Loading...
HomeMy WebLinkAbout001 - C1.0_Cover SheetNo. REVISIONSFile Name: IMEG Project No: Date: Drawn By: Checked By: Sheet of DESCRIPTION DATECOPYRIGHTALL RIGHTS RESERVEDC24006341.00_C1.0_Cover Sheet.dwg2025Field Book No:1143 STONERIDGE DR SUITE 2 BOZEMAN, MT 59718 PH: 406.582.9901 www.imegcorp.com STITES OFFICE BUILDING BOZEMAN, MONTANA COVER SHEET24006341.00MJHEDG7/3/2025C1.018BENCHMARKLOT __, BLOCK 20, BAXTER MEADOWS SUBDIVISION PHASE 2A [PLAT J-____]LOCATED IN SECTION 34, T. 01 S., R. 05 E.NE CORNER OF LOT 1A [TOP OF AC 14535LS]ELEVATION: 4,712.41 FEETDATUM: (NAVD88)SITE DATAEXISTING ZONING: (B-2) COMMUNITY BUSINESS DISTRICTFLOODPLAIN REGION: N/APROPOSED USE: COMMERCIAL/BUSINESS OFFICESBUILDING SETBACKS: FRONT--------------------------------10' (B.M.C. TABLE 38.510.030.C)SIDE -----------------------------------5' (B.M.C. TABLE 38.320.050)REAR ADJACENT TO ALLEY --5' (B.M.C. TABLE 38.320.050)OWNERCYCLONE DEVELOPMENT3970 VALLEY COMMONS DR., SUITE 2BOZEMAN, MT 59718VICINITY MAPSCALE: 1" = 200'IMEG CORP. HAS ADOPTED SAFETY PROCEDURES FOR ITS EMPLOYEES WHO PROVIDE PROFESSIONALENGINEERING AND SURVEYING SERVICES. A COPY OF THESE PROCEDURES IS AVAILABLE FROM THESAFETY OFFICER. IMEG CORP. PERSONNEL ARE NOT TRAINED IN CONTRACTOR (CONSTRUCTION)SAFETY AND COMPLIANCE PROCEDURES. THE METHODS AND MEANS TO COMPLY WITHCONSTRUCTION SITE SAFETY ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.PREPARED BYKnow what'sbelow.before you dig.CallRBOZEMAN, MTSTITES OFFICE BUILDINGTHE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE APPROXIMATE, ARESHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND ARE NOT TO BE REFERENCED FORCONSTRUCTION PURPOSES. THE IMPLIED PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BECONSTRUED BY THE OWNER, ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATEAND COMPLETE REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST ON THECONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY LOCATION, IDENTIFICATION, ANDMARKING ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. REROUTING, DISCONNECTION,PROTECTION, ETC. OF ANY UTILITY MUST BE COORDINATED BETWEEN THE CONTRACTOR, UTILITYCOMPANY AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS ASSOCIATED WITHBURIED AND ABOVEGROUND UTILITIES, REMAINS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.UTILITY NOTEDEVELOPERCYCLONE DEVELOPMENT - JON STITES3970 VALLEY COMMONS DR., SUIT 2BOZEMAN, MT 59718LANDSCAPE ARCHITECTIMEG1817 SOUTH AVE. WEST, SUITE AMISSOULA, MT 59801CIVIL ENGINEERIMEG1143 STONERIDGE DR., SUITE 1BOZEMAN, MT 59718ARCHITECTSCENIC DESIGN STUDIO8200 SADDLE MOUNTAIN RD.BOZEMAN, MT 59715SITE LOCATIONLEGAL DESCRIPTIONDATUM NOTEELEVATION CONTROL PINT (CP #1) LOCATED AT THE N.E. PROPERTYCORNER ON LOT 1A, BLOCK 20 OF BAXTER MEADOWS SUBDIVISIONPHASE 2A [PLAT J-383], WAS DETERMINED BY GPS OBSERVATIONSUSING MONTANA STATE UNIVERSITY CORS BASE STATIONELEVATION REFERENCE ON OCTOBER 14, 2024. ELEVATION GIVENFOR THIS POINT WAS 4,712.41 FEET (INT'L) NAVD88.CONSTRUCTION ROUT MAPSCALE: 1" = 100'SITE LOCATIONCONSTRUCTIONTRAFFIC CIRCULATIONAREA OF LOT 5A = 0.1935 ACRES OR 8,427 SQ. FT.AREA OF HARDSCAPE = 825 SQ. FT. OR 9.79% OF LOT 5AAREA OF STRUCTURES = 5,100 SQ. FT. OR 60.52% OF LOT 5AAREA OF PUBLIC STREETS = NONEPERCENT SITE COVERAGE = 70.31% OF LOT 5AESTIMATED TOTAL FLOOR AREA = 5,100 SQ. FT. OR 60.52% OF LOT 5AFLOOR AREA RATIO = 60.52%VEHICLE PARKING SUMMARYPARKING CALCULATIONS (PER SECTION 38.540.010.1.a & 38.540.050, TABLE 38.540.050-3)1 SPACE PER 250 SF OF GROSS FLOOR AREA5,100 SF OF FLOOR AREA *0.85 = 4,335 SF4,335 SF / 250 SF = 17 SPACES REQUIREDPARKING SPACES PROVIDED = 25 SPACES PER AMENDED PARKING AGREEMENT (DOC. NO. ___________)OPEN SPACE AND PARKLAND AREA SUMMARYNOT REQUIRED PER CONCEPTUAL SITE PLAN REVIEW COMMENTS - COB PLANNING APP NO. 24637BICYCLE PARKING SUMMARYPARKING CALCULATIONS (PER SECTION 38.540.050, A.4.)10% OF VEHICLE PARKING10% OF VEHICLE PARKING SPACES REQUIRED = 1.7 BICYCLE PARKING SPACES REQUIREDBICYCLE PARKING SPACES PROVIDED = 2 SPACESISSUE FOR PERMITACKNOWLEDGEMENT OF ACCESS REQUIREMENTS UNDER FEDERAL AND STATE DISCRIMINATION LAWS (ARM 24.301.902)THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED WITH FULL KNOWLEDGE THAT THE CITY OFBOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OFTHE FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITATION ACT OF 1973, THE FAIR HOUSINGAMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHERSIMILAR FEDERAL, STATE, OR LOCAL LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION ORMULTIFAMILY HOUSING.1 CITY REVIEW CYCLE 1 5/20/251COVER SHEET1LEGEND & NOTES2EXISTING CONDITIONS3SITE PLAN4UTILITY PLAN5GRADING PLAN6CIVIL DETAILS7CIVIL DETAILS8