDED IN � SOIL REPORTS FROM A QUALIFIED SOIL-TESTING LABORATORY. o °�j I U w PLANTING PRACTICES. 4) DISCUSSION OF THE DAY AND HOURS FOR IRRIGATION SCHEDULING AFTER Q P. ALL PLANTERS ARE TO BE MULCHED AS SPECIFIED. MODIFY FINISH GRADE c. SLOW-RELEASE FERTILIZER: GRANULAR OR PELLETIZED FERTILIZER CONSISTING INSTAL�ATION; o � ADJACENT TO WALKING SURFACES TO PREVENT MULCH FROM MITIGATING OR OF 50 PERCENT WATER-INSOLUBLE NITROGEN, PHOSPHORUS, AND POTASSIUM _ I Z WASHING ONTO SUCH SURFACES DURING RAIN EVENTS. SUBMIT SAMPLE OF IN THE FOLLOWING COMPOSITION. 5) THE PROCESS REQUIRED FOR MAKING CHANGES TO THE APPROVED LANDSCAPE AND i J MULCH PRODUCT INTENDED FOR USE ON PROJECT TO PROJECT MANAGER FOR i. NITROGEN, PHOSPHORUS, AND POTASSIUM IN AMOUNTS RECOMMENDED IN IRRIGATION PLAN; AND o APPROVAL PRIOR TO INSTALLATION. SOIL REPORTS FROM A QUALIFIED SOIL-TESTING LABORATORY. ° � I 0 6) INSTALLATION OF LANDSCAPING AND IRRIGATION ACCORDING TO THE APPROVED F FOC FpC Fp� Fp� � � Q. WEED BARRIER TO BE 'TYPAR 3201' AS MANUFACTURED BY LINE INDUSTRIAL ii. NUTRIENT COMPOSITION: 20 PERCENT NITROGEN, 10 PERCENT PHOSPHOROUS, �qNDSCAPING AND IRRIGATION PLAN AND REQUIREMENTS OF THIS MANUAL, WHICH IS -�G �G E G E G E G E G E G IMEG Pro ect No: � FABRICS, INC., GEOTEXTILE DIVISION, WWW.THRACELINQ.COM. INSTALL UNDER AND 5 PERCENT POTASSIUM, BY WEIGHT PLUS MICRONUTRIENTS. I � � REQUIRED TO RECEIVE A FINAL CERTIFICATE OF OCCUPANCY OR RELEASING A SECURITY AS o ALL MULCH, ALTERNATE PRODUCTS ACCEPTED WITH SUBMITTAL, REVIEW, AND d. FERTILIZER APPLICATOR: STATE LICENSED, coMMERcia�. 24006341 .01 PROVIDED BY AN IMPROVEMENT'S AGREEMENT. � APPROVAL OF PROJECT MANAGER. INSTALL WEED BARRIER FABRIC IN ALL e. PRIOR TO ANY ACTION CONSULT WITH THE AUTHORITY HAVING JURISDICTION ��-��-�� -� � _� _� � _� � PLANTING BEDS AS SHOWN ON PLAN. FOR APPROVAL. THE PRE-INSTALLATION MEETING MUST INCLUDE ALL CONTRACTORS RESPONSIBLE FOR TH - - - - FII@ NaCYI@. � R. CONTRACTOR SHALL MAINTAIN TREES AND SHRUBS FOLLOWING SUBSTANTIAL INSTALLATION OF THE LANDSCAPE AND IRRIGATION SYSTEMS. THIS MAY INCLUDE: THE -Z Z'� 24006341.00_LANDSCAPE % COMPLETION FOR TWELVE 12 MONTHS BY PRUNING CULTIVATING WATERING GENERAL MAINTENANCE APPLICANT'S GENERAL CONTRACTOR THE LANDSCAPE ARCHITECT OR OTHER DESIGN � � ) , , , � � C C PYRIGHT 2025 � WEEDING, FERTILIZING, RESTORING PLANTING SAUCERS, TIGHTENING AND PROFESSIONAL RESPONSIBLE FOR THE LANDSCAPE AND IRRIGATION DESIGN, AND ANY ALL RIGHTS RESERVED �% REPAIRING STAKES AND GUY SUPPORTS, AND RESETTING TO PROPER GRADES GENERAL INFORMATION CONTRACTOR OR SUBCONTRACTOR THAT WILL BE RESPONSIBLE FOR INSTALLING ANY - - - - - _ _ _ _ _ _ _ o � OR VERTICAL POSITION, AS REQUIRED TO ESTABLISH HEALTHY, VIABLE a. PROVIDE MAINTENANCE BY SKILLED EMPLOYEES. BEGIN MAINTENANCE COMPONENT OF THE LANDSCAPE AND IRRIGATION PLAN. ilEl� I I I I Field Book No: NA "�/ PLANTINGS. SPRAY TO KEEP TREES AND SHRUBS FREE OF INSECTS AND IMMEDIATELY AFfER PLANTS ARE INSTALLED AND CONTINUE UNTIL PLANTINGS AFTER INSTALLATION OR AMENDMENT OF ALL SOILS REQUIRED BY THE APPLICATION N � DISEASE. RESTORE OR REPLACE DAMAGED TREE WRAPPINGS. ARE ACCEPTABLY HEALTHY AND WELL ESTABLISHED, FOLLOWED BY REGULAR Drawn By: LR � w INTERVALS. APPROVAL, OR AFTER THE CITY'S APPROVAL OF A SOILS REPORT(AND AFTER THE LANDSCAPE AREA - 2,812.7 SF INSTALLATION OF ANY SOIL AMENDMENTS REQUIRED BY THE SOILS REPORT), THE Checked B EW ,n% MULCH NOTES: APPLICANT MUST CONTACT THE WATER CONSERVATION DIVISION FOR INSPECTION PRIOR y' 0 o PLANT MAINTENANCE TO THE INSTALLATION OF ANY LANDSCAPING. IN LIEU OF THE CITY INSPECTING AND Date: 04/28/2025 N � A. MULCH TO BE A 3 INCH DEPTH AND LOCATED AS ACCORDING TO PLAN. SUBMIT a. REMOVE ONLY DEAD, DYING, OR BROKEN BRANCHES. PRUNE, THIN, AND SHAP APPROVING SOILS, THE APPLICANT MAY HAVE A LANDSCAPE ARCHITECT OR LANDSCAPE N � SAMPLE TO LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO TREES, SHRUBS, AND VINES ACCORDING TO STANDARD PROFESSIONAL PROFESSIONAL CERTIFY, ON A FORM PROVIDED BY THE CITY, THE SOILS HAVE BEEN �� INSTALLATION. HORTICULTURAL AND ARBORICULTURAL PRACTICES. UNLESS OTHERWISE INSTALLED AS REQUIRED BY THE LANDSCAPE AND IRRIGATION PLAN AND THIS MANUAL. TH L 1 ■ O � `�' B. MULCH TO BE PLACED OVER PRE-EMERGENT WEED CONTROL GRANULES. INDICATED BY LANDSCAPE ARCHITECT OR LICENSED ARBORIST DO NOT CUT APPLICANT SHALL NOT INSTALL ANY LANDSCAPING UNTIL THE CITY APPROVES THE SOIL >;N C. FIR OR PINE BARK CHIPS ONLY. NO SHREDDED MULCH. NATURAL COLOR. TREE LEADERS; REMOVE ONLY INJURED, DYING, OR DEAD BRANCHES FROM PREPARATION OR RECEIVES A SIGNED CERTIFICATION. � � TREES AND SHRUBS; AND PRUNE TO RETAIN NATURAL CHARACTER. �� b. MAINTAIN PLANTINGS BY PRUNING, CULTIVATING, WATERING, WEEDING, Sheet � Of 6